Piping
Date :
Activity
Acceptance Criteria,
Code & Standard
1.0
MATERIAL
RECEIVING &
STORAGE
INSPECTION
1.1
ASME B-31.3
MATERIAL TAKE OFF
MATERIAL CERTIFICATE
1.2
APPROVED PROCEDURE
2.0
WELDING
QUALIFICATION
2.1
ASME B-31.3
ASME IX
APPROVED MS
2.2
PROJECT SPECIFICATION
ASME-IX
APPROVED WPS
APPROVED MS
2.3
ASME-IX
PROJECT SPEC.
APPROVED MS
DISCIPLINE :
Piping
Date :
Activity
3.0
FABRICATION
OF SPOOLS
H - Hold Point
DOCUMENT
Formats/Ch
Acceptance Criteria,
Code & Standard
3.1
GENERAL PRECTICES
APPROVED PROCEDURE
3.2
CONFORMATION OF MATERIAL
APPROVED DRAWINGS
MATERIAL TAKE OFF
Document /
Format
List
4.0
JOINT
WELDING AND
REPAIR
3.3
PROJECT SPECIFICATION
WPS AND DRAWINGS
3.4
ISOMETRIC DRAWINS
4.1
INSPECTION OF WELDING
CONSUMABLE
APPROVED WPS
4.2
4.3
GENERAL PRECTICE
4.4
4.5
4.6
AS APPROVED BY Format
Procedure
H - Hold Point
DISCIPLINE :
Piping
Date :
Activity
No
5.0
INSPECTION
OF
FABRICATED
ITEMS AND
RELEASED
FOR
TRANSPORTAT
ION
D
Acceptance Criteria,
Code & Standard
Document / Record
Formats/Check List
C
C
5.1
PROJECT DRAWINGS
5.2
RELEASE NOTE
5.3
AS APPROVED BY
ENGINEER
5.4
AS APPROVED BY
ENGINEER
6.1
ACCEPTANCE OF PIPE/VALVE
SUPPORTS INSTALLATION
PROJECT SPECIFICATION
APPROVED DRAWINGS
ASME IX OR AWS D1.1
6.0
INSTALLATION
OF PIPE WORK
Definitions of Inspection & Test Plan Symbols :
H - Hold Point
DISCIPLINE :
Piping
Date :
Activity
Acceptance Criteria,
Docume
Check Points
No
7.0
PIPE WORK PREHYDROSTATIC TEST
6.2
6.3
6.4
WELDING CONTROL
WPS
6.5
APPROVED DRAWINGS
WPS
APPROVED DRAWINGS
PROJECT SPECIFICATION
ASME B31.3
7.1
ASME B31.3
APPROVED PROCEDURE
7.2
ASME B31.3
APPROVED MS
7.3
APPROVED PROCEDURE
H - Hold Point
Formats
DISCIPLINE :
Piping
Date :
Activity
7.4
Documen
ASME B31.3
APPROVED MS
APPROVED
PROCEDURE
APPROVED MS
APPROVED
PROCEDURE
7.5
7.6
PLACEMENT OF BLINDS VENTS,
PRESSURE GAUGES AND PRESSURE
RELIEF VALVES, etc.
8.1
8.0
HYDROSTATI
C TESTING
Acceptance Criteria,
Code & Standard
Document / Record
Formats/Check List
APPROVED MS
APPROVED
PROCEDURE
ASME B31.3
APPROVED MS
PROJECT
SPECIFICATION
8.2
PRESSURIZING SYSTEM
ASME B 31.3
APPROVED MS
PROJECT
SPECIFICATION
H - Hold Point
Construc
Contract
DISCIPLINE :
Piping
Date :
Activity
10.0
ABOVE GROUND
PIPE WORK
PAINTING
Acceptance Criteria,
Record
Check Points
Formats/Check List
10.1
10.2
SURFACE PREPARATION
APPROVED
PROCEDURE
SSPC-10
APPROVED MS
10.3
PAINT APPLICATION
APPROVED
PROCEDURE
10.4
H - Hold Point
DISCIPLINE :
Piping
Date :
Activity
11.0
UNDER GROUND
JOINT COATING
Do
Acceptance Criteria,
Code & Standard
Record
Formats/Check List
Co
C
11.1
11.2
SURFACE PREPARATION
APPROVED MS
APPROVED MS
APPROVED
PROCEDURE
SSPC-10
APPROVED MS
11.3
11.4
11.5
COATING APPLICATION
HOLIDAY TESTING
MANUFACTURER DATA
APPROVED MS
APPROVED
PROCEDURE
MANUFACTURER DATA
APPROVED MS
APPROVED
PROCEDURE
MANUFACTURER DATA
APPROVED
PROCEDURE
H - Hold Point
DISCIPLINE :
Piping
Date :
Activity
12.0
BACKFILLING
Acceptance Criteria,
Record
Formats/Check List
12.1
APPROVED MS
12.2
INSPECTION OF TRENCHES
APPROVED MS
12.3
INSPECTION OF BACKFILLING
APPROVED MS
H - Hold Point