Nippur Constructions Solutions: Inspection Test Plan

This document provides an inspection test plan for a 75,000 diesel fuel tank project for client AL-Adat. It outlines 10 key steps for quality control including reviewing drawings, developing an inspection plan, verifying welding procedures, inspecting materials, monitoring fabrication, conducting tests, installing accessories, applying markings, performing final inspection, and documenting the quality control process. Key verification and intervention roles are identified for the client, Nippur Construction Solutions quality control team, and a third party inspector.

Uploaded by

amin mousa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views2 pages

Nippur Constructions Solutions: Inspection Test Plan

This document provides an inspection test plan for a 75,000 diesel fuel tank project for client AL-Adat. It outlines 10 key steps for quality control including reviewing drawings, developing an inspection plan, verifying welding procedures, inspecting materials, monitoring fabrication, conducting tests, installing accessories, applying markings, performing final inspection, and documenting the quality control process. Key verification and intervention roles are identified for the client, Nippur Construction Solutions quality control team, and a third party inspector.

Uploaded by

amin mousa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Nippur Constructions Solutions

Ainkawa, Gazna Road Phone : +964 750 434 6554


Erbil, KRG Email : info@nippurcs.com
Iraq Web : www.nippurcs.com

Inspection Test Plan

Client AL-Adat
Project 75000 Diesel fuel tank
Drawing NP0120BX055
CODE UL-142
Steel Code ST-37

No. QC Plan Description Reference Verification record Intervention Points


NCS Client TPI
1 Drawings UL-142 Contract Review Documents R
2 Inspection & test plan UL-142 &drawings Approvals H A
3 WPS,PQR,WQT ASME Sec IX Ed 2019 Approvals H A
4 Material
4.1 Visual inspection, dimensions ,material UL-142 Contract Review Documents H A
5 Fabrication
5.1 Cutting and preparation Drawings QC plan M M
5.2 Rolling , fit up , nozzles, manway Drawings QC plan M M
5.3 Contaminated tank fit up Drawings QC plan M M
5.4 welding WPS TPI H R
6 Tests
6.1 Welding test MPI Drawings &UL-142 TPI H W
6.2 Hydro test Drawings &UL-142 TPI H W
6.3 Lifting eye test Drawings &UL-142 TPI H W
7 Accessories fitting Drawings QC plan W R
8 Marking and Name plate Drawings TPI W R
9 Final inspection WS/QC QC plan R/W H R
Check All QC Documentation Is In
Order, Prepare Completed
Contract QC Pack. Submit To
10 Documentation QC Client For Acceptance H/R R/A R
Key
A Approval
H Hold. Process / activity should cease until instructed by QC department.
M Monitor. Review processes / activities periodically to ensure progress.
MPI Magnetic particle inspection
NCS Nippur Construction Solution.
PQR Procedure qualification record
QC Quality control
R Review. Compare data record with Third Party specified acceptance criteria.
TPI Third Party Inspection
W Witness. Process / activity to be witnessed, documented and maintained.
W.S Workshop Supervisor
WPS welding procedure specification
WQT Welder Qualification Test

Note : 1- Test reports signed and stamped by TPI , 2- WPS,PQR,WQT reports stamped and signed by QC manager