The document outlines the responsibilities for water and oil pipelines between MOE, Jorsun, and IFC including flow rates and pressures. MOE is responsible for water pipelines from an evaporation pond at 99 m3/h and 0.2 bar to an underground concrete water tank. Jorsun is responsible for oil pipelines from an underground concrete oil tank at 1 m3/h and 0.1 bar to the river. IFC is responsible for other water and oil pipelines with various diameters and flow rates.

Uploaded by

ali mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
819 views1 page

DAF-P&ID Mi For de

The document outlines the responsibilities for water and oil pipelines between MOE, Jorsun, and IFC including flow rates and pressures. MOE is responsible for water pipelines from an evaporation pond at 99 m3/h and 0.2 bar to an underground concrete water tank. Jorsun is responsible for oil pipelines from an underground concrete oil tank at 1 m3/h and 0.1 bar to the river. IFC is responsible for other water and oil pipelines with various diameters and flow rates.

Uploaded by

ali mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

0.

2 m3/min , 5-8 bar

40 m3/h , 4.5 bar


0-250 L/h , 3 bar

3-6"-AA1 2-4"-AA1

two Electrical pump 100


100m3/h , 2bar m3/h , H=20m 1-6"-AA1 oily water from
one working and Evaporation pond
second spare

99 m3/h , 0.2 bar 4-6"-AA1

3-4"-AA1
Electrical pump 100
m3/h , H=40m

1 m3/h , 0.1 bar


To the river

MOE Responsibility
Jorsun Responsibility
underground underground
concrete water tank concrete oil tank
5x5x1.5 3x3x1.5

IFC Responsibility