KITCHEN
75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION
50mm x 200mm x 6mm THK
TUBULAR SECTION
75mm x 200mm x 6mm THK
TUBULAR SECTION
75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION 75x200x6mm thk TUBULAR SECTION
1500 1500 1500 1500
6000 6000 6000 6000
24000
AL FRESCO
ROOF FRAMING PLAN
SCALE 1:100 METERS
RIBBED GI ROOFING 300
750 2475 1425
50
FICEM BOARD CEILING
250
300
2% SLOPE 75mm x 200mm x 6mm THK
TUBULAR SECTION
50mm X 200mm TUBULAR STEEL 6" Ø BI PIPE SCHED 40
25mm X 25mm 300mm x 300mm x 16mm THICK BASEPLATE WITH
CEMENT BOARD CLADDING CEILING REVEAL 50
4-M16 HILTI HY-200 HIT-C
ANCHOR BOLTS WITH 150mm EMBEDMENT
6" Ø BI PIPE
SCHED 40
6mm x 6mm GROOVE
COLUMN
2850
CEMENT BOARD CLADDING
EXISTING DRY WALL
300
EXISTING RAILING
75mm x 200mm x 6mm THK
200
TUBULAR SECTION
AL FRESCO
50 300mm x 200mm x 12mm THICK BASEPLATE WITH
2-M12 HILTI HY-200 HIT-C
ANCHOR BOLTS WITH 100mm EMBEDMENT
BEAM
AL FRESCO
SECTION
SCALE 1:50 METERS
CONNECTION DETAILS
SCALE 1:20 METERS
CONSTRUCTION PHASE
PROPOSED ASTORIA PALAWAN
COMMERCIAL STRIP
PUERTO PRINCESA CITY, PALAWAN PHILIPPINES
JULY 31, 2017