Ayo WS
Ayo WS
Water Supply
1. Assess the Service Level Gap
The first step is to assess the existing situation and service levels gaps for Water Supply (AMRUT
Guidelines; para 3 & 6). This will also include existing institutional framework for the sector. AMRUT is
focused on improvement in service levels. The zone wise data shall be used in identifying the gaps. These
zone-wise gaps will be added to arrive at city level service gaps. While assessing service level gap reply
following questions not more than word indicated against each question.
Question: What kind of baseline information is available for water supply system of the city? Detail out the
data, information, plans, reports etc related to sector. Is zone wise information available? (75 words)
DPR of water supply is with Uttar Pradesh Jal Nigam and other baseline information related to water
supply system is with Ayodhya Nagar Palika Parishad. zone wise information is available.
Question: Have you collected census 2011 data? Are you aware of baseline survey data of MoUD? Have
you correlated data from these and other sources? (75 words)
What are existing service levels for water supply in the city? What is the coverage of water supply
Connections? What is per capita supply of water? How much is the extent of metering? How much is non-
revenue water? Provide information in table
Present MOUD
Sr. No. Indicators Status Benchmark Reliability
Please provide information in 150 words on the above responding to (however not limited to) following
questions.
Question: What is the existing source of water? Is it surface water source or under ground water source?
What is the capacity of these sources?
Question: Is there any treatment provided to water from these sources? How much water is required to be
treated daily?
What is the treatment capacity installed in the city?
Question: What per capita water supply in LPCD (liter per capita per day) comes out, if you divide total
water supply by the total population.?
The existing source of water is ground water. Yes treatment is provided to these sources by
chlorination.
At present, Per capita of Water supply is 12.75/0.086120=148 LPCD, Beside this water supply
additional water, in some areas at higher point sufficient water supply in not available.
DISTRIBUTION ZONES
Please provide information in 150 words on the above responding to (however not limited to) following
questions.
Question: Provide details of total no of Households (HH) in each zone, no of HH with and without water tap
connections in the Table
STORAGE OF WATER
Please provide information in 150 words on the above responding to (however not limited to) following
questions.
Question: What is the total water storage capacity in the city? What is capacity of elevated and ground
water reservoirs?
Question: Is water being supplied to consumers through direct pumping or through elevated reservoirs?
Water is being supplied to consumers through direct pumping and elevated reservoirs.
DISTRIBUTION NETWORK
Please provide information in 150 words on the above responding to (however not limited to) following
questions.
Question: What is the total length of water supply distribution pipe line laid in the city?
Total length of water supply distribution pipe line is 52 KM.
Question: What is the total road length in the city? Is the pipe lines are laid in all streets? Is the objective of
universal coverage of water supply pipe line is achieved?
Total length of the road in the City is 64.00 KM. Only 12 Km pipe line is not laid in the city. The
objective of universal coverage is not achieved because 12 km pipe line still remains to be laid.
Question: What are the kinds of pipe materials used in distribution lines?
PVC, CI,DI, AC are the kind of pipe materials used.
Question: Provide zone wise details of street length with and without water distribution lines in the Table?
Table: Zone Wise length of distribution network
INSTITUTIONAL FRAMEWORK
Please provide information in 150 words on the above responding to (however not limited to) following
questions.
Question: Define role and responsibilities in terms of O&M, policy planning, funding, service provision in
table
Table: Functions, roles, and responsibilities.
To achieve universal coverage activities like: IEC & Awareness Campaign, , Leakage detection and
its removal, online billing, tracking system & spot billing machine, expansion of payment collection
centre shall be done by Nagar Palika Parishad Ayodhya while capital projects like Expansion of
water supply distribution network in uncovered pockets, Replacement of old pipelines, laying of
branch lines, Replacement of inefficient pumps & establishment/rehab of water testing lab and
100% implementation of metering will be executed by UP Jal Nigam.
Question: Shall the implementation of project be done by Municipal Corporation or any parastatal body?
Please refer para 8.1 of AMRUT guidelines.
Implementation of the project shall be done by Nagar Palika Parishad, Ayodhya as well as State
Level Parastatal Agency U.P. Jal Nigam. Nagar Palika Parishad, Ayodhya will follow the para 8.1 of
the AMRUT Guidelines while execution of the project.
Question: List out initiatives undertaken in different ongoing programs and projects to address these gaps.
For this provide details of ongoing projects being carried out for sector under different schemes with status
and when the existing projects are scheduled to be completed? Provide information in Table
Table: Status of Ongoing/ Sanctioned
No ongoing project.
NA
Question: How much the existing system will able to address the existing gap in water supply system? Will
completion of above will improve the coverage of network and collection efficiency? If yes, how much. (100
words)
There is no ongoing project for water supply system
Question: Does the city require additional infrastructure to improve the services? What kind of services will
be required to fulfill the gap?
Yes. Ayodhya while capital projects like expansion of water supply distribution network in
uncovered pockets, replacement of old pipelines, laying of branch lines, construction of tubewells
will be executed by UP Jal Nigam. Additional infrastructure is required e.g. increase universal
coverage, replacement of old line to reduce NRW.
Question: How does the city visualize taking the challenge to rejuvenate the projects by changing their
orientation, away from expensive asset replacement programs, to focusing on optimum use of existing
assets?
Earlier focus on scheme was to create infrastructure and now our focus is to increase coverage,
Question: Has city conducted assessment of Non Revenue Water? If yes, what is the NRW level? Is city
planning to reduce NRW?
No, City has not conducted any assessment related to NRW Nagar Palika Parishad, Ayodhya have
approximately NRW level is 35%.
Question: Based on assessment of existing infrastructure and ongoing / sanctioned projects, calculate
existing gaps and estimated demand by 2021 for water supply pipe network, number of household to be
provided with tap connections, and required enhancement in capacity of water source/ treatment plant
(MLD). Gaps in water supply service levels be provided as per Table
Treatment capacity 12.75 MLD 0 12.75 MLD 13.5 MLD 0.75 MLD
OBJECTIVES
Based on above, objectives will be developed to bridge the gaps to achieve universal coverage. While
developing objectives following question shall be responded so as to arrive at appropriate objective.
Please provide List out objectives to meet the gap in not more than 100 words.
Question: Does each identified objectives will be evolved from the outcome of assessment?
Objects are identified from the gap and these objectives will be evolved from the
outcome of the assessment. Details are in table
Objectives Activities to be performed to bridge the gap Cost
TO ACHIEVE PUBLIC AWARENESS TO INCREASE HOUSE HOLD 1.44 Cr
UNIVERSAL CONNECTIONS -IEC ,CAPACITY BUILDING, ASSESSMENT
COVERAGE STUDY FOR AUTHORISED /ILLEGAL CONNECTIONS AND
UNTAPPED/SUBMERSIBLE HOUSE HOLD ETC- AMRUT
A&OE, HOUSE HOLD COVERAGE THROUGH WATER
SUPPLY HOUSE CONNECTIONS– 2196 HH X Rs 5000
Question: Does each objective meet the opportunity to bridge the gap?
Question: What are the possible activities and source of funding for meeting out the objectives? (75 words)
Only AMRUT project funding source is meet out the objectives demand below in the table
Question: How can the activities be converged with other programme like JICA/ ADB funded projects in
the city etc? (100 words)
There is no any ongoing project.
Question: What are the options of completing the ongoing activities? (75 words)
NA
Question: How to address the bottlenecks in the existing project and lessons learnt during implementation
of these projects? (75 words)
In earlier projects, there was a focus on increasing the capital infrastructure and no
effort has been made to enhance service level.
Question: What measures may be adopted to recover the O&M costs? (100 words)
Question: Whether reduction in O&M cost by addressing NRW levels be applied? (75 words)
Question: Does each objective meet the opportunity to bridge the gap?
Yes each objective meet the opportunity to bridge the gap.
THE ALTERNATIVE ACTIVITIES TO MEET THESE ACTIVITIES BE DEFINED
AS PER TABLE
Total 11.26
LEAKAGE DETECTION AND ITS REMOVAL 1.0
TO MAKE
SYSTEM WATER SUPPLY ZONING OF SERVICE AREA. (05 X 2.5 AMRUT/State
2 EFFICIENT BY 0.50)
and ULBs
NRW 100% IMPLEMENTATION OF METERING. 0.7206 x 0.28
REDUCTION 0.0035
Total 3.78
3 TO IMPROVE AUTOMISATION OF 17 TUBE WELL and 7 OHT 2.36 AMRUT/State
THE QUALITY THORUGH SCADA with Central Control Unit and ULBs
OF WATER
4 TO MAKE ESTABLISHMENT OF WATER TESTING LAB and 0.50
MCS building AMRUT/State
SYSTEM
and ULBs
ENERGY
EFFICIENT
5 EFFICIENCY ONLINE BILLING , TRACKING SYSTEM & SPOT 0.10
IN CHARGES BILLING MACHINE ,REHABILITATION AND AMRUT/State
EXPANSION OF PAYMENT COLLECTION CENTER and ULBs
COLLECTION
Total 18.00
4. Citizen Engagement
ULBs will organize and conduct city level citizen consultation and receive feedback on the suggested
alternatives and innovations. Each alternative will be discussed with citizens and activities to be taken up will be
prioritized to meet the service level gaps. ULB will prioritize these activities and their scaling up based on the
available resources. (AMRUT Guidelines; Para 6.6, 6.7 & 7.2). Please explain following questions in not more
than 200 words detailing out the needs, aspirations and wishes of the local people.
Yes,
Yes, Feedback on the suggested alternatives and innovations are being considered.
Question: Has alternative taken up for discussions are prioritized on the basis of consultations?
Yes, alternatives taken up for discussions are prioritized on the basis of consultation
Prioritizing the alternatives has been done through departmental and public consultation using existing
resources first and then if required augment the resources.
5. Prioritize Projects
Based on the citizen engagement, ULB will prioritize these activities and their scaling up based on the available
resources to meet the respective objectives. While prioritizing projects, please reply following questions in not
more than 200 words.
The source of funding of activities shall be: 1. AMRUT, 2. 14th Finance Commission 3. State Government
Funds 4. ULBs 5. PPP
Question: Has projects been converged with other program and schemes?
There is no scheme running in the city.
Question: Has projects been prioritized based on “more with less” approach?
Yes, the projects are being prioritized based on “more with less” approach with universal coverage
through IEC activities etc.
Question: Has the universal coverage approach indicated in AMRUT guidelines followed for prioritization of
activities?
Yes
6. Conditionalities
Describe in not more than 300 words the Conditionalities of each project in terms of availability of land,
environmental obligation and clearances, required NOC, financial commitment, approval and permission
needed to implement the project.
Public awareness to increase the coverage of water, SCADA and augmentation of water supply
system no environmental clearances, NOC, approval and permission is required.
7. Resilience
Required approvals will be sought from ULBs and competent authority and resilience factor would be built
in to ensure environmentally sustainable water supply scheme. Describe in not more than 300 words
regarding resilience built in the proposals.
Yes, resilience factor like disaster and environmental would be considered while framing DPR.
8. Financial Plan
Once the activities are finalized and prioritized after consultations, investments both in terms of capital cost
and O&M cost has to be estimated. (AMRUT Guidelines; para 6.5) Based on the investment requirements,
different sources of finance have to be identified. Financial Plan for the complete life cycle of the prioritized
development will be prepared. (AMRUT Guidelines; para 4, 6.6, 6.12, 6.13 & 6.14). The financial plan will
include percentage share of different stakeholders (Centre, State and City) including financial convergence
with various ongoing projects. While preparing finance plan please reply following questions in not more
than 250 words
Question: How the proposed finance plan is structured for transforming and creating infrastructure
projects?
As per the guidelines of the AMRUT, 50% of project cost will be borne by GOI and remaining 30%
by State and 20% by ULB.
Question: Has financial plan prepared for identified projects based on financial convergence and
consultation with funding partners?
Yes, financial plan prepared for identified projects are based on financial convergence and
consultation with funding partners GOI,State and ULB.
Question: Is the proposed financial structure is sustainable? If so then whether project has been
categorized based on financial considerations ?
Yes, the proposed financial structure is sustainable and project has been categorized based on
financial considerations.
Yes, financial assumptions are 50% of project cost will be borne by GOI and remaining 30% by
State and 20% by ULB.
Question: Does financial plan for the complete life cycle of the prioritized development?
Yes, financial plan has been done for the complete life cycle of the prioritized development
Question: does financial plan include percentage share of different stakeholders (Centre, State, ULBs)
Yes, financial plan include percentage share of different stakeholders (Centre, State and ULB)
Table 8.1 Master Plan of Water Supply Projects for Mission period
(As per Table 2.1of AMRUT guidelines)
Total 18.00 Cr
1 TO ACHIEVE PUBLIC AWARENESS TO INCREASE HOUSE HOLD Coverage 63.54% 100% 11.26 Cr
UNIVERSAL CONNECTIONS-IEC ,CAPACITY BUILDING,
COVERAGE ASSESSMENT STUDY FOR AUTHORISED /ILLEGAL
CONNECTIONS AND UNTAPPED/SUBMERSIBLE
HOUSE HOLD ETC- AMRUT A&OE, HOUSE HOLD
COVERAGE THROUGH WATER SUPPLY HOUSE
CONNECTIONS – 2875 HH X Rs. 5000
4. EFFICIENCY ONLINE BILLING , TRACKING SYSTEM & Collection 60% 90% 0.10 Cr
IN CHARGES SPOT BILLING MACHINE ,REHABILITATION Charges
COLLECTION AND EXPANSION OF PAYMENT
COLLECTION CENTER
CONCTRUCTION OF
TUBEWELLS 1No. @
0.52Cr./Tubewell
Rehabilitation of old
distribution system 14 Km@30
lac /Km
REBORE OF TUBEWELLS 1No.
@ 0.30Cr./Tubewells
100% IMPLEMENTATION OF
METERING. 0.7206 x 0.0035
Sr. Objective Proposed Projects Project Indicator Baseline Annual Targets (Incremet from the Baseline
No. Cost Value)
FY 2016 FY FY FY FY
2017 2018 2019 2020
H1 H2