0% found this document useful (0 votes)
2K views1 page

Certificate of Completion

The document is a certificate of completion for a project installing intercoms and doorbells. It provides details of the project such as the contractor, installation dates, total costs, and certification that the installation was completed according to the issued permit. The contractor and authorized representative signed to accept the completed project.

Uploaded by

Taoi Motto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Certificate of Completion

The document is a certificate of completion for a project installing intercoms and doorbells. It provides details of the project such as the contractor, installation dates, total costs, and certification that the installation was completed according to the issued permit. The contractor and authorized representative signed to accept the completed project.

Uploaded by

Taoi Motto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Certificate of Completion

Project Name:
Installation of Intercoms and Doorbells
Contractor:
Home Security and Surveillance CCTV Installation Services

Begin Installation date : ____________


Substantial complete date : ____________
No. of days completed : ____________
Completion date : ____________

Total amount vat excluded : 414,886.64


3% vat : 12,831.54
Total amount vat inlcueded : 427,718

I, the undersigned, certify that I am authorized to sign for the claimant: that I
here by affirm, to the best of my knowledge and belief on inspection,
observation, testing of the cabling and units’ installation and upon the report
submitted by others, that this INSTALLATION OF INTERCOMS AND DOORBELLS is
complete and operable. The cabling and installation of new intercoms and
doorbells is complete in accordance of the issued permit. The warranty of the
project started on ____________ and lapsed on _________. Guarantees for
work and products shall be as stated to the contract specification and per
manufacturer’s warranty.

Contractor’s signature: ____________________________ date: _____________

Project Acceptance
Authorized Representative: _________________________date: _____________

Registered office: Lower Jasmin Payatas A. Quezon City, 1900


Phones: 09652634574, 09121763720
+02-8-3308035
Email: ljgolve14@gmail.com, norbertogolve@yahoo.com.ph Messenger : ljbechaydagolve

You might also like