GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
       SPECIFICATION
            FOR
      AC CONTROL PANEL
            FOR
ROOF MOUNTED AC PACKAGE UNIT
    No. : ELPS/SPEC/AC/04 (REV. 2)
            AUGUST 1999
      RESEARCH DESIGNS AND STANDARAD ORGANISATION
             MANAK NAGAR, LUCKNOW – 226 011
                  GOVERNMENT OF INDIA
                  MINISTRY OF RAILWAYS
      RESEARCH DESIGNS AND STANDARDS ORGANISATION
                 MANAK NAGER, LUCKNOW
SPECIFICATION No. ELPS/SPEC/AC/04 Rev. 2) (Aug’ 99)
SPECIFICATION FOR A.C. CONTROL PANEL FOR ROOF MOUNTED
 A.C. PACKAGE UNIT WITH TWO COMPRESSORS PER PACKAGE
             WITH 110 V AC CONTROL SUPPLY
1.     SCOPE
1.1    This specification covers the design, manufacture, testing and supply
       of A.C. Control panel and cable harness for Roof Mounted A.C.
       Package Unit fitted on Railway coaches.
       This specification is the revision of specification No.
       ELPS/SPEC/AC/04 (Rev. 01) of September 1996 incorporating its
       amendment.
1.2    The control circuit shall work from 110 V AC power supply.
2 BASIC GENERAL REQUIREMENTS AND SERVICE CONDITIONS
2.1    Environmental Conditions :
       Maximum ambient air temp.            57 deg. C
       Average ambient air temp.            35 deg. C
       Maximum relative humidity            100%
       Atmosphere              Extremely dusty and desert weather and
                               desert terrain in certain areas. The dust
                               content in air may reach as high values as 1.6
                               mg/cub. m.
      Coastal area         The equipment shall be designed to work
                                 in coastal area in humidity salt laden and
                                 corrossive atmosphere.
                                 The maximum value of the condition will
                                 be as under :
                                 Max. PH value : 8.5 Sulphate : 7 mg/litre
                                 Max. chlorine : 6 mg/litre. 130 micro-
                                 semen/CM.
      Annual rainfall            Ranging between 1750 to 6250 mm
      Altitude                   No. exceeding 1200 m.
2.2   Working conditions :
      Train speed (max.)               160 Kmph.
      Vibration and shock :
      a).   Maximum vertical acceleration     :            1.0 g
      b).   Maximum lateral acceleration      :            2.0 g
      c).   Maximum Longitudinal acceleration :            3.0 g.
      Where ‘G’ is acceleration due to gravity. The vibrations are of sine
      wave from the frequency of vibration is between 1 and 50 Hz. The
      amplitude of vibration ‘a’ (in mm) varies as function as per the
      following formula :
      ‘a’ (in mm)          =     25/f          for 1 to 10 Hz
                           =     250/f² for 10 to 50 Hz
3 SYSTEM OF POWER SUPPLY
3.1   End on Generation system of power supply :
3.1.1.A/C control panels shall be fed from any two phases 415 V ac, 3
       phase, 50 Hz PWM power supply obtained from the coach inverter on
       self Generating Air-conditioned coaches.
3.1     Self Generating system of power supply
3.1.1      A/c Control Panels shall be fed from any two phases of 415 V ac, 3
           Phase, 50 Hz PWM power supply obtained from the coach inverter
           on self Generating Air-conditioned coaches
3.2.2.On AC coaches fitted with an inverter having a separate filtered control
panel supply of 415 V phase to phase ac., the control panel will be fed from
this supply through spare terminals provided on A/C Control panel incoming.
3.3.On both types of A/C coaches mentioned in 3.1 & 3.2 the control panel
circuit shall work on 110 V ac single phase, 50 Hz power supply obtained
from a 415/110V step-down transformer provided in the A/C control panel.
3.4     The maximum ripple contents of 415 V & 110 V ac supply can be upto
        15%.
4 GOVERNING SPECIFICATIONS
4.1 The control panel shall conform to following standards
        IS : 5-1994        Colors for ready mixed paints and enamels
                           (Fourth Revision)
        IS : 513-1994      Cold rolled low carbon steel sheet and strips
                           (Fourth revision)
        IS : 248-1983    Direction acting indicating analog electrical (Part 2)
                    measuring instruments and their accessories.
                         Part 2 Ammeter and voltmeter (second revision).
        IS : 2147-1962     Degree of protection provided by enclosures for
                           low voltage switch gear and control gear.
        IS : 2551-1982     Danger notice plate.
        IS : 13947-1993    Specification for low voltage switchgear and
                           control gear.
        IS : 4064-1978     Air break switches, air break dis-connectors, air
                           break switch disconnectors and fuse combination
                        units for voltage not exceeding 1000 V ac or 1200
                        V dc.
      IS : 4237-1982    General requirements for switchgears and control
                        gears for voltage not exceeding 1000 V
      IS : 6946-1973    Flexible (Pliable) non-metallic        conducts      for
                        electricals installation.
      IS : 8623-1993    Low voltage switch gear and control gear assembly.
      IS : 8828-1996    Electrical accessories – Circuit Breakers for over
                        current protection for household and similar
                        installations.
      IS : 1011-1982    Code of practice for selection, installation and
                        maintenance of switch gear and control gear.
      RDSO Specifi-     Technical specification of flexible Elastomeric
      Cation No.        cables with copper conductors for powered
      SPEC/E-14/01      rolling stock applications.
      (pt. I) Rev. II
      REDSO Spec.       Reliability assurance specification for electronic
      E-16-1 (Rev. A)   components for use in rolling stock.
5 FUNCTIONAL REQUIREMENTS
5.1   The control circuit shall be design to work on 110 V ac, 50 Hz, single
      phase supply derived from 415 V/110V ac 50 Hz. Control transformer.
      Input to control transformer will be fed from :
      i).   In case of EOG coaches : from any two phases of EOG ac.
      Supply.
      ii). In case of self generating AC coaches : from any two phase of
      incoming 3 phase PWM inverter supply or
      iii). In case of SG AC coach having inverter with separate control
      supply : The control panel shall be fed from separate filtered 415 V
      AC PWM supply available for control panel, Through the spare
        terminal available on AC control panel incoming. These connections
        will be made by the coach manufacturer/the user Railways.
5.2     The compressor has to work in conjunction with evaporator unit and
        condenser unit. The wiring sequence is explained here under and as
        per given in RDSO drg. No. SKEL – 4391 Alt. 1 (Sheet 1 to 6).
        i). Condenser fans (2 Nos) will work only when blower fan (1 no.) is
        “ON”.
        ii). Compressor (2 Nos.) will work only when any one condenser fan
        and blower fan are “ON”.
5.3     The compressor should not work beyond specified high and low
        pressures and temperature limits. Pressure and temperature sensors
        shall from the part of the Roof Mounted A/C Package Unit (RMPU)
5.4     The control circuit shall be so designed that change from cooling to
        heating and vice-versa shall be automatic.
5.5     A rotary switch shall b provided to select heating or cooling, manually
        by passing the automatic control as defined in clause 5.4.
5.6     An auxilary contactor shall be provided for control power supply to
        heating/cooling circuits. The coil of the auxilary contactor shall be
        energised through vane relay.
5.7     Following protective devices shall be provided on AC control panel.
5.7.1    Electromegnatic type time delay relay to give time delay in starting
         of compressors for the following purposes shall be provided.
         i). Between starting of two compressors.
         ii). In starting of two compressors when power supply is switched
         “ON” after sudden interruption.
5.7.2    Time delay relays having fixed/variable settings shall be provided
         to give time delay between starting of two compressors of RMPU.
         One relay for first compressor shall have setting of 2 minutes and
         second shall have setting of 2.5 minutes.
5.8 Arrangement shall be made to indicate, the “ON” position of power,
      blower, compressor, condenser fans, heater’s, automode, manual mode
      and cooling/heating mode etc.
5.9 Arrangement should be made to indicate different faults of blower fan
      motor, condenser fan motors, heaters, air loss and tripping of
      compressors on LP or HP etc.
6 CONSTRUCTION
6.1     The control panel shall be enclosed in a cubicle suitable for wall
        mounting. The cubicle shall be made of 20 SWG CECA sheet and
        mounting angles of 14 SWG CRCA sheet. The black plate of the
        housing on which panel board shall be mounted shall be of 14 SWG.
        All switch gear items should be mounted on a separate CRCA sheet
        (panel board) of 14 SWG which is to be fixed with cubicle’s back plate
        with 6 mounting bolts. CRCA sheet used in the control panel shall
        confirm to IS : 513-1994.
6.2.    The control panel cubicle shall have a pair of vertical (each in single
        piece from top to bottom) flap doors. In the upper portion of the left
        hand side door indication lamps and rotary switches etc. shall be
        suitably recessed and covered with toughened glass so that LED of
        indication PCB are visible and also dust entry is avoided. In the lower
        portion of the same door a recessed shall be made so that operating
        knob of the rotary switch “RSW-1” protude outside. The arrangement
        shall be such that dust and water do not enter through recess
        mentioned above. Pilot indication lamps for all the three phases of
        incoming power supply shall be provided in red, Yellow and Blue
        colors above rotary switch “RSW-1”. Locking arrangement shall
        comprise of top and bottom locking rod and lock shall be located in the
        middle of right hand side panel door as shown in the RDSO drawing
        SKEL 4392 Alt. 1. Mounting of control transformer, bus bars, terminal
        blocks, switch gears and protective devices etc. on panel board shall be
        generally as per arrangement shown in RDSO drg. No. SKEL 4392
        Alt. 1
6.3     Two nos. of louvers with wire mesh from inside of size 100 mm x 150
        mm on both side on the panel shall be provided as shown in RDSO
        deg. No. SKEL – 4392 Alt. 1.
6.4     The ovel-all dimensions of the control panel (including all projections
        whatsoever) should not exceed :
        Height      1300 mm + 50 mm brackets on top and bottom for
                    mounting.
        Width       550 mm
        Depth       200 mm
6.4.1      These dimensions are critical and no tolerances are permitted
6.4.2      Control panel housing should be as per RDSO drg. No. SKEL 4392
           Alt. 1.
6.4.3    Care should be taken to achieve a neat & symmetrical layout.
6.5 All steel works shall be given seven tank treatment for anti-rust and
      anti-corrosion and shall be painted with two coats of primer and two
      coats of synthetic stove enamel fire retardant paint as per shade no.
      631 of IS : 5-1994.
6.6 All the equipments fitted in the panel shall be easily accessible
      for replacement/checking.
6.7 All switch gears, protective devices, terminal blocks, bus bar and
      transformer shall be mounted on the panel board rigidly. MCBs and
      terminal blocks can be mounted on Din-Rail till terminal blocks and
      MCBs suitable for panel mounting are developed/available.
6.8 Since the contractor and overload relays are panel mounted.
      The manufacture will make arrangement for additional fixing
      holes also suiting the requirements of contractors and relays of
      other makes specified in the specification so as to ease the
      replacement during maintenance with the approved make other
      than the one fitted on the panel.
6.8.1    Arrangement for mounting of alternative makes of switch gears,
         protective devices, transformers and terminal blocks etc shall be
         made for ease in replacement.
6.9    All the material used in the AC control panel shall be of only makes
       mentioned in the Bill of material as per annexure ‘A” shall be used.
       For any deviation in the make prior approval of RDSO shall be taken.
6.10   Engraved aluminum anodised legend name plates shall be rivetted on
       the control panel, below rotary switches, LEDs, MCBs, contractors,
       overload relays etc for easy identification, Legend plate shall also be
       provided to indicate the operation of the equipment/circuit with the
       help of indication lights. MCBs shall be numbered as per drg. Any
       other arrangement shall have prior approval of purchaser/RDSO.
6.11   The wiring scheme of the A/C control panel shall be as per RDSO
       Drg. No. SKEL 4391 Alt. 1 (1 to 6). Triggering circuit for auto mode
       shall be generally RDSO drg. No. SKEL – 4482. Changes necessary in
       control circuit and wiring for providing electronic thermostats shall
       have prior approval of RDSO.
6.12   All switches, relays, contactors, MCBs and indication light shall be
       adequately rated to render satisfactory service without any undue
       heating or arcing. All protective devices shall be positive in action.
6.13   All power wiring shall be done with flexible elastomeric cable with
       copper conductors confirming to RDSO specification SPEC/E-14/01
         (part-1) : Rev II, Feb 1993. Wiring for indication LEDs will be done
         by PTFE cables of 1.5 sq. mm and 1.0 sq. mm respectively.
6.14     Control wiring shall be routed as far as possible trough covered
         alleys/channels of wire retardant insulating material or through tie rods
         of wire retardant material properly clamped.
6.15     The degree of protection for control panel should be IP23 confirming
         to IS : 2147-1962 with clearance and creepage distances confirming to
         clause 7.1.3 of IS : 13947 : 1993 “Specification for low voltage switch
         gear & control gear.
6.16     All the LEDs alongwith their respective resistances shall be soldered
         on PCB. Color of various LEDs has been indicated on drgs. PCB shall
         be provided with suitable terminal connectors. Internal connection
         from/between LEDs/ resistances/connectors on PCB shall be trough
         tracks and no jumper wires shall be sued on PCB. Inter connection
         between PCB and external wire shall be through suitable male/female
         connector set.
6.17     The cables shall be following colors.
                415 Volts R phase         Red
                             Y Phase      Yellow
                             B Phase      Blue
               110 Volts    Phase        White
                            Return       Black
6.17.1      Terminal clocks suitable to receive stud/pin type connectors shall
            be used. The outgoing/incoming terminal connections shall be
            brought out to adequately rated fire retardant terminal blocks as
            shown in RDSO Drg. No. SKEL 4391 Alt. 1 sheet No. 5. Terminal
            blocks should separated by insulated fibre retardant partitions to
            avoid accidental short circuits. In case partitions are part of the
            individual terminal blocks then provision of separate partitions
            between terminal blocks are not necessary. But partitions at either
            end of the terminal block shall be ensured.
6.17.2      Not more than two wire shall be terminated at one terminal/stud.
6.17.3      Interlocked marking ferrules shall be used for identification of
            wires/cables/terminals. Visibility of the ferrule number shall be
            ensured.
6.17.4      All cable wire leading to a terminal block shall be properly secured,
            clamped before termination.
6.17.5  Terminal lugs shall be crimped and provided with heat shrinkable
        transparent sleeves. Terminal lugs upto 10 sq. mm size shall be of
        insulated type of approved make as Dowells or Klippon.
6.17.6   The body of the A/XC control panel is required to be earthed to
        coach structure at two ends diagonally opposite to each other by
        using braided copper flexible jumpers. For this, two pieces of 35 sq.
        mm and 300 mm long jumpers dully crimped at both ends shall be
        supplied by the supplier. One end of the jumper shall be fixed at the
        panel and other end free.
6.17.7 Power and control cables harness of specified length drawn in steel
        reinforced insulated fire retardant material hose of 50 m to 40 mm
        respectively with the suitable copper ring tongue terminal ends
        shall be supplied by the panel manufacturer. However, fork and pin
        type crimping connection shall be acceptable for MCBs. OLRs,
        Contactors, LEDs indication PCB and HR/CR relays only till
        switch gears suitable for ring type sockets are available.
6.17.8 Control circuit diagram on aluminium plate with anodising of black
        back ground or with silk screen printing should be provided from
        inside on one of the flap doors.
6.17.9 All cables with different voltage grades should be properly
        segregated.
6.17.10 All cables connecting equipments & rotary switches inside the
        cubicle to the PCBs etc. in flap door should be well protected &
        should be covered by PVC spiral.
6.17.11 Sheetstem used in the construction of ac control panel switch gear
        like relays, contactors, MCBs, terminal blocks, hoses, cable alloys,
        cables etc. shall be of fibre retardant materials. No. material shall
        be sued in the construction of control panel i.e. liable to be
        adversely affected by vibration, damps, rotting or growth of molds.
        Use of timber and asbestos is prohibited. Fibre retardant test shall
        be conducted as per Appendix – B. certificate to this effect shall
        also be given by control panel manufacturers with each lot of
        supply.
7 MARKING
         In addition to markings indicated in RDSO drawing SKEL – 4392 Alt.
         1, marking indicating following information shall be made on the right
         hand side wall of the control panel. (below the louvers):
         Make :
      Serial Number
      Month and year of manufacturing
8 TEST AND INSPECTION
8.1   General & safety requirements shall conform to IS : 13947 and
      IS : 8623-1977.
8.1   AC control panel shall be tested for working of its protective relays
      and setting alongwith roof mounted AC package unit conforming to
      RDSO specification No. ELPS/SPEC/AC/03 with amendments no. 1
      & 2.
8.2   The AC control panel shall be subjected to following test at firms
      premises with 514 V ac, 3 phase 50 Hz sinusoical power supply. But
      final clearance for the prototype shall be given after successful
      operation with 415 V ac 3 phase, 50 Hz PWM power supply through
      inverter is available.
      The test are as under :
      i). Visual inspection of control panel including inspection of wiring
      layout and crimping of sockets etc.
      The test shall include visual inspection of control panel, overall
      dimensions and general layout of housing, earthing, color as
      mentioned in the specification.
      ii). Verification of mechanical operation of flap doors mounting etc.
      iii). Vibration and shunting shocks test.
      This test shall be conducted as per IEC : 77.
      iv). Dielectric test.
      Power circuit & control circuit shall be subjected to di-electric test a
      voltage of 2.5 KV ac rms for power circuit & 1.5 KV ac rms for
      control circuit applied for one minutes.
      v). Insulation resistance test
      The insulation resistance of power & control circuit shall be measured
      by 1000 V megger separately. The value of insulation resistance
      should not be less than 100 Meg. Ohm.
      Vi). Checking of protective devices.
      a). Verification of working of all the equipments of AC package units
      in their proper sequence.
      b). Proper operation of all switchgears of control panel creating
      possible fault/isolation conditions.
      TEST
      Prototype                              Acceptance & Routine
      i)., ii), iii), iv), v), & vi)         I) to vi) except iii) on all
      on one no. AC control                  Panels
      Panel
8.3   The manufacturers shall submit a certificate at the time of inspection
      of each lot that all the materials used in the control panels are as per
      specification. Deviations, if any, shall be pointed out and the approval
      of RDSO for the same shall be obtained before offering the lot for the
      inspection.
8.4   Contactor/manufacturer shall manufacturer/develop & test the
      prototype panel after obtaining design approval of RDSO. The
      manufacturer’s internal test results shall be furnished to
      RDSO/Purchaser before offering the panels for inspection.
9 GUARANTEE
      The equipment shall be guaranteed for satisfactory performance for a
      period of 12 months from the date of commissioning or 18 months
      from the date of receipt by the consignee whichever is earlier. Any
      part of the equipment failing or providing unsatisfactory in service due
      to defective design, material or workmanship during guarantee period
      shall be replaced by the supplier free of cost. Manufacturer’s engineers
      and/or technical staff may be called upon by user Railway to attend to
      such problems faults at terminal Railway junctions/carriage
      maintenance depots during the currency of guarantee period.
10 TECHNICAL PARTCULARS
      The tenderer shall furnish the complete set of drawings giving
      operation to maintenance instructions, circuit diagram, layout of
      equipment and wiring diagram etc. in properly bound booklet from in
      triplicate with each panel.
11 TRAINING
      The contactor shall undertake to train, free of cost the supervisors of
      the Indian Railways for operation, maintenance, fault finding, repair of
      offered RMPUs under guidance of skilled engineers, during the first
      year of the service of the RMPUs. The number of supervisor to be
      trained against a contract will be indicated by the accepting authority.
      The wages and allowances of each Railway supervisor nominated for
      training shall be paid by the purchaser. The purchaser shall bear the
      cost of the passage to and from the place of training for railway
      supervisor.
12 SERVICE ENGINEERS
      The successful tenderer shall be required to make available the
      services of his engineer/engineers free of cost to watch performance of
      the equipment in service periodically and also carry necessary repairs
      or replacement under warranty obligations. The necessary spares
      needed for replacement during service be available with the service
      engineers at minimum six of the following important terminal stations
      covering entire Indian Railways network :
      Delhi, Calcutta, Chennai, Mumbai, Secundrabad, Guwahati,
      Gorakhpur, Amritsar, Jammu Tavi and Banglore etc.
13 The manufacturer shall submit following technical details etc. to RDSO
   before offering the prototype unit for scrutiny & approval
      i). Photographs of A/C control panel showing different views clearly
      like locations and mounting details of all protective devices, switch
      gears, rotary switches MCBs time delay relays and cable layout etc.
    ii). Bill of material used in the A/C control panel in similar manner as
    given in Annexure “A” (The make, part No., Cat No. of each item)
    Shall be furnished.
    iii). Test certificates in respect of the following :-
    1.    MCBs               2.        Contactors            3.   Rotary
    switches
    4.    Control Transformer          5.     Overload relays
    1.    Time delay relays.
    iv). Clause wise compliance and non compliance of RDSO
    specification.
    v). Test schedule in detail in respect of tests mentioned in the
    specification including followings :-
    a).   Complete procedure of conducting test.
    b).   Circuit diagrams to be followed for conducting the test.
    c).   List of measuring instruments and their accuracy proposed to be
          used for the tests.
    d).   The data to be recorded in tabular form.
    e).   Recommended current settings for overloads.
    f).   The reference design data with which the observed data will be
          compared for drawing inferences regarding passing/non passing
          of the tests.
    Above test schedule shall be got approved from RDSO before
    commencing the prototype tests.
14 SPECIAL TOOLS
    i). Any special tools, if required for easy operation shall be supplied
    free of cost with the power panel.
    ii). Electrical wiring diagram to RDSO drg. No. SKEL 4391 (Sheet 1
    to 6) shall be engraved on anodized aluminium plate and be rivetted to
    inner side of the door.
15 DEVIATION
    Deviation from any of the clause of this specification shall be clearly
    pointed out. Clause not so commented shall be taken as having met
    with the acceptance of the tenderers and binding on him.
16 GENERAL CONDITIONS
    The contractor shall be bound by all the standard conditions of the
    contract issued by the purchaser/Railway Board.
17 ENCLOSURES :
    1.    Annexure – A (Fill of Quantities).
    2.    RDSO Drg. No. SKEL – 4391 Alt. 1 (From sheet 1 to 6) for
          power circuit and control schematics.
    3.    RDSO drg. No. SKEL – 4392 Alt. 1 for AC control panel.
    4.    Triggering circuit RDSO drg. No. SKEL – 4482.
                                                      ANNEXURE A
                                                (CLAUSE 6.9 & 13.0)
                       (Spec. No. : ELPS/SPEC/AC/04) Rev. 2) Aug., 99)
BILL OF MATERIALS REQUIRED FOR AC CONTROL PANEL OF
ROOF
MOUNTED AC PACKAGE UNIT WITH 110 V. AC CONTROL.
S.No.  Control Description       Make      QTY.
       Circuit                                  PER
       Code                                     Control
          Ref.                                                    Panel
1.      RSW – 1    Rotary switch 63A ON/OFF,        KAYCEE
01
                   440 V., 3 pole 4 position at     SALZER
                   90m deg. Each suitable for
                   base mounting.
2.      RSW – 2    Rotary switch 16 AMP.            KAYCEE
01
                   ON/OFF, 230 V., AC               SALZER
                  4 position, at 90 deg.
                  each ON/OFF switch.
3.      RSW – 3   Rotary switch 16 AMP.             KAYCEE
01
                  230 V., AC, 3 pole, with          SALZER
                  off, 4 position at 90 deg. each
4.      RSW – 4   Rotary switch 6/8 AMP.            KAYCEE
        02
           &      2 pole 3 way without, off,              SALZER (One
each)
        RSW - 5   3 position at 60 deg. each.
5.      C1,C2           AC T.P. contractor 16 A           BCH
        04
        C3,C6             AC3 duty with 110 V AC coil         SIMENS
                   Suitable for ring type lugs              ABB
                   and panel mounting
6.    C4,C5        AC T.P. contractor 30 A            BCH            02
                   AC8b duty with 110 V AC coil       SIMENS
                   suitable for ring type lugs         ABB
                   and panel mounting.
7.     AC1         AC D.P. contractor 12 A with       BCH            01
                   110 V. AC coil suitable for
                   ring type lugs and panel
                   mounting.
Note : Duty class (utilisation category) may be relaxed depending upon
availability of contactor AC8b . Utilisation category with manual agreement
between RDSO/purchaser and manufacturer.
8.    OL 1        Overload relay suitable for                BCH
      01
                ring type lug and base mounting     L&T
                of rating depending upon blower
                motor rating.
9.    OL 2,OL 3 Overload relay of rating depending BCH              02
                on rating of cond. Motors suitable L&T
                for ring type lugs and base
                mounting
10.   OL 4,OL 5    Overload relay of rating suitable         BCH
      02
                  for compressor’s rating suitable      L&T
                  for ring type lugs and mounting
11.   MCB-MAINS      MCB (TP) 63 A                           MDS
      01
12.   MCB 1             MCB (TP) 6A                                MDS
          03
      MCB2 &      ‘G’ curve
      MCB3
13    MCB4 &      MCB (TP) 32A                         MDS          02
      MCB5            ‘G’ curve
14.   MCB6            MCB (TP) 16A                           MDS
      01
                  ‘G’ curve or with
                  ‘K’ curve
15.   MCB7              MCB (TP) 2A                                MDS
      01
                  G’ curve or with
                  ‘K’ curve
16.   MCB8              MCB (DP) 2A                                MDS
      01
                  G’ curve or with
                  ‘K’ curve
17.   MCB9              MCB (DP) 4A                                MDS
      01
                  G’ curve or with
                    ‘K’ curve
18.   TDR1 &        Time delay relay               BCH       02
      TDR2          (Electromagnetic/pneumatic)
                    Electronic (One each)
                    With 110 V AC coil 1 No & 1 NC
                    Setting TDR1-2 min.
                            TDR2-2.5 min.
19.   TR             Control supply transformer    GURU/DELTA
      01
                     natural air cooled 400 VA,                 LOGISTAT
                     415/110 V, 50 Hz.
                     Class 155.
20 Indication       Pilot indications complete               SIEMENS
      03
       Lamps         with lamps.                       L&T
21. T – 1            Terminal blocks (box spanner      ELMEX
      21
       to T – 21     operated) suitable for 2.5-6       CONNECTWEL
       (Power)       sq. mm cable as per RDSO Drg.
                     No. SKEL 4391 Alt. 1 Sheet 5
22. T – 26      Terminal blocks (Screw driver           ELMEX
      29
       to T -54      operated) suitable for 1.5-6       CONNECTWELL
      (Control)      sq. mm cable as per RDSO Drg.
                     No. SKEL 4391 Alt.1 Sheet 5
23.   TR             Terminal block                      ELMEX
03
      TY             (Box spanner operated)              CONNECTWELL
      TB             suitable for 16 sq. mm cable.
24.   TC – 1         Terminal block                      ELMEX
02
      TC - 2         (Box spanner operated)
      CONNECTWELL
              suitable for 1.5 sq. mm cable
25.   Bus Bar 1. Copper bus bar of size                    conforming
01
       &              5 x 20 mm covered with heat      to IS :1897
      Support         shrinkable PVC sleeve and         (Latest)
                     colour Coded to phases as regd.
                    * (See note)
                    2. Busbar LT insulator (DMC)         Equipment
06
                                                  to Everest
26.   PCB           Indicating LEDs               as per control      01
                                                  schematic
                                                   circuit.
27.   Connector      37 pin connector (epoxy              SAMEER
      between      filled) with pin configuration or
      panel &       as per RDSO Drg. No. SKEL Amphetronics
      package       Alt. 1 Sheet 5                or Allied
      Unit
            Note : A test certificate should be furnished by the manufacturer
            that copper used for busbar conforms to IS:1897 (latest)
28. ---     2.5 metre long power and control            as per       01 set
            cable harness in two steel reinforced        Drg.
            insulated fire retardant material
            hoses of size 50 mm and 40 mm.
            Respectively with suitable Copper
            Ring tongue terminal ends
            (insulated with metal reinforcement)
            on both ends.
29. HR/CR DC relay with high resistance coil             O.E.N
02 set
          for cooling/heating selection with
          2 No & 2 NC contacts suitable for
          operating an DC voltage rectified
          from 110 V through full wave
          bridge rectifier.
                               *********************
                                                   ANNEXUER – B
                                                    ( Sheet – 1)
                                                   (Clause 6.17.11)
                   FIRE RETARDANT TEST
One half of the body of specimen shall be subjected to the luminous
batswing frame , preferably supplied be a burner burner. The
specimen shall be held with the flat side up at an angle of 45 deg. To
the horizontal as shown in the fig. The flame shall be of 25 mm in
width across the tips.
The flame shall be applied to the specimen at the lower end for 30
seconds and removed for 30 seconds and then applied again to the
same end for the second period of 30 seconds and then removed again.
This test shall be carried out with both the surfaces facing the flame.
Should the specimen get ignited, shall not continue to burn for more
than 50 seconds after the flame has been finally removed.