7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
ICAPS SOFTWARE 
                              
                                   ENGINEERING MANUAL 
                          Integrated
                          Commissioning
                          And
                          Progress
                          System
                                                       ICAPS
                                    ENGINEERING MANUAL
            Index    Description                                               Date            Issued by
             1       ICAPS R3                                                  10/2005         Capgemini
             2       ICAPS R3.10.02                                            11/2007         Capgemini
            TOTAL                                  ICAPS Engineering Manual                       Page 1 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                             1/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
             
                                           TABLE OF CONTENTS
            1. Introduction________________________________________________________3
                  1.1. Aims of the Engineering Manual _________________________________3
                  1.2. OPERCOM Methodology ______________________________________3
                  1.3. ICAPS______________________________________________________4
            2. Engineering Import-Export Module _____________________________________5
                 2.1. Main Principles of the Module___________________________________5
                       2.1.1 Introduction____________________________________________5
                       2.1.2 Data format ____________________________________________5
                       2.1.3 Database code __________________________________________5
                       2.1.4 Automatic numbering ____________________________________5
                       2.1.5 Revision Types _________________________________________6
                       2.1.6 Log report _____________________________________________6
                       2.1.7 Users groups ___________________________________________6
                       2.1.8 Import / Export SYSTAL _________________________________7
                       2.1.9 Punch List Import _______________________________________7
                 2.2. Man Machine Interface (MMI) __________________________________8
                 2.3. Importing Engineering Data _____________________________________9
                       2.3.1 Introduction____________________________________________9
                       2.3.2 Import of Items _________________________________________9
            3. Engineering Import Format Examples __________________________________11
            4. Revision Types ____________________________________________________12
            5. Glossary _________________________________________________________13
            6. Appendix_________________________________________________________14
                 6.1. Appendix 1: The Typical Phases of a Project ______________________14
                 6.2. Appendix 2: OPERCOM Methodology ___________________________14
                 6.3. Appendix 3 – Project breakdown ________________________________17
                 6.4. Appendix 5 - Import Log Report ________________________________19
                 6.5. Functional Specifications of Import / Export Module ________________19
            TOTAL                                  ICAPS Engineering Manual                    Page 2 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      2/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            1. INTRODUCTION
            1.1. Aims of the Engineering Manual
                     ICAPS is the Integrated Commissioning And Progress System application to be
                     used with the TOTAL’s OPERCOM methodology.
                     This ENGINEERING MANUAL intends to explain the importing rules of
                     Engineering data in the ICAPS software.
                     - Definition of the main principles of the IMPORT / EXPORT module.
                     - Definition of the engineering data file format and mandatory data.
                      This manual is only an introduction of the mechanism of Import into ICAPS.
                      For a complete description of the Import/Export rules associated with each type
                      of import, please refer to the “Engineering Manual – Annexe1” Manual.
            1.2. OPERCOM Methodology
                     The typical phases of a Project are shown in APPENDIX 1 with the main
                     completion activities highlighted.
                     The five major precommissioning and commissioning activities detailed in
                     APPENDIX 2 are:
                     - General OPERCOM preparation,
                     - Precommissioning preparation,
                     - Commissioning preparation,
                     -  Precommissioning execution,
                     -  Commissioning execution.
                     The OPERCOM methodology has been developed to handle the preparation and
                     the execution works of both the precommissioning and the commissioning. Its
                     main objective is to allow a smooth transfer of the installation from the
                     Construction to the Operator, as quickly as possible, in full confidence, and with
                     all the required safety.
                     The OPERCOM methodology consists of the following documents :
                     - GSEXP-101 : Precommissioning and commissioning guidelines.
                     - GSEXP-103 : Precommissioning and commissioning preparation.
                     - GSEXP-105 : Precommissioning execution.
                     - GSEXP-107 : Commissioning execution.
                     OPERCOM methodology is used with the commissioning software ICAPS.
                     The main goal of this Manual is to help the contractor to perform the completion
                     work preparation, which must be started early in the Project, during the
                     engineering phase.
                     The major preparation work concerns the engineering equipment lists which
                     should be provided using the OPERCOM system approach presented in MD-
                     COM01 and SP-COM512. In addition to that, those lists must be built in order to
                     suit the formats required by ICAPS.
            TOTAL                                  ICAPS Engineering Manual                    Page 3 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      3/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
             
            1.3. ICAPS
                     ICAPS provides to the precommissioning and commissioning teams the means
                     to :
                     - Import the engineering equipment lists into the OPERCOM database,
                     - Prepare the precommissioning and commissioning databases,
                     - Prepare the precommissioning and commissioning dossiers, including all the
                       OPERCOM datasheets,
                     - Define the precommissioning and commissioning execution staff
                       requirement,
                     - Follow-up the precommissioning and commissioning execution,
                     - Report progress and status.
                     The APPENDIX 3 gives the architecture of the software. It shows the main
                     hierarchies and links involved in the model, which are:
                     - The physical hierarchy for the equipment breakdown,
                     - The task hierarchy for the associated completion tasks.
                     The transfer of engineering data is done using the IMPORT / EXPORT module.
            TOTAL                                  ICAPS Engineering Manual                    Page 4 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      4/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            2. ENGINEERING IMPORT-EXPORT MODULE
            2.1. Main Principles of the Module
            2.1.1 Introduction
                     The IMPORT / EXPORT module is an easy tool to allow to :
                             - Import all the engineering data required by ICAPS to create the
                                OPERCOM database.
                             - Import / export parts or complete OPERCOM database (Status Index,
                                Technical DataBase,…) during the completion activities (revised
                                lists,…).
                     In order to allow import, it is necessary to fix the engineering list formats, which
                     is the main target of this document.
            2.1.2 Data format
                    -  The typical type of import / export files is Microsoft Excel (.xls).
                    -  The date format is local date (see regional parameters).
                    -  The number format is standard.
                    -  No difference is done with small and capital letters. Codes and Tag numbers
                        are all stored in capital letters.
                    -  Field name lengths are defined in this document. When imported names are
                        longer, they are truncated.
                    -  ICAPS element Types  are mandatory. “N/A”  should be used when Types 
                        are not available.
                    -  Tag number must be unique for the whole project. (see in the following
                        chapter)
                    -  ICAPS considers equipment elements as objects (Items, BF’s,…) ; some of
                        these objects have detailed data tables.
                             When importing those detailed data, the data tables should be presented
                             in a specific order with column names identified as Data1, Data2,….
                             The meaning of the column identifiers is not shown in the import file
                             and the user should refer to Type definition for it.
                             The content of the detailed data field is limited to 50 characters.
                    -  Each object can be identified by the following identifiers :
                    -  Code (Any alpha-numerical value, i.e. A for priority, abbreviation,…),
                    -  Number (Any alpha-numerical value, i.e. B2350, 2150, …),
                    -  Name (Pressure Gauge,…),
                    -  Description (Air Inlet Pressure Gauge,…).
            2.1.3 Database code
                     Each database of the project is identified by a letter. This letter is used for merged
                     database.
            2.1.4  Automatic numbering
                     The database letter is used in the automatic creation of the task number, OT/PVP
                     number and punch list number.
            TOTAL                                  ICAPS Engineering Manual                     Page 5 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                       5/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
                     Object number format:
                     Object                        Format
                     Task                          <B>1xxxxxxx
                      OT/PVP                     <B>2xxxxxxx
                      Punch list                 <B>3xxxxxxx
                     <B> is the database letter.
                     xxxxxxx are a single number.
            2.1.5 Revision Types
                     The engineering lists are generally revised several times during the Project.
                     In order to update the OPERCOM database when a new revision is issued, all the
                     imported engineering data should be provided with a Revision Number  and a
                     Revision Type.
                     The Revision Number is the last one for the current data.
                     The Revision Type  is a Capital letter to characterise the import Action (See
                     Table 6)
                     Note : The ICAPS User can specify an engineering revision range to limit the
                            import to that selection of data.
            2.1.6 Log report
                     Following engineering data file import, a log file is created which provides a
                     registered history of the errors during import (…\importXXX_Date_Time.xls
                     XXX = IT, BF …).
                     An example of the ICAPS Import Log Report is shown in APPENDIX 5.
                     This file provides the following information:
                     -  An Item Import Global Status Report; "General" Sheet with:
                     -  Date and time at the end of import,
                     -  Number of records (excluded after rev no comparison, excluded after error,
                        deleted, created, modified, updated, excluded due to unknown action…..)
                     -  Excluded due to unknown action.
                     -  List of rejected sheets.
                     -  A Successful Imported item list; "Item Good" Sheet with inserted records
                        into ICAPS,
                     -  A List of errors (data not following ICAPS import rules). Errors are presented
                        in 2 sheets. The imported data concerned by the error is stored in the first
                        sheet; "Item Bad" Sheet, the error code is stored in the second sheet; "Item
                        Errors" Sheet. This is to allow later import of the data after correction,
            2.1.7 Users groups
                     ICAPS R2 includes a new concept: users groups.
                     A users groups allows to split tasks in a project depending on who is responsible
                     for the task  realization.
                     Every ICAPS user belongs to one and only one users groups.
            TOTAL                                  ICAPS Engineering Manual                    Page 6 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      6/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
             
                     When a task is created from the MMI or from Initialization, it is automatically
                     allocated to the users groups of the connected user. A users groups is
                     characterised by a code and a name.
                     From
                     When import:
                            tasks are created in the local database, the users groups must be empty. The
                     task number is automaticaly created and the user group is the users group of the
                     connected user.
                     When tasks are created in a remote database and then imported in the local
                     database, the users groups must be given in the import files.
                     There is no export/import facilities for the users groups. However, during a task
                     import in order to merge two database, if the users group of a task does not exist
                     while it is in the import file, it is automatically created by the system before the
                     task creation.
                     A user can  create/modify/delete tasks and associated punch lists of his group.
                     Security:
                     A user can modify/delete tasks and associated punch lists of another group only if
                     his access level is 4.
                     A user with a level 4 access can create tasks of another group if he imports tasks
                     from another database.
            2.1.8 Import / Export SYSTAL
                     ICAPS  R3.10
                     A user with   includes
                                 a level     a newcan
                                         4 access  concept
                                                      import: import
                                                              SYSTAL andonly
                                                                         export
                                                                             for SYSTAL.
                                                                                 a modification revision
                     code.
                     No Creation and Deletion allowed for SYSTAL.
            2.1.9 Punch List Import
                     ICAPS R3.10 includes a new concept : management Punch List Actors with
                     ICAPS login.
                     A  user4.who is not a ‘Punch List User’ can’t import PunchLists even if user with
                     level
            TOTAL                                  ICAPS Engineering Manual                    Page 7 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      7/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            2.2. Man Machine Interface (MMI)
                      The import user interface is shown on the following screen view (FIGURE 1) :
                                                    Figure 1- Import MMI
                      Among the several possible importing facilities, this document presents only the
                      import of Items which concern the Engineering preparation.
                      They are required to build the OPERCOM database (Main Equipment,
                      Instruments, Cables, piping, ...).
                            - 
                     The Item Number list contain data for all the other equipment.
            TOTAL                                  ICAPS Engineering Manual                    Page 8 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                      8/19
7/26/2019                                                    230335125 ICAPS Engineering Manual R3 10
            2.3. Importing Engineering Data
            2.3.1 Introduction
                                 The two engineering data importing formats are presented in the following
                                 paragraphs.
                                 It is strongly recommended to comply with those 2 formats from the
                                 beginning of the engineering data list preparation in order to avoid a later
                                 conversion to the data formats required by ICAPS.
                                 In any case, the Engineering team is in charge of the data file conversion
                                 to the ICAPS file formats.
                                 Some of the imported data are mandatory in the engineering equipment
                                 lists as they are necessary to use ICAPS. All the other data are optional,
                                 however, it is recommended to supply them as they are used during the
                                 execution and it is appropriate to gather them at this time, when they are
                                 available.
            2.3.2 Import of Items
                                 All the engineering equipment elements are imported into ICAPS using
                                 the format shown in the Table1. 
                                 This EXCEL file "items.xls"  must contain only one worksheet named:
                                 Item.
                                 The mandatory data in this Item import file are as follows :
                                 -  Revision Number,
                                 -  Revision Type,
                                 -  Item Number (and Old Item Number when modified),
                                 -  Item Type Code,
                  Table 1        ICAPS Import File Format for Items
                     Field Name          Mandatory                                  Valid entries                                     Data Type Length
            Revision Number                   Yes    Any value                                                                          Standard   3
            Revision Type                     Yes    See § 4.2 - Table 6 (C,D,M)                                                       Character   1
            Item Number                       Yes    Any value                                                                         Character   30
            Old Item Number               Yes (A)    Any existing ITEM Number from Dictionary                                          Character   30
            Item Name                         No     Any value                                                                         Character   50
            Item Type Code                    Yes    See § 4.3 - Table 7                                                               Character   10
            Associated SubSystem              Yes    Any existing SYS Number from Dictionary                                           Character   30
            Number
            Associated Module Code            no     Any existing MODULE code from Dictionary                                          Character   30
            Manufacturer Model                No     Any value                                                                         Character   30
            Manufacturer Name                 No     Any value                                                                         Character   30
            Manufacturer Type                 No     Any value                                                                         Character   30
            PO Number                         No     Any value                                                                         Character   30
            Item Serial Number                No     Any value                                                                         Character   30
            Comments                          NO     Any value                                                                         Character   50
            Data1                         No (B)     Detail DATA(1) Content - any value = Control Type if Instrument items             Character   50
            Data2                             No     Detail DATA(2) Content - any value                                                Character   50
            ...
            Data15                            No     Detail. DATA(15) Content - any value                                              Character   50
            TOTAL                                           ICAPS Engineering Manual                                         Page 9 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                                                                 9/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
             
                     (A) Only when Item Number has been modified (Revision Type = M)
                     (B) In the case of instrument items, the Control_Type  should be entered in
                         Data1. (Refer to § 4.1-Table 5 for the list of Control_Types).
                     An example of engineering data import file is provided in § 3 -Table 3 
            TOTAL                                  ICAPS Engineering Manual                    Page 10 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                       10/19
7/26/2019                                             230335125 ICAPS Engineering Manual R3 10
      3. ENGINEERING IMPORT FORMAT EXAMPLES
                  Table 2       Example of ITEM Import File
      Revision Revision Item Number       Item Name        Item        Associated   Associated Manufacturer   Manufacturer   Manufacturer   PO
      Number Type                                          Type        SubSystem    Module     Model          Name           Type           Nu
                                                           Code        Number       Code
             1c         01-30-CJF-04-2S   Comm. Cable From ICAB        9677         TBD        C-Z-09-1                                     C-Z
                                          CCR to PLC I/O
                                          Cabinet (FW)
             1c         01-30-HSL-254A    CRUSHER EMERG. INST          9615         FW
                                          STOP
             1c         01-30-HSL-254B    CRUSHER EMERG. INST          9615         FW
                                          STOP
             1c         01-30-JBF-04      Junction Box     ZCLA        9615         TBD       Foster
                                                                                              Wheleer
             1c         01-30-WY-01F      Control Cable        CABL 9615            TBD       Foster
                                                                                              Wheleer
             1c         01-30-WY-03F      Control Cable        CABL 9615            TBD       Foster
                                                                                              Wheleer
             1c         01-30-WY-06F      Control Cable        CABL 9615            TBD       Foster
                                                                                              Wheleer
             1c         01-30-WY-07E      Control Cable        CABL 9615            TBD       Foster
                                                                                              Wheleer
             1c         01-30-ZSH-                             INST    9615         FW
                        250A/B
             1c         01-30HS-241A      CR-101 - Pull Cord   INST    9615         FW
                                          Switch
      TOTAL                                       ICAPS Engineering Manual                              Page 11 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                                              11/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            4. REVISION TYPES
                           C        CREATION OF A NEW ELEMENT
                           D        DELETION OF AN EXISTING ELEMENT
                           M        MODIFICATION OF AN EXISTING ELEMENT
                           U        UPDATE OF AN EXISTING ELEMENT
                               Table 6      Revision Types
            Which difference between Modification and Update?
            You have to choice the ‘M’ code if you want to change the name of an element or the
            links between it and its fathers (for example, change an item from Basic Function).
            You only have to use the ‘U’ code if you plan to modify data information about the
            element, not data structure.
            TOTAL                                  ICAPS Engineering Manual                    Page 12 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                       12/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            5. GLOSSARY
                                                     It is the group of STATIC  and DE-
                                                     ENERGIZED  verifications to be carried out in
                  PRECOMMISSIONING                   order to ensure that the installation adheres to
                                                     the Project Engineering Documents.
                                                     It is the group of DYNAMIC and ENERGIZED
                     COMMISSIONING                   tests to be carried out in order to ensure that the
                                                     installation is ready for start-up.
                                                     It is a subdivision of an installation that
                     SYSTEM
                                                     performs a proper operational function.
                                                     It is the minimum portion of the Plant required
                                                     for Commissioning purpose, and at the same
                     SUBSYSTEM
                                                     time, will
                                                     Operations.        be    the   handover   package     to
                                                     It is the smallest group of items for a single
                  BASIC FUNCTION
                                                     Commissioning task.
                                                     It is the smallest portion of an installation for a
                  ITEM
                                                     Precommissioning Task.
                                                     It is any of the Pre Commissioning or
                     TASK ACTIVITY
                                                     Commissioning execution type of work,
                                                    It is each individual precommissioning or
                     TASK                          commissioning job applies on an item, , a test
                                                   pack, a Basic Function or a subsystem.
                                                Table 8   OPERCOM Glossary
            TOTAL                                  ICAPS Engineering Manual                        Page 13 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                           13/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            6. APPENDIX
            6.1. Appendix 1: The Typical Phases of a Project
            6.2. Appendix 2: OPERCOM Methodology
            TOTAL                                  ICAPS Engineering Manual                    Page 14 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                       14/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
      TOTAL                                     ICAPS Engineering Manual                       Page 15 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                       15/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
       
                                                        APPENDIX 2 – OPERCOM METHODOLOG
                                                                   THE COMPLETION ACTIVITIES 
                          COMPLETION ACTIVITY                                                                          COMPL
                                   PREPARATION                                                                             E
                                       (GSEXP-103)                                                                      (GSEX
      I GENERAL OPERCOM PREPARATION                                                                  IV – PRECOMMISSION
                                                                                                               (GSEXP-105)
      1)    Subsystem Preparation
      2)    Start-Up Sequence Preparation                                                            1)  Conformity Checks
      3)    Coloured Marked-Up Drawing Preparation                                                   2)  Static Tests
      4)    Subsystem Engineering List Preparation                                                   3)  Piping Tests
      II – PRECOMMISSIONING PREPARATION                                                              IV – COMMISSIONING
                                                                                                               (GSEXP-107)
      1)    Status Index Preparation
      2)    Precomm. Dossier Preparation                                                             1)    Preliminary Checks
      3)    Precomm. Manpower Estimate Preparation                                                   2)    Functionnal Tests
      4)    Long Precomm. Task Preparation                                                           3)    Operating tests
                                                                                                     4)    Pipinp & Vessels Prep
      III COMMISSIONING PREPARATION
      1)    Technical Database Preparation
      2)    Comm. Dossier Preparation
      3)    Comm. Manpower Estimate Preparation
      4)    Long Comm. Task Preparation
      TOTAL                                     ICAPS Engineering Manual                       Page 16 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                                 16/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            6.3. Appendix 3 – Project breakdown
            ICAPS database includes all technical and organizational data for P/Com and Com
            activity preparation and follow-up during execution. All data inside one ICAPS
            database must be related to a unique project.
            ICAPS database is organized in 4 main branches as follow:
                            –  Equipment Branch : Defines all project equipment using a
                                hierarchical arrangement
                            –  Task Branch: Defines all P/C and Comm. Tasks within the
                                project. Each task is associated to equipment and to a progress
                                substage. Each task is part of a task activity and is linked to one
                                or several disciplines.
                            –  Progress Branch : Defines project sequence using a four levels
                                hierarchy
                                –  Punch list Branch: Defines all Punch List items during the
                                   overall project.
                                       Equipment                                               Progress
                                        Branch                                                  Branch
                                         Project                                               Project Seq 
                                       Subproject                                         Subproject Seq 
                                                    System                                       Stage 
                                       Subsystem                          Tasks
                                                                           Tasks
                                                                         Tasks                  Substage 
                                          Item
                                                                                           Users Group
                                                                         Punch
                                                                          Lists
                             
                                     Data written in italic are optionnal.
            General order of execution for different Task Activities is defined below (bottom
            corresponds to first tasks and upper part is for latest tasks.)
            TOTAL                                    ICAPS Engineering Manual                        Page 17 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                             17/19
7/26/2019                                              230335125 ICAPS Engineering Manual R3 10
             
                                               g       Piping & 
                                                              - Vessels Preparation        
                                               n
                                               i                   (PVP) 
                                               n
                                               o   s
                                               i
                                               s
                                               s   k
                                                             OperationalTests      
                                               i   s
                                                   a             (OTS)   
                                               m   T
                                               m
                                               o
                                                             FunctionalTests       
                                               C                 (FTS)   
                                                            Preliminary Checks         
                                                                  (PRC)  
                                               g
                                               n
                                               i
                                               n
                                               o   s
                                               i
                                                               Static Tests    
                                               s   k
                                               s   s
                                                                  (STS)  
                                               i
                                                   a                           
                                               m   T           Piping Tests
                                               m
                                               o
                                                                        
                                                                   (PIP)
                                               C                                       
                                               e
                                               r
                                                            Conformity Checks
                                               P                  (CCK)  
            TOTAL                                      ICAPS Engineering Manual                   Page 18 / 19 
http://slidepdf.com/reader/full/230335125-icaps-engineering-manual-r3-10                                          18/19
7/26/2019                                           230335125 ICAPS Engineering Manual R3 10
            6.4. Appendix 5 - Import Log Report
            6.5. Functional Specifications of Import / Export Module
            This technical document lists type by type the rules applied for import in and export
            from ICAPS database. Please refer to the following document:
            “ICAPS Engineering Manual – Annexe 1.doc”
            for more details about Import and Export rules.