ANNEXURE ‘B’
(SCOPE OF WORK & SPECIFICATIONS)
Specifications of the Works shall be as per the drawings, Technical specifications,
mentioned and as per the descriptions in the BOQ.
However, the following details to be referred as General Specifications of the Project.
Consultant / Client decision is considered as Final , in case of any deviations.
Item                                                               Remarks
                    Description
Excavation
                    Earth work excavation Upto required
                    depth and levels as per the design,
                    drawing and as per the site condition in all
                    kind of soils and earth mixed with fair
                    sized boulders, hard morum either
                    manually or by using machinery and in all
                    conditions such as dry, wet, slurry etc.,
                    disposal and depositing the excavated
                    soil in the premises or disposing it outside
                    as directed.(Note: The work is including of
                    site leveling clearing the bushes, dressing
                    after the excavation and ramming for
                    surface ready for laying of PCC.
                                                                   Anti Termite treatment to be
                    Earth filling up to floor levels as per the
PLINTH FILLING                                                     done before carrying out
                    drawing in inside the plinth of the building
                                                                   any filling activities.
                    with good morum soils. Compaction of the
                    earth with water and vibrating plate
                    compactor. Filling and compaction upto
                    proposed floor level depending upon the
                    levels of site and road (Consolidation &
                    Compaction shall be done as per IS
                    standards).
                    R.C.C. framed structure on footings over       MAKE:
FOUNDATION &
                    hard strata by using reinforced steel and
STRUCTURE                                                          STEEL                 :
                    cement of reputed make, including
                                                                   RADHA/JAYRAJ/DHANALAK
                    placing the electrical conduiting, as per      SHMI
                    Structural   Engineers      design.  This
                    includes PCC, Shuttering, Supply of steel,     CEMENT
                    Bar bending, Installation, supply and                :
                    laying of concrete including curing.           ULTRATECH/BIRLA/PENN
                                                                   A
                    Sand and Metal will be used of the best
                    quality. Design mix report to be submitted     ELECTRICAL CONDUITING
                    before first concrete casting for client             :
                    approval. Reports of strength of concrete      FINOLEX/SUDHAKAR
                    will also be submitted after 28 days of
                    casting for all slabs.                         Makes and brand of the
                                                                   materials shall be as per
                                                                   Consultant /Client approval
                                                                                             1
                                                           Make and technical
BRICKWORK    EXTERNAL :
                                                           specifications such as
             Brick Masonry with 200mm thick NCL            strength, sound absorption
             make AAC blocks.                              levels of the block should
                                                           be approved by
             INTERNAL :                                    Consultants / Client
             Brick Masonry with 115 mm thick Red
             clay bricks.(Note: including all kind of
             RCC like CC beds, hole fasteners, lintels
             and chajjas etc.,)
                                                           Approved and branded
PLASTERING   INTERNAL:
                                                           make of Water proofing
             Double coat cement plaster            with    compound to be added
             ARKRETE ready mix plaster.                    while executing external
                                                           plastering works.
             EXTERNAL :
             Double coat sand faced cement
             plastering / as per Architect’s choice with
             Recron 3S polyester fiber, waterproofing
             compound.
             (Note: GI wire mesh to be used at
             junction of concrete and brick/block
             masonry/over conduit chased surfaces
             and other required area)
PAINTING
             INTERIOR WALLS:
              Painting with applying one coat of Primer
             ( Asian Trucare(I) ), two coats of
             Emulsion paint ( Asian Premium ) on 2
             coats of wall putty ( JK or Birla)
             EXTERIOR WALLS :
             Painting with applying one coat of Primer
             (Asian Trucare(E) ) , 2 coats of putty
             wherever required and two coats of Damp
             proof Apex paint ( Asian Apex ) as per
             colour pattern given by the architect.
                                                           Material shall be as per
FLOORING :   ROOMS :         Flooring with 600 x 600 x
                                                           Client’s and consultants
             12mm thick vitrified tiles over bed of
                                                           choice.
             CM(1:4),50mm thick base coat and neat
             gray cement slurry of honey like spread at
             the rate of 3.3kg/sqm ( MAKE :SOMANY )
             (BASE PRICE : 40/-)
             CORRIDORS: laying of polished Granite
             of 20mm thick over a bed of cement
             mortar (1:4) 30-40mm thick and neat gray
             cement slurry of honey line spread at the
             rate of 3.3kg/sqm                             Spacing shall be as per the
                                                           Architectural intent and
             STAIRCASE AND LOBBIES :                       Epoxy grouting to be done
             Black Granite or equivalent for threads,      in all the wet areas.
                                                                                      2
                lobbies and skirtings and Sadharali
                Granite for risers. (BASE PRICE : 100/- )
                BATHROOMS :
                Flooring with 300mm x 300mm anti-skid
                tiles and Wall Cladding with 300mm X
                600mm ceramic tiles over bed of CM(1:3)
                base coat and neat gray cement paste
                spread at the rate of 3.3kg/sqm. ( MAKE :
                SOMANY ) (BASE PRICE : 60/-)
DOORS       &   MAIN DOORS AND INTERNAL DOORS                  Colour and pattern as per
WINDOWS         : Medium Teak Wood Frame with flush            client/ consultants choice.
                shutter ( both side laminate ) doors of
                sizes given by the architect in the
                schedule.
                TOILET DOORS :
                Medium Teak Wood Frame with flush              ( Edges to be properly
                shutter with laminate on the outside and       treated to avoid gaps and
                aluminium sheet on the inside as per door      entry of water)
                schedule
                                                               Mosquito mesh and safety
                WINDOWS: UPVC windows as per sizes,
                                                               grills to be included in the
                specifications given by the architect.
                                                               Windows.
                Fixed and air gaps filled with silicon
                material. MAKE : NCL, ELEGANT
WATERPROOFING   Waterproofing      Treatment     of   Roof     Should     be    as   per
                Terrace.                                       Consultant’s approval and
                                                               strictly      as      per
                1. Scrapping and cleaning the Roof
                                                               Manufacturer’s
                Terrace surface thoroughly from dust, dirt
                                                               recommendations)
                cement slurry etc. by means of wire
                brush, chisels, scrappers, water etc.
                2. Painting with acrylic polymer based         Methodology should be
                water impervious slurry coating Hind           approved by Consultants /
                Crete Plus WPM in two (2) coats.               Client., if not alternative
                                                               method to be followed
                Provision of protective overlay of average
                                                               without any additional cost.
                40 mm thick Screed concrete of
                proportion (1 cement: 2 sand: 4 stone
                chips) over the entire chemically treated
                surface maintaining a slope 1 in 100 (or)
                directed my consultant towards the rain
                water outlet.
                Waterproofing Treatment of Toilet
                1. Cleaning the R.C.C floor slab by wire
                brush, chisel to make it free from all loose
                material, depositions etc.                     Methodology     should     be
                                                                                          3
             2. Application of 1:4 cement sand plaster    approved by Consultants /
             over the brick wall below the floor level    Client., if not alternative
             and above the sunken slab level. The         method to be followed
             brick wall will be provided with plain       without any additional cost.
             pointing with cement mortar before
             plastering. The floor wall junction to be
             rounded off with cement mortar.              10 years Warranty for all
                                                          water proofing works to be
             3. Applying two coats of Hind Crete Plus
                                                          provided.
             WPM admixed with cement in the ratio
             1:2 ( 1 part Hind Crete Plus WPM : 2
             parts cement) over the R.C.C sunken slab
             and wall up to a height of 200 mm above
             the desired finished floor level.
             4. Ponding and testing the waterproofing
             treatment after 48 hours curing by
             sprinkling water.
             Fitting of PVC pipes, conductors, cables,    MAKE :
ELECTRICAL
             junction boxes, Panel boards,MCB
                                                          PVC Pipes                    :
             M.S Boxes, wiring, switchboards, exhaust
                                                          SUDHAKAR/ FINOLEX
             fans, fans and lights as per architect
             design. External lighting such as gate       Conductors     : HAVELLS/
             lamps and focus lights, signage lights and   FINOLEX
             external landscaping lights all around the
                                                          Junction Boxes      :
             building will be provided.
                                                          ANCHOR/ MILLON/ GOLD
             Earth pits and proper earthing provisions    MEDAL
             to be made by Contractor for machines /
                                                          MCB              : HOGER/
             building wherever required.
                                                          SIEMENS
             (Note: Transformer to Panel Board power
                                                          Wiring    :  HAVELLS/
             supply will be in our scope, distribution
                                                          FINOLEX/ POLYCAB
             from Panel to Internal and External is in
             the contractor scope)                        Switchboards       :
                                                          HAVELLS/ GOLD MEDAL/
                                                          ANCHOR
                                                          Fans                         :
                                                          CROMPTON/ BAJAJ
                                                          Tube Lights     : PHILIPS/
                                                          BAJAJ
PLUMBING
             All fittings, plumbing lines and sewage
             pipelines as per Architect’s design shall
             be as follows :
             PVC PIPES AND FITTINGS                   :
             SUPREME/ ASHIRWAD
             WASH BASINS                              :
             HINDWARE/ JOHNSON
             EWC WITH FLUSH TANK                      :
                                                                                    4
                  HINDWARE/ JOHNSON
                  URINALS                                  :
                  HINDWARE/ JOHNSON
                  PILLAR/BIB/STOP COCKS                    :
                  PLUMBER/ JAGUAR
NOTE
                  All low side Electrical and complete
                         plumbing works including all type
                         of chambers, collecting pits and
                         rain   water     recharge     pits
                         construction are in the scope of
                         the Contractor.
                  Highside works such as Transformer,
                         connection charges are in Client
                         scope.
                  All Pipes to be concealed and fixed
                         properly, wherever specified and
                         required by Client / Consultant/
                         Architects
                  The rain water from the terrace & open
RAIN WATER
                  areas will be collected through rain water
DISPOSAL
                  pipes, which will be discharged into the
                  rain water harvesting pits to recharge the
                  underground water.
WATER SUMP
                  to be constructed beneath the ground as
AND SEPTIC TANK
                  per the drawings and location given by
                  the architect.
DRAINAGE
                  SWR Pipes from the septic tank to the
                  drain shall be installed, taking levels of
                  drain into consideration, at sites where
                  drain is available.
MS WORKS              1. SS RAILING ( Grade 304) : Basic
                         design with 3 feet height, will be
                         installed all along the staircase .
                      2. GRILLS FOR WINDOWS : Grills
                         as per architects design made of
                         MS bars, painted and fitted.
                      3. MS GATE : 12 Feet wide gate as
                          per architects design with BJP
                          logo embossed on it.
                  ELEVATION : All MS works in elevation
                  as per architect’s elevation details
COMPOUND WALL                                                  Design Intent and
                  Construction of compound wall ( 4 ½ feet
                                                               aesthetics of the wall shall
                  height brick wall with 2 ½ feet height RR
                                                                                              5
                                                                 be as per Architect’s
                 masonary ) all around the building ( wall
                                                                 design.
                 will be built 5 feet from the building on all
                 sides ). TOTAL LENGTH = 400 RFT
CLIENT’s SCOPE                                                   Note: If any client scope of
                     ●   Change of Land use
                                                                 works executed by
                     ●   Municipal Permissions                   Contractor the charges will
                                                                 be paid as per actual by
                     ●   Temporary electrical connection         client on submission of
                     ●    Meters, Transformers                   proper documents or proof.
                     ●   Bore well
                     ●   Consultants fee