ITP Commissioning

This document outlines a preliminary commissioning works plan for a water supply system with the following key points: 1. The plan includes activities to flush, disinfect, and test the water supply system over 5 steps before commissioning. 2. Each activity will be checked at 100% through inspection to verify clean water discharge, correct chemical dosages and hold times, and compliance with referenced standards and documents. 3. Records will be maintained in a register and water samples may be collected and tested to bacteriological standards as an optional step. Oversight and approval roles are defined for the client and consultants.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views1 page

ITP Commissioning

This document outlines a preliminary commissioning works plan for a water supply system with the following key points: 1. The plan includes activities to flush, disinfect, and test the water supply system over 5 steps before commissioning. 2. Each activity will be checked at 100% through inspection to verify clean water discharge, correct chemical dosages and hold times, and compliance with referenced standards and documents. 3. Records will be maintained in a register and water samples may be collected and tested to bacteriological standards as an optional step. Oversight and approval roles are defined for the client and consultants.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Client TWAD

S I;\ISPECTIO.' &: TESTI"G


C\\'SS

PL\J'\
TO .\IELlIR

- PRELI\II\ARY CO,V1\1ISSIO';ING WORI"S


Doc No
Date

ITP No
LTCDIW&REIWSBG/PQP/ITP/F01
13/11/2014

L&T/MELUR/ITP - 01
Rev-O

LARSEN & TOUBRO LIMITED

Sl. RESPONSIBILITY
METHODOF QUATUM OF Acceptance FORM OF
ACTIVITY/PROCESS CHARACTERISTICSTO B.ECHECKED REF.DOC/CODE. Responsibility CLIENT/CONS
NO CHECK CHECK Criteria RECORD Vendor L&T
ULTANT
Commisioning
Check for clean discharge of water on all outlet points Method Statement / As stated in
1 Preliminary Flushing Inspection 100% E iss / QA/QC Register -- ( R
be+ore commisioring BOQ MS/ BOQ
Engg.
. Commisioning
Check dosage of liquill'l:hlorine or sodium or calcium Method Statement / As stated In
2 Flushing
hypochlorite.
Inspection 100% Engg./ QA/QC Register -- ( R
BOQ MS/ BOQ
Engg.
Commisioning
I Disinfection of Pipe Inspection 100%
Method Statement / As stated In
Engg. / QA/QC Register -- C R
BOQ MS/ BOQ
Enaa
Commisioning
Check for hold period of chlorinated or sodium or Method Statement / As stated in
Inspection 100% Engg./ QA/QC Register -- C R
calcium hypochlorited water. (24Hrs.) BOQ MS/ BOQ
Engg.
Commisioning
Method Statement / As stated In
Check for clean discharge of water after chlorination. Inspection 100% Engg. i QA/QC Register -- C R
BOQ MS/ BOQ
Engg
As pe' IS Cornrmsrorung

4:
Collect water samples from crschrge POints for Method Statement /
i"""'- ....•
Inspection 100% 5822.1994 Engg. / QA/Q( Reports __________
,C
bacteriological tests (Optional) BOQ \ON<n~~
Clause: 13 4

te:
Engg.

LEGEND: (-CHECK; W-WITNESS; R-REVIEW; MS-METHOD STATEMENT; BOQ-BILL OF QUANTITY L::'l.


\Q'~\
Approved by Al~rf~ Prepared by
~I_~

PRA~
-,;:; ?!-~/Q~):
-C.lll',
-t> ·,L&- ,;.
5
.r)
{j '-'--.:;/
-
U
* ie

'I