LOSS PREVENTION DEPARTMENT
Work Permit ‘2 ::¢" Examination
Student Name:
Barlge No.:
Department Name: - fgeeesecuseeeca Test Date:
Organtsation Code: ___. Sse Test Code:
ans Questions
t ‘What type of work permits required to erect scaffolding to wark on ges ine ing plant?
‘A. "No work permit is required 2
B.HotWotk Permit
©. Confined Space Entry Permt
(D>) Cold Work Perit
2 Before hot work starts, sewers and drains shal be covered with a fresesistant cover if hey are lcaled within
75 fect #
85 foot
C.. Tofeet
D. 125 feet
What must be done before Issuing work permits that affect other operating areas?
B Hewintiergind
CS Thstaaer amt aan tecsnoroniy we chralusentinectarimaucestesspentinnseficse
E. AMostiwnemncrte eieonay e terara :
D. _Noweparing els mst be wed
4 [At Work Permits required for:
A.” allconfined space entry oftanksivessels
8, alrelesses of hazerdous meteral
(C.) allwork in restricted areas involving ignition sources
D. allwork done inresticted areas
5 ‘When locking out and tagging equipment:
‘A. there is no reason to record on the teg the name, locaton, or number ofthe equlpment beng looked out
“B. _ the Issuer should record on the tag which equipment is locked out but tere Is no need to record its
location
C. there is no reason to record the name of the equipment, but Its number should be recorded onthe tag
(0) _ the Issuer should record on the tag which equipment is locked out and where the equipments located
6 Ia work pernit is issued without a joint site Inspection, the Issuer shalt
advise Loss Prevention immediately
2 emn Cock Peery
explain why on the permit
D. advise his supervisor
"Work Permit ser RT-S Poge 1 ofQuestion Questions
No.
#®
10.
2 12.
13.
14.
J. joint site Inspection is required, It mast be done:
Ca2 by the permit receiver and Issuet or his designated representative
B. by the permit receiver and his supervisor
C.__ inthe office ifthe issuer end receiver agree
D. by the permit issuer and his supervisor
Wind direction mustbe considered during release work because:
‘Ac because work must alveys take place downwind ofthe relense
(BD ‘flammable gates may be blown towards an lgition source
E._tems may be blown to the site making the work ares unt
D.__ dust particles may be blown into pened ins or vessels
tt newhazaids develop ata jobsite thet were nat discussed on the work permit, therecelver shoud:
‘A. continue to viork until a new work permit can be Issued
°B.? stop the job end inform the issuer
~C. continue to work but work safely
D. continue with the work until he
instructed by the Issuerto do otherwise
-The oxygen contént for work without breathing apparatus must be in the range:
‘A, 99-100%
B. 10-20%
Jo. 20-21%
@> 9-10%
r
‘the gas test resus show 02 = 20%, LEL = 60%, H2S = 8 ppm. Under the Work Perit System procedure, =
Wha! action must be done by the issuer?
wh. Require the receiver o use a bresthing apparatus (Scott Arr Pak)
B._Only.a Cold Work permit coud be issued
CG? Nowork permit should be Issued
D. Confined Space and Cold Work permits could be issued
|Whet type of permits) ere require to build scaffolding with hend tools inside of tanklvessel?
A) Cold Work end Confined Space Entry
B. Release and Cold Work
©. Confined Space Entry and Hot Work
D. Hot and Cold Werk
Whetis the reason forthe ‘Adsitonal Precautions’ section on the werk pei?
‘A. sothet additional wrk locations can be Histes
B___sothat additional tems of equipment can be listed
forthe over oa spec salty preeauone an reuremene
6” for the issuer to wre Work Safely or’Be Careful
‘A. workman [s permitied to enter an etmosphere containing conygen without wearing breshirg
apparatus.
A. 16%
JB. 21%
cc. 12%
)
Works Permit Issuer RT=3 Pug 20f4‘Question Questions
No.
1/18. The Release of Hezarous Linus and Gases pom irequred
A. only after a substance is released
B. only forthe releese of crude produets
C. to document the release of hazardous materials
©? for intentional or potential releases of flammeble or hazardous materials
16. __Wibich permit is required to enter an underground valve box which greater than 4 feat deep?
{a2 Confined Space Entry
B. HotWork
©. Cold Work
D. Release of Hazardous Liquids of Gases.
i 3
47, Who must sign work permits they wil be used formore than @ hours and upto 30 daye?
‘A. Inspection Superintendent and Loss Prevention Supeintendent
8. Securty Operatons Superintendent and Loss Preventon Superiendent
Maintenance Manager end Loss Prevention Manager
Operations Division Head and Malnienance Dison Head
16, The Conines Space Entry permit requires that
z A. only hot work can'be done
GB) the vessels are properly Isolated
. _non-sparking tole be used
D. only cold work can bo performed
7 18 Thoreceiver shout stop work
A. recelvers cannot stop work without the fsvers perission
(B)) he feels the concitons atthe work te are not ste
T. the job is complete
D. only he smells gas
20. What precautions shouldbe taken when suing @ Ht Work Permit?
a A. get countersignature by e manager
get permission from your supervisor
cover sewers/crains, provide re extngusher and take gos tests
D. pet edvance naticeton from Loss Prevenion
21. Which ofthe folowing resus low Confined Space Entry thou breathing epparatusiSCBA?
[Jeb tte 28 Spm, oygen 20%
B. LEL- 0%, H2S-@ ppm, oxygen 21%
LEL- 0%, H2S - 100 pam, oxygen -20%
DO) LEL-B0%,H2S-0 ppm, oxygen-21%
qe?
F 22. Awork permit may be extended for one (1) adcitional operational shift,
only cold work is being done
the work is almost complete
the new on-coming issuer and receiver agree”
ail hot work has been completed
. Work Permit Iseuer RT-3 Pegi3ofiQuestion Questions
No.
2a. Whero are werk perms requtd?
4, imrcravin we
LB Hrestited wees
©. alfonood eras
© ShSnod anes seas
24. Werk permits must be closed:
‘A. at the beginning of the next work shift
_-B-? by the signatures ofthe issuer and receiver es soon as work is completed