Manpower Histogram

The document is a manpower histogram showing staffing levels for a construction project over 16 months. It shows: - Two main categories of workers: direct contractors and indirect staff from the main contractor and subcontractors. - Peak staffing of 120 workers in month 5, driven mainly by direct contractors. - Staffing declines gradually after month 5 but remains above 80 workers for most of the project duration. - The project is for processing sludge from a wastewater treatment plant over 16 months.

Uploaded by

MDhana Sekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
284 views1 page

Manpower Histogram

The document is a manpower histogram showing staffing levels for a construction project over 16 months. It shows: - Two main categories of workers: direct contractors and indirect staff from the main contractor and subcontractors. - Peak staffing of 120 workers in month 5, driven mainly by direct contractors. - Staffing declines gradually after month 5 but remains above 80 workers for most of the project duration. - The project is for processing sludge from a wastewater treatment plant over 16 months.

Uploaded by

MDhana Sekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Manpower Histogram

120 120%

SubContractor & Vendors Indirect


TOCO Indirect
SubContractor Direct
100 100%

TOCO Direct 2

S-Curve
5 19

80 14
80%

2 2
3
12
16
18
Manpower

13

60 2 60%

12
3 9
16
7 47
2
40 40 12
40%

14
67
32
7
50 50
20 17 20%

33 12
25
20
13 12 11
3 3 3 3 3 3 1 0%
1

10

11

12

13

14

15

16
Months

Project Name : EPCC Contract for Processing of Sludge from WWTP in DCU at SR2
Location : Sohar
Client : OQ Refinery
TITLE:

MANPOWER HISTOGRAM

THE OMAN CONSTRUCTION COMPANY Prepared by:


P.O.BOX 142, MUSCAT, OMAN MW
Ph: +968 24590355 Fax: +968 24591813 Approved:
Web Site: www.interserve.com/toco
00 ISSUED FOR PROPOSAL 15-May-18 TOCO Unauthorized reproduction of all or part of the information given on this Sheet
Rev. No. Detail Date By sheet is prohibited. All rights are reserved by TOCO. 1 OF 1

You might also like