Project: G-432023- Rehabilitation of The Bounda
Serial Number
Submittal Number Material Details
1 HEGC/G-432023/MS-001 Reinforcement Steel
Bars ⌀(8mm to 40mm)
2 HEGC/G-432023/MS-002 Ready-mix & Dry-mix
Concrete
3 HEGC/G-432023/MS-003 Sub-Grade CBR>30%
@95% MDD
4 HEGC/G-432023/MS-004 Subbase CBR>60%
@100% MDD
5 HEGC/G-432023/MS-005 Polythene Sheets 1000
gauge
Precast Boundary
6 HEGC/G-432023/MS-006 Walls & Other
elements
7 HEGC/G-432023/MS-007 Cement Blocks
Waterproofing
8 HEGC/G-432023/MS-008 Polycoat RBE-1000
(Rubberized Bitumen
Emulsion Paint)
9 HEGC/G-432023/MS-007 Geotextile Filter
Fabric
10 HEGC/G-432023/MS-008 Concrete Paving
Blocks
11 HEGC/G-432023/MS-009 Concrete Kerbstones
12 HEGC/G-432023/MS-010 Joint-filler for
Kerbstones
13 HEGC/G-432023/MS-011 Metal Works
(Gates/Grills)
14 HEGC/G-432023/MS-012 Ceramic Tiles
15 HEGC/G-432023/MS-013 Kitchen Cabinets
16 HEGC/G-432023/MS-014 Aluminium Doors &
Windows
17 HEGC/G-432023/MS-015 Two coats of Epoxy
Acrylic Paint
18 HEGC/G-432023/MS-016 Bonding Agent for
Concrete-to-concrete
19 HEGC/G-432023/MS-017 Bonding Agent for
Dowel Bars
20 HEGC/G-432023/MS-018 Steel Dowel Bars
⌀16mm
21 HEGC/G-432023/MS-019 Renderoc TG for Patch
Repair
22 HEGC/G-432023/MS-020 Renderoc LA for
Micro-Concrete Repair
23 HEGC/G-432023/MS-021 Epoxy Primer Slow-
Setting
24 HEGC/G-432023/MS-022 Poly-modified
Concrete
PPR-CT (PN20) Pipes
1 HEGC/G-432023/MS-001 & Fittings
Ø32mm to
Ø20mm
ABS Class 16 Pipes &
2 HEGC/G-432023/MS-002 Fittings
Ø40mm to
Ø32mm
uPVC Pipes & Fittings
3 HEGC/G-432023/MS-003
Ø (25, 32, 40, 80, 110
& 150 PN16)
4 HEGC/G-432023/MS-004 Water Heater (50
Liters)
5 HEGC/G-432023/MS-005 Polyethylene Storage
Tank (500 USG)
Water Pumps
6 HEGC/G-432023/MS-006 (Duty/Standby) 20 US
GPM@ 15m
7 HEGC/G-432023/MS-007 Sanitary Fixtures
Fire Extinguishers
8 HEGC/G-432023/MS-008 (6kg Dry Powder
& 2kg CO2)
600x600 DI Cover &
9 HEGC/G-432023/MS-009 Frame and GRP
Sealing Plate
LV Switchgears
1 HEGC/G-342023/MSEL-
001 (MDB, SMDB &
FDBs)
HEGC/G-342023/MSEL-
2 002 LV Cables
HEGC/G-342023/MSEL- Cable Trays and
3 003 Accessories
4 HEGC/G-342023/MSEL- PVC Conduits and
004 Accessories
5 HEGC/G-342023/MSEL- GI Conduits and
006 Accessories
6 HEGC/G-342023/MSEL-
005 Wiring Accessories
Material submittal for
7 HEGC/G-342023/MSEL-
001 Light Fixtures(Internal
& External)
8 HEGC/G-342023/MSEL- Emergency & Exit
002 Light System
HEGC/G-342023/MSEL-
9 003 Telephone System
HEGC/G-342023/MSEL-
12 004 Isolators
11 HEGC/G-342023/MSEL- GRP Energy Meter
006 Cabinet
12 HEGC/G-342023/MSEL-
005 Earthing System
neering and Scientific Studies Co.
ONSULTANT
The Boundary Walls of Graveyards in Al Ain Region.
Manufacturers/ Suppliers & Contact Info.
Fabricators
CICON Building Materials CICON Building Materials LLC. Abu Dhabi
LLC. Abu Dhabi
Readymix Abu Dhabi Ltd., Readymix Abu Dhabi Ltd., Al Ain
Al Ain
Hydropower Energy & Hydropower Energy &
General Construction LLC. General Construction LLC.
AL Buraimi Development & AL Buraimi Development & Investment Co
Investment Co., Oman
SAAD PRECAST LLC
SAAD Precast LLC., Umm Al P.O.Box :
Quain 4266, Umm Al Quwain,
UAE
Tel: +971 6 7666396
Nael Cement Products Nael Cement Products
Henkel Polybit Industries Henkel Polybit Industries
Ltd. Ltd. UAE
PO Box 91479, Blk A 129
Mussafah 41 ICAD 3.
M: +971 50 251 4510 T:
Exceed Geotextile LLC., Exceed
+971 02Geotextile
557 5806 LLC.
Abu Dhabi. P.o.Box: 111149 Abu
Dhabi.
Mob: +971547910313
PASCO Paving Stones Co., PASCO Paving Stones Co., Al Ain
Al Ain
PASCO Paving Stones Co., PASCO Paving Stones Co., Al Ain
Al Ain
Henkel Polybit Industries Henkel Polybit Industries
Ltd. Ltd. UAE
PO Box 91479, Blk A 129
Mussafah 41 ICAD 3.
M: +971 50 251 4510 T:
LAMA METAL & IRON LAMA METAL
+971 02 & IRON
557 5806
WORKS LLC., Ajman WORKS LLC,
AJMAN, U.A.E
AL Danube Building Al Danube Building
Material Materials
Al Ain, UAE
+971 50 4591127
Al Danube Building Al Danube
+971 Building
37223003
Material Materials
Al Ain, UAE
+971 50 4591127
+971 37223003
• National Paints Factories
Co. Ltd., Abu Dhabi
Tel: +971 2 4474324
• National Paints Factories Email:
Co. Ltd. npfcl@nationalpaints.com
• Jotun LLC. • Jotun Abu Dhabi LLC.,
1- Fosroc. Abu Dhabi
2- Con Mix 055 939 8940. Tel: +971 2 6910 700
3- Henkel OR Corrotech Email: csd@jotunadh.ae
4- Arabian Chemicals
1- Fosroc.
2- Con Mix 055 939 8940.
3- Henkel OR Corrotech
4- Arabian Chemicals
CICON Building Materials CICON Building Materials LLC. Abu Dhabi
LLC. Abu Dhabi
1- Fosroc.
2- Con Mix 055 939 8940.
3- Henkel OR Corrotech
4- Arabian Chemicals
1- Fosroc.
2- Con Mix 055 939 8940.
3- Henkel OR Corrotech
4- Arabian Chemicals
(Renderoc S2) by:
1- Fosroc.
2- Con Mix 055 939 8940.
3- Henkel OR Corrotech
4- Arabian Chemicals
1- Fosroc.
2- Con Mix 055 939 8940.
3- Henkel OR Corrotech
4- Arabian Chemicals
• Polyfab Plastic Industry
LLC., Abu Dhabi
Tel: +971 2 555 6630
Email: polyfabp@eim.ae
• BIN BROOK PLASTIC
INDUSTRIES, Al Ain
AL Danube Building Al Danube Building
Materials/fawaz Materials
Al Ain, UAE
+971 50 4591127
+971
Polycon Gulf Ltd. Polycon
37223003 Gulf Limited
Al Ain,
+971
UAE
+971 3 721 2690
+971
Prakash Trading Company Prakash Trading Company
3 721 7967
sales.alain.pgl@anieuae.co
P.O. BOX 94564,
Mussafah-40, Abu Dhabi,
UAE
AL Danube Building Al Danube Building
Material Materials
Al Ain, UAE
+971 50 4591127
+971
37223003
+971
Concorde Trading LLC Concorde Trading LLC
Abuhabi Industrial City,
ICAD 1, Abu Dhabi, UAE
Phone: +971 4 347 2900
Fax: +971 4 347 2796
Al Fazal Oasis Blacksmith Al Fazal Oasis Blacksmith
Welding Workshop , Al Ain Welding Workshop PO Box:
15757, Al Ain - UAE
kmalikk82@gmail.com
Al Fazal Oasis Blacksmith Al Fazal Oasis Blacksmith
Welding Workshop , Al Ain Welding Workshop , PO
Box: 15757, Al Ain -
UAE ,kmalikk82@gmail.co
m
AEC Illuminazione, Italy ARASCA , Post Box: 86637,
Dubai , Ph:. 04-2861362,
Fax:. 04-2861364
Abu Dhabi Cable Factory
TECON ENGINEERING, Abu
Dhabi
SPACEAGE SWITCHGEAR,
Abu Dhabi
Al Fazal Oasis Blacksmith Al Fazal Oasis Blacksmith
Welding Workshop , Al Ain Welding Workshop PO Box:
15757, Al Ain - UAE
kmalikk82@gmail.com
Al Fazal Oasis Blacksmith Al Fazal Oasis Blacksmith
Welding Workshop , Al Ain Welding Workshop , PO
Box: 15757, Al Ain -
UAE ,kmalikk82@gmail.co
m
AEC Illuminazione, Italy ARASCA , Post Box: 86637,
Dubai , Ph:. 04-2861362,
Fax:. 04-2861364
Abu Dhabi Cable Factory
TECON ENGINEERING, Abu
Dhabi
SPACEAGE SWITCHGEAR,
Abu Dhabi
A
l Ain Region.
Contractor's Schedule Contractor's
Date of start at site based Schedule Date of
on baseline program Submission
15-Nov-23
30-Nov-23
30-Dec-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
15-Nov-23
15-Nov-23
15-Nov-23
15-Nov-23
15-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
30-Nov-23
AL AIN CITY MUNCIPALITY - DEPARTMEN
MATERIAL
Contractor's Contractor's Reference No.
Submittal Date
CIVIL/MAINTENANC
13-Nov-23 HEGC-G432023/23-SG-006
19-Nov-23 HEGC-G432023/23-SG-022
10-Dec-23
13-Nov-23 HEGC-G432023/23-SG-007
13-Nov-23 HEGC-G432023/23-SG-008
13-Nov-23 HEGC-G432023/23-SG-011
13-Nov-23 HEGC-G432023/23-SG-010
13-Nov-23 HEGC-G432023/23-SG-09
MECHANIC
ELECTRICA
LITY - DEPARTMENT OF MUNCIPALITIES AND TRANSPORTATIO
CLIENT
MATERIAL SUBMITTAL LOG
Consultant's
Forwarding Date to AACM Action Date
AACM
VIL/MAINTENANCE & ARCHITECTURE WORKS
24-Nov-23
7-Dec-23
24-Nov-23
23-Nov-23
17-Nov-23
17-Nov-23 17-Nov-23
17-Nov-23 23-Nov-23
MECHANICAL INSTALLATIONS
ELECTRICAL INSTALLATIONS
TIES AND TRANSPORTATION
Consultant's Action Reference No. Status
E WORKS
TESSCO/HP/AAS/DA/2023/016 APPROVED
TESSCO/HP/AAS/DA/2023/021 APPROVED
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
TESSCO/HP/AAS/DA/2023/017 APPROVED
TESSCO/HP/AAS/DA/2023/009 APPROVED
TESSCO/HP/AAS/DA/2023/011 APPROVED
TESSCO/HP/AAS/DA/2023/010 APPROVED
TESSCO/HP/AAS/DA/2023/008 APPROVED
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
UNDER PROCESS
(HPE)
Hyd
Date:
Material
Material Submittal Submittal Warranty
Smart-hub Number (Attachment) Period
202304211771 ATTACHED
202304374659 ATTACHED
20234212162 ATTACHED
202304212308 ATTACHED
202304211559 ATTACHED
202304211502 ATTACHED
202304212390 ATTACHED
Hydropower Energy & General Construction SP L.
CONTRACTOR
e:
Warranty Date Started Delivery of
(Attachment) on Site
ral Construction SP L.L.C.
CTOR
Delivery of Material