100% found this document useful (1 vote)
2K views61 pages

Carton Sealer User Guide

This document provides instructions for operating and maintaining the MH-FJ-3A carton sealer. It describes the machine's functions, safety procedures, technical specifications, preparation steps, maintenance schedule, and troubleshooting guide. The machine automatically folds and seals the flaps of cartons. It is designed to seal cartons measuring 200-550mm in length, 150-480mm in width, and 120-480mm in height. Proper installation, use, and regular maintenance are required to safely and effectively operate this carton sealing machine.

Uploaded by

shariq202
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views61 pages

Carton Sealer User Guide

This document provides instructions for operating and maintaining the MH-FJ-3A carton sealer. It describes the machine's functions, safety procedures, technical specifications, preparation steps, maintenance schedule, and troubleshooting guide. The machine automatically folds and seals the flaps of cartons. It is designed to seal cartons measuring 200-550mm in length, 150-480mm in width, and 120-480mm in height. Proper installation, use, and regular maintenance are required to safely and effectively operate this carton sealing machine.

Uploaded by

shariq202
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 61

Perfect Unmanned Packaging System

MH-FJ-3A Carton Sealer


Use, Maintenance And Spare Parts Handbook
Rev Data

1
The machine should be exclusively operated by previously
trained personnel.

General safety regulations

Before using the machine or carrying out maintenance operation read the following
instructions very carefully:

Before

à Carefully read the instructions about the machine;


à Check all the safety guards on the machine and immediately replace any worn or
broken parts with original spares;
à Make sure that no tools or other objects have been left lying on the machine and
that the machine itself is perfectly clean;
à Read the Use, Maintenance and Spare Parts Handbook very carefully;
à Read all the labels and plates applied to the machine.

During

à Do not wear clothing that could get tangled up in the moving parts of the
machine;
à Do not carry on maintenance operation barefoot;
à Do not put the hands or any kind of object inside the field of operation of the
machine;
à Do not load the machine with boxes heavier than those recommended by the
manufacturer.

After

à Turn the master switch to OFF to stop the whole machine.


à Please close the air pressure.

2
The machine should be exclusively operated by previously
trained personnel.

Safety regulations for maintenance

à Follow the maintenance regulations given in this handbook;


à Never repair, lubricate or adjust the machine while it is in movement;
à Always turn off the power supply before opening the safety guards;
à Do not use any parts other than the originals without the written permission of
YOUNGSUN;
à Always use original spare parts.

Useful hints

à Always use appropriate electrical connection systems;


à Do not remove or cover up the labels and plates on the machine;
à Consult the Use and Maintenance Handbook whenever necessary.

3
INDEX

PART 1. DETAIL INTRODUCTION


1.1 Using machine affirms Page 06
1.2 Function Page 06
1.3 Tape Page 06
1.4 Case size Page 07
1.5 Machine size Page 08
1.6 Technical parameter Page 08

PART 2. PREPARATION BEFORE RUNNING


2.1 Pre-process Page 09
2.2 Nameplate Page 11
2.3 Moving and positioning Page 12
2.4 Working position Page 13
2.5 Inspection component and Set Page 14
2.6 Working height Page 15
2.7 Connected roller Page 16
2.8 Install bottom plane head Page 19
2.9 Install top plane head Page 20
2.10 Kinds of plane head Page 21
2.11 Connect power, electrical machine and use Page 22
2.12 Debugging Page 24

PART 3. SETTING
3.1 Pretreatment Page 25
3.2 Setting top plane head Page 25
3.3 Setting raceway cutout Page 26
3.4 Setting side wheel Page 26
3.5 Work cycle Page 27
3.6 Warning for Trouble shooting Page 27
3.7 Step for servicing Page 27
3.8 Possible troubles and processing method Page 28
3.9 Warning sign Page 29
3.10 Possible troubles menu Page 30

PART 4. SERVICE
4.1 Daily maintenance and provision Page 34
4.2 Replace raceway girdle Page 34
4.3 Wearing parts recommended list Page 35
4.4 Projects for regular maintain and cleaning Page 35

4
PART 5. CHART AND LIST FOR MAIN PARTS
5.1 Stander Page 36
5.2 Upright post component(lifting gear) Page 37
5.3 Parts of rollers Page 39
5.4 Side Powerplant Page 40
5.5 Plane head(install conveyer belt system) Page 42
5.6 Upper frame folding device Page 44
5.7 Clock mechanism Page 46

PART 6. WIRING AND SCHEMATIC DIAGRAMS


6.1 Wiring and schematic diagrams Page 58

5
PART 1: DETAIL INTRODUCTION

1. Using machine affirms:

Operating the machine

à The machine is developed for sealing cases, meanwhile it is allowed for the
purpose of using the sealing; please attention to the weight capacity in the
specification.
à Please use the machine after every term is explicit.

In the following cases, the machine does not allow to be used, such as:

à The protective cover is not in the place.


à Transmission roller is not in the place
à Bottom of the machine is instability.

The machine is not allowed to use in Explosion hazards area.

Notice:

Here clearly indicate, do no to wear bracelets, watches, rings, bracelets, ties,


belts, etc at work. The worker should limit the freedom of action to avoid harm to
themselves. Operaters’ clothes must comply with safety requirements when they
maintaining and operating

2. Function of the machine

Automatic folding case-lid, and then the machine automatically shut down both up
and down sides of the box.

Notice:

Cartons must be located in the middle of the machine, sealing parts of top and
bottom.

3. Tape

Plane head of machines have access to 48-72mm wide tape, it can be customized
according to customer needs.

6
4. Carton size:

(Refer to chart 1-1)

Notice:

In order for the machine to good working, please consider the length and breadth
and weight of cartons.

L
W

Chart 1-1

Native machine used in sealing size as follow, it can be customized according to


customer needs:

Length: 200-550mm; width: 150-480mm; height: 120-480mm

7
5. Machine Size (refer to the chart following)

6. Technical parameters MH-FJ-3A


Power supply 1P, AC220V, 50Hz, 400W
Air pressure 4kg/cm 2
Sealing speed 19meter/minute
Weight capacity 35kg
Machine size L1650mm×W980mm×H(table top add 1000)mm
Working table height 550-750mm (tunableness)
Sealing tap Kraft tap, BOPP tap
Tape size 48-72mm
Carton size L220-550mm×W150-480mm×H120-480mm
Machine weight 180kg
Noise ≤75DB
Condition Humidity≤98%, temperature 0-40℃
Lubrication General application lubrication oil
Manual position, top fin back-folding
automatically, transport in due time automatically,
Performance
don’t need to take care by the person, it adapts to
connect with the fully automatic production line.

8
PART 2: PREPARATION BEFORE RUNNING

1. Pre-process

Please check after open of wooden box:

à Any parts fall off from machine or not?


à Get rid of binding substances around the machine
à Check whether model correct or not
à Spare parts and tools and Operation manual with declare of signs symbols
à Report to manufacturer of any damages caused by transportation

1. a operation manual 2. spare parts and tools

Some need yourself to install upright, the installation steps are as follows:
Stand the upright on end, than screw it down with screws. As shown in Chart 2-2 and
2-3

base
upright column

Chart 2-2

9
Chart 2-3

10
2. Nameplate

Please inform the supplier the order number and Model of products for feedback
(chart 2-4)

Carton sealing machine

Chart 2-4

11
3. Moving and positioning

Forklift forks the beam(chart 2-5)removes the cork base, because of there are clock
mechanism and motor in the upper part of the machine. So pay attention to that :the
machine must set up in the enough room ,space between left and right are 800 mm
each at least.(chart 2-6)

Chart 2-5

80
0m
m

80
0m
m

Chart 2-6

12
4. Working position

When working ,the operator stand just right ahead away from the machine about
10cm(can operate the label object and the control panel freely will be ok).(Chart 2-7)

Chart 2-7

13
5. Inspection component and Set

1. Upright post component 6. Electrical box


2. Handle of adjusting height 7. Clock mechanism
3. Plane head 8. Handle of adjusting width
4. Holding box equipment 9. Side-impetus equipment
5. Base

14
6. working height

Working height of the machine is between 550-750mm(from rolling surface to ground


surface). Put the connection plate into the flex foot according to the direction of arrow
in the Chart 2-9, the flex foot is able to adjusted the height up and down. reuse within
hexagonal screw connect fixed block to connection plate that adjust the height of work
bench.

body of machine leg

nut (M8)

connection plate

flex foot

Chart 2-9

Notice:

Please check that whether the length and width are just the same after over the
aforementioned work.

15
7. Concatenate rollaway

The machine is able to connect to other rollways (such as unpowered straight rollways
etc. It is used regard as work bench or feedway of pipelining) the rollway that will put
up the carton sealer directly. There are three main forms, refer to Chart 2-10, 2-11,
2-12 shown:

The installation rack for concatenate rollaway refer to the shown:

The first species:

Chart 2-10

The second species

Chart 2-11

16
The third species:

Chart 2-12

The rollaway put up the carton sealer refer to shown:

The first species:

Chart 2-13

17
The second species:

Chart 2-14

The third species:

Chart 2-15

18
8. Install the plane head of bottom

Install the plane head has to get through correlation direct introductions, provide for
posterior work, service and accessories. Using the specify open ended rollaway that
accord with machine installed. Install the toward of plane head as shown Chart 2-16.
Screw bolts joint up the half hole set 1 and the hole set 3 in Chart 2-16.Put the hole set
2 up the back shaft set 4 sufficiently.

Chart 2-16

19
9. Install the plane head of upper part of carton sealer

After getting ready for the plane head of upper part of carton sealer, heave up tie bar
set 4 in chart 2-17, put the plane head in as shown, let the tie bar go when the hole set
2 in chart 2-17 is arming at the tie bar, meanwhile, the half hole set 1 is just on the
back shaft set 3 in chart 2-17 sufficiently.

2
1
4

Chart 2-17

20
10. Kinds of plane head

Every kind of plane head is fit for any carton sealer. It is easy and faster to install.

21
11. Connect power、electrical machine and go into service

Notice:

Before connecting power, please check that whether the power on-off is closed, if
there are other goods on the worktable or not first.

Confirmation before using

à Please confirm the power supply for the machine.


à Check whether the fastener become less crowded or not .
à Check whether the motor and electric equipment are dry or not, the insulation is
well or not.
à Power switch must be installed in safe place(chart 2-18 set 1 red revolve button)
à When it used three-phase voltage, overload protection are equipped. Each
attribute should be adjusted properly.(see as Fig 1 )

Chart 2-18

22
Single-phase machine

Voltage(V) 220 220 240 110 100


Frequency (Hz) 50 60 50 60 50/60
Electric current(A) 2.5 2.5 2.5 6.0 5.0

Three phase machine

Voltage(V) 220 400 240 260 415 440 200


Frequency(Hz) 50 50 50 50 50 50 50/60
Electric current (A) 1.6 0.9 1.6 1.6 0.9 0.9 1.6

FIG 1

23
12. Debugging:

à Switch on the power supply after 2-5 minutes’ operation, check whether operation
is normal.
à Shaking the handle of adjusting width by hand to assure if the movement of side
impetus equipment is flexible.
à Shaking the handle of adjusting height by hand to assure if the movement of
Upper band conveyer equipment is flexible.
à Check whether the belt is out of side.
à Adjust the degree of tightness of the belt.
à Check whether the flow of the inner adhesive tape of the cassette mechanism is
smooth.

Notice:

The machine can only use onboard plug, please do not remove the plug wires

à Put a machine into service, please click the start button.


à Check whether the girdle turn to the correct direction.(transmission direction
of cartons), the transmission direction is point with the arrow in Chart 2-18.If
use three phase machine, and the transmission direction is not correct,
please exchange both ends of the plug.

24
PART 3: SETTING

1. Pretreatment

Put the cartons which need sealed on the roller way, then install different conditions
properly.

2. Install up plane head

adjustable handle

carton

Chart 3-1

Put the carton into the machine, shown as Chart 3-1, Install plane headby dint of the
racker(Chart 3-1 seat 1), make the plane head move down to the top edge of the
carton.

25
3. Install cutout of the rollaway

Put the carton on specific location, agitating the handle(Chart 3-2) until the belt touch
the edge of the carton.

Side-impetus
wheel equipment

carton

width adjustable handle

Chart 3-2

4. Install side wheel

Put the roller on the upside of the carton, then fixed(Chart 3-3)

screw down

Chart 3-3

26
5. Cycle of operation

à Start the machine gets by start button.


à Automatic feed the carton, when the carton get to the place of side power plant,
the belt of side power plant driving the carton along.
à Upside and underside of Sealed body are pressing and sticking with up and
down nip rollers, come into being auto boxing
à After the require of feeling carton is contented, the blade auto shut the adhesive
tape down.
à Keep the machine automatic working, the process to finish sealing a carton is a
cycle of operation.

Notice:

The carton has to lie in the middle of the machine, meanwhile, maintaining the
space between.

6. Warning of corrective maintenance

Notice:

When the machine is broken down, please ask the professional to overhaul, the
one have to know on the electric motor and machinery. Before maintaining, must
be sure there is enough space around the machine in order that the professional
can shy away from hurt in maintaining.

7. Steps of maintenance:

à Stop the machine.


à Cut off the power supply.
à Take down the plane head.
à Take other machinery parts of the machine down.
à Take off the machine from equipments.
à Prepare for transporting the machine, fastening moving parts.

If the machine scrap ,please go ahead according to following process:

à Take the protective devices down.


à Classify the parts on different materials.(metal、plastics、rubber etc.), then go
ahead the garbage classification for it.

27
8. Frequent trouble and troubleshooting:

8.1 The adhesive tape deviates the center of the box body:

adjust the position of the adhesive tape.(Chart 3-4)

20mm

Chart 3-4

8.2 The adhesive tape can not be cut off:

the blade is too high and easy to scrape the carton.


The blade is too low easily led to that the adhesive tape can not be cut off.(Chart
3-5)

8.3 The adhesive tape can not press through(the carton has not press firmly):

the quality of the adhesive tape is not so good or one-way rubber wheel is wrong
(Chart 3-5)

Chart 3-5

28
9. Warning mark

1. Electric shock, operate carefully!

! WARNING

ELECTRIC SHOCK
Operate carefully

2. Rolling, keep hands away!

! WARNING

ROLLING
Keep hands away

3. Dangerous, Do not touch!

! WARNING

DANGEROUS
Don't Touch

29
10. Catalogue of possible trouble

10.1. The machine can not start up.


10.2. The machine alarming.
10.3. The girdle can not work.
10.4. Automatic circulation is broken.

10.1. Trouble description: The machine can not start up.

10.1 Trouble description: The machine can not start up

check

Electrical Pneumatical Mechanical

Power

Plug connection

If emergency switch
be shut down

If sensor be touched
off

30
10.2. Trouble description: The machine alarming.

10.2 Trouble description: The machine alarming.

check

Electrical Pneumatical Mechanical

Alarm is touched off

Plug connection

Sensor is touched off

31
10.3. Trouble description: The girde can not work.

10.3 Trouble description: The girde can not work.

check

Electrical Pneumatical Mechanical

Sensor is touched off Chain

32
10.4. Trouble description: Automatic circulation is broken

10.4 Trouble description: Automatic circulation is broken

check

One kind of above

Others, please report services

33
PART 4: SERVICE

1. Daily maintenance

It is favourable for the machine if screws require periodic inspection that to insure well
operatin.Moreover, working speed of the carton sealer is fast,in the place of big
amount of work,every machine should works 16 hours a day.Thus keep parts in good
lubrication usual.Must lubricate major parts regularly which are not listed in the
manual to make the machine long service life.

2. Replace rollaway girde

After long term usage,rollaway girdle maybe broken.If you want to replace it,please
refer to the process as followers:

à Srew off 4 screws(Chart 4-1 post 1), take down the protective cover of girdle.
à Ease grade the adjuster bolt(Chart 4-1 post 2), up to the girdle is flexible
à Replace the girdle.
à Manual rotate girdle, meanwhile ,lead the girdle in place
à Screw down the adjuster bolt(Chart 4-1 post 2).
à Correct tensity determined through pulling the middle of Rollaway lightly(Chart
4-2), Girdle swell needed about 20mm, with the screwdrive r to adjust adjuster
bolt(Chart 4-1 post 2, right to screw down, left yo relax).
à Cover the protective cover ,set screws.

Chart 4-1

34
20mm

Chart 4-2

3. Components Items repaired or changed by operator

No. Change component name Code No.


1 Side power belt 3370mm
2 Roller FJ-3A-182/183
3 Tension spring shaft of knife carrier FJ-00-01
4 Knife rest down tension spring FJ-H-05
5 Blade shelf defending torsion spring FJ-H-01
6 Blade
7 Tape pressing plate torsion spring FJ-H-03

4. Routine check and clean

à Must check all screws loosen or not of every part of the machine.
à Must lubricate major parts regularly.
à Remain the machine surface clean.
à Clean up foreign bodies on the blade every day.
à Spread lubricating grease on the blade if the machine is not be used in a long
time.

35
PART 5: CHART AND LIST FOR MAIN PARTS

1. Machine frame component

detailed parts list

no. name code no. qty remark


1 Machine frame FJ-3A-183 1
2 Front machine feet FJ-3A-16 2
3 Connection plate FJ-3A-105 4
4 Extension tube FJ-3A-17 4
5 Behind machine feet FJ-3A-15 2

36
2. Upright post component (lifting gear)

37
detailed parts list

no. name code no. qty remark


1 Handle FJ-3A-112 1
2 Bending pole FJ-3A-113 1
3 Helve FJ-3A-114 1
4 Beam FJ-3A-37 1
5 Chain 06B 1
6 Chain wheel FJ-1A-131 2
7 Bearing 6905-2Z 2
8 Shoe plate FJ-1A-69 4
9 Lift leading screw II FJ-3A-129 1
10 Upright post body FJ-3A-7 2
11 Lift leading screw FJ-3A-130 1
12 Lift body FJ-3A-164 2
13 Idler wheel FJ-3A-140 8
14 Nut FJ-3A-127 2

38
3. Roller combination

1
2

detailed parts list

no. name code no. qty remark


1 inside and outside end plate φ32 Roller 2 unit Match 6001bearing
Long shaft FJ-3A-95 1
2
Short shaft FJ-3A-94 1
Long roller FJ-3A-96 1
3
Short roller FJ-3A-96 1

39
4. Side power plant

40
detailed parts list

no. name code no. qty remark


1 Right nut Seat FJ-3A-143 2
2 Left and right leading screw II FJ-3A-91 1
3 Cover plate FJ-3A-186 1 Each one
4 Upper plate of side power FJ-3A-184 2
5 Lower plate of side power FJ-3A-185 2
6 Belt 3370mm 2
7 Driving wheel FJ-3A-117 2
8 Main driving shaft FJ-3A-90 2
9 Spacer bush of driving wheel FJ-3A-141 2
10 Bearing 6005 2
11 Shaft block FJ-3A-116 2
12 Install panel FJ-3A-110 2
13 Linear bearing base FJ-3A-135 2
14 Guide column FJ-3A-97 1
15 Left and right leading screw I FJ-3A-92 1
16 Motor CV200/20Z G1、G2 各1
17 Fulcrum FJ-3A-101 4
18 Connection pole FJ-3A-100 4
19 Orientation plate FJ-3A-109 2
20 Left –rotate nut FJ-3A-142 2
21 Tensioning shaft FJ-3A-87 2
22 Tension sheel sleeve FJ-3A-119 4
23 Wheel FJ-3A-118 2 Enhance PA
24 Chain wheel FJ-3A-110 2

41
5. Plane head

5
4

3
2

detailed parts list

no. name code no. qty remark


1 Fixed shaft FJ-3A-85 1
2 Fixed block FJ-1A-43 1
3 Plane head frame FJ-3A-151 1
4 Supporting axle FJ-3A-86 1
5 Brush 1

42
5
4
3
2
1

detailed parts list

no. name code no. qty remark


1 Tension rod FJ-3A-122 1
2 Fixed block FJ-3A-63 1
3 Setting bolt spring for mechanism lock catch FJ-3A-120 1
4 Spring base FJ-3A-122 1
5 Slide block FJ-3A-121 1

43
6. upper cover folding device

44
detailed parts list

no. name code no. qty remark


1 Gland frame FJ-3A-181 1
2 Board drop hammer FJ-3A-178 1
3 Bearing block LF203 2
4 Bearing SBLF203 2
5 Upper carriage FJ-3A-177 1
6 Fulcrum shaft of pendulum bob 1 with item 7 together
7 Balance weight FJ-3A-155 1
8 Fulcrum shaft FJ-3AR-59 1
9 Fulcrum shaft M12x1.25 1
10 Cylinder SC40×80 1
11 Cylinder shaft adapter SC40-CB 1
12 Cylinder accessories SC40-CA 1
13 Cylinder fixed plate FJ-3A-154 1

45
7. Cassette mechanism

9 10
1 2 3 5 6 12 7 8
4
11

12

13

21

15 14
8 7
20 19 18 17 16

46
detailed parts list

no. name code no. qty remark


1 Side plate FJ-01-17 1
2 Guide pulley combination 1 See 7.4
3 One way roller combination 1 See 7.3
4 Blade carrier FJ-01-21 1
5 Front claw combination 1 See 7.1
6 Square pole(1) FJ-01-00 2
7 Shaft FJ-00-12 2
8 Cushion collar FJ-40-00 2
9 Platelet FJ-01-02 1
10 Large shaft of tension spring FJ-00-02 1
11 Suppiorting axle FJ-00-07 1
12 Main fulcrum FJ-00-06 4
13 Set square FJ-01-16 1
14 Spacer bush of front claw FJ-02-09 1
15 Back roller side plate combination 1 See 7.2
16 Sheet brass FJ-02-04 1
17 Connecting rod FJ-01-15 1
18 Knift back plate combination 1 See 7.5
19 Knife leveling piece FJ-01-01 1
20 Adhesive tape wheel combination 1 See 7.6
21 Down tension spring of movement FJ-H-07 1
22 Knife tension spring axle FJ-00-01 1
23 Down tension spring of knift rest FJ-H-05 1

47
7.1. Front claw combination

48
detailed parts list

no. name code no. qty remark


1 Synapticulum FJ-01-09 1
2 Front and back roller shaft FJ-00-10 1
3 Onr way roller shaft FJ-E-38-01 1
4 Front rubber roller wheel FJ-E-41-01 1
5 Press spring of front roller wheel FJ-H-02 1
6 Washer of front roller wheel FJ-04-06 1
7 Cross flat trench screw M4x12 1
8 Cross flat head screw M5x15 1
9 Press tape board combination 1 See 7.8
10 Holddown unit 1 See 7.9
11 fulcrum of front claw FJ-00-09 1
12 spacer of guide tape board FJ-02-02 2
13 Bearing 6900(1080900) 1
14 Front claw FJ-50-00 1
15 Guide tape wheel combination 1 See 7.7
16 knurlingspacer bush of guide tape wheel FJ-02-11 1
17 Bearing 688Z(208088) 1
18 Bearing HK2020 1
19 Roller wheel of Guide tape board FJ-02-10 1
20 Tehsion spring shaft FJ-00-11 1
21 Fulcrum of front claw FJ-00-09 1
22 Tension spring of guide tape board FJ-H-00 1

49
7.2. Back roller side plate combination

1 2 3 4 5 6

10
9 7
6
8

detailed parts list

no. name code no. qty remark


1 Back synapticulum FJ-01-13 each 1
2 Front and back roller shaft FJ-00-10 1
3 Back rubber roller wheel FJ-40-03 1
4 Main fulcrum FJ-00-06 1
5 Axle sleeve of back claw FJ-02-05 1
6 Back locating ring FJ-02-06 2
7 Bearing 6800Z(26800) 2
8 Tension spring shaft of back claw FJ-00-05 1
9 Washer of back claw FJ-02-00 1
10 Bearing 688Z(208088) 1

50
7.3. Reicnlbation roller combination

1
2
3
4

4
6
7

detailed parts list

no. name code no. qty remark


1 Locknut M8 1
2 Nut M8 1
3 Washer of one way wheel FJ-02-03 1 φ8
4 Bearing HF1216 2
5 Reicnlbation roller FJ02-00-03 1
6 Shaft of one way wheel FJ-00-04 1
7 Speaser of one way wheel FJ-02-01 1

51
7.4. Guide pulley combination

5
4
3

detailed parts list

no. name code no. qty remark


1 Guide pulley shaft FJ-00-18 1
2 Axle sleeve FJ-E-37 1
3 Big plain washer φ5 1
4 Flip washer φ5 1
5 hexagonal socket screw M5X12 1

52
7.5. knife back plate combination

1 2 3 4 5 6 7

10

detailed parts list

no. name code no. qty remark


1 Shaft of knife back plate FJ-00-00 1
2 Torsion spring of knife back plate FJ-H-01 1
3 Protecting blade carrier FJ-01-06 1
4 Sponges 1
5 Nut M4 1
6 Knife board FJ-40-04 1
7 Blade 1
8 Blade carrier block FJ-01-07 1
9 Hexagonal socket screw M4x16 2
10 Cross flat trouch screw M4x12 1

53
7.6. Adhesive tape wheel combination

detailed parts list

no. name code no. qty remark


1 Tape frame FJ-05-01 1
2 Axle sleeve of Adhesive tape wheel FJ-02-12 1
3 Antiskid slice FJ-50-01 2
4 Tape wheel FJ-E-40-01 1
5 Packing washer FJ-05-02 1
6 Pressure spring FJ-H-08 1
7 Hand nut FJ-00-14 1
8 Carrier ring FJ-02-08 1
9 Washer φ5 1
10 Lock nut M5x40 1

54
7.7. guide tape wheel combination

detailed parts list

no. name code no. qty remark


1 Fulcrum of front claw FJ-00-09 1
2 Knurling axle sleeve of guide tape wheel FJ-02-14 2
3 Guide tape wheel FJ-02-13 1

55
7.8. Press tape board combination

detailed parts list

no. name code no. qty remark


1 Fulcrum of front claw FJ-00-09 1
2 Press tape board FJ-01-05 1
3 Torsion spring of press tape board FJ-H-03 1

56
7.9. Guide tape board combination

1
2

3
4

detailed parts list

no. name code no. qty remark


1 Spacer of Guide tape board FJ-02-02 2
2 Fulcrum of front claw FJ-00-10 1
3 Axle sleeve FJ-02-10 1
4 Guide tape board FJ-01-08 1

57
LW26 -20 2P
1 5 4 2
L N

LC1 PYF-08N+RXM2LB1P7
D0910-M7N
L1 N1
L1 N1 1 2 5 D1 6 6 5 4
1 0 X2
QF1*10A QF2*1A KM1 KA1 KA2

0
U W D2
1 0 2
X1 0 6 6 0 7 Y

58
PART 6: WIRING AND SCHEMATIC DIAGRAMS

1
2
3
4
5
6
7
8
9
20
21
22
23
25
26

11
12
13
15
17
18
19
24

10
14
16

L
N
U
U
U
W
W
W
0
Y
0
1
2
3
4
5
6
6
7
X1
D1
X2
D2

TZ9108

2010.01.12
QS QF1 1
L1 2
L
220VAC N1 FU1
N
3
PE

KM1 4

U1 W1
5

59
X1
U1 W1 U1 W1

7 Y X2
M1 M2

0.2KW
60

You might also like