ANNEX-IX. POWER TRANSFORMER NO-LOAD AND FULL LOAD LOSS TABLE (S/S & DRPC form)
ANNEX-XI. SUMMARY OF PROPOSED SUBSTATION AUTOMATION SYSTEMS EQUIPMENT (S/S & DRPC form)
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Nos.
# Key Personnel Remarks
Required
TP-I-1
ITB - Annexure II - 2
TECHNICAL PROPOSAL ANNEXURE - II
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-II-1
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-III-1
ITB - Annexure IV - 4
TECHNICAL PROPOSAL ANNEXURE - IV
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
We hereby confirm that all the relevant terms and conditions specified in Schedule "A", General,
Special Terms and Conditions of the Proforma Contract, and all the relevant clauses specified in
the Scope of Work and Technical Specifications (PTS-21WR351) SOW/TS shall be included in
corresponding Purchase Order(s) to be issued to the Equipment Manufacturer(s) or Supplier(s).
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-IV-1
ITB - Annexure V - 5
TECHNICAL PROPOSAL ANNEXURE - V
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
GENERAL COMPLIANCE STATEMENT
Sir
This Technical Proposal includes all the work and services required to complete the Project.
Having been properly represented during the Job Explanation Meeting and having investigated the WORK SITE, and examined in
their entirety the Scope of Work and Technical Specifications, the Proforma Contract and all the documents referred to therein,
and all the instructions to bidders, the undersigned offers to design, engineer, procure and deliver all equipment and materials
to the WORK SITE, construct, install, test and commission the above project in accordance with the above documents and agree
to adhere to all terms and conditions of the Proforma Contract.
The undersigned also undertake to maintain confidentiality of all correspondence with COMPANY, both in pre-award and post-
award phases of the contract, and no correspondence of any kind will be relayed to a third party without the express permission
of the COMPANY in writing.
Any deviations or modifications to the Scope of Work and Technical Specifications or to the Proforma Contract, submitted by the
bidder as terms and conditions either in the technical bid proposal or commercial proposal won’t be considered as valid, unless
the same clearly brought to the notice of SEC in proper format, accepted by SEC and clear written approval is given in SEC
comments.
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-V-1
ITB - Annexure I - 6
ANNEXURE - VI-A Page 1 of 9
RFX NO. – REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1) 250MVA, 380Kv TRANSFORMER FOR HVP, 380kV
BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
A. SUBSTATION & DRPC EQPT/MATL.
1 Power Transformer
380/230kV
230/69kV
115/13.8kV
2 Shunt Reactor
3 Circuit Breaker
380kV
230kV
132kV or 115kV or 110kV
4 GIS Equipment
380kV
230kV
132kV or 115kV or 110kV
5 CCVT/CVT/VT
380kV
230kV
132kV or 115kV or 110kV
6 Free Standing Current Transformer
380kV
230kV
132kV or 115kV or 110kV
7 Relay & Control Panels
8 Metalclad Switchgear
34.5kV
13.8kV
9 AC / DC Disconnect Switches
380kV
230kV
132kV or 115kV or 110kV
10 Converter Transformer
11 Auxiliary Service Transformers
12 Smoothing Reactors
13 Air-core Reactors
14 Capacitor Banks
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
15 Filter Bank
16 Thyristor Valves
17 Thyristor Cooling System
18 AC/DCLowVoltageAuxiliaryService Equipment
19 DC current sensors , voltage dividers
20 Surge Arrester
360kV
230kV
132kV or 115kV or 110kV
21 AC / DC Station Post Insulators
380kV
230kV
132kV or 115kV or 110kV
22 Wall Bushing
380kV
230kV
132kV or 115kV or 110kV
23 Battery Charger
24 Batteries
25 Annunciator System
26 Filter Resistors
27 Surge Capacitors
28 AC/DC Bus bar conductors
29 Fire Protection & Signalling System
30 XLPE OR LPOF U/G Cable
380kV
230kV
132kV or 115kV or 110kV
MV Cables
LV Cables
31 Fiber Optic Terminal Equipment
Low Density
SDH
32 SCADA RTU
33 Dig. Trans. Fault Recorder
34 Sequence of Event Recorder
B. UNDERGROUND Transmission Line MATERIAL
1 XLPE or LPOF U/G Cable
380kV
230kV
132kV or 115kV or 110kV
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
2 Non-metallic Fiber Optic Cable
3 Pilot Cable, 19 pairs
4 Link Box for U/G Power Cable
5 Sheath Voltage Limiter
C O/H TRANSMISSION LINE EQUIP/MATERIAL
1 Overhead Line Conductor
2 Overhead Ground Wire
3 Tubular Steel Pole
4 Lattice Steel Structure
5 Wood Pole
6 Disconnect Switch
380kV
230kV
132kV or 115kV or 110kV
7 Line Post Insulator
380kV
230kV
132kV or 115kV or 110kV
8 Suspension Insulator
380kV
230kV
132kV or 115kV or 110kV
9 Composite Overhead Optical Fiber Ground Wire(OPGW)
10 Fiber Optic Joint Box
11 Fiber Optic Terminal Equipment
Low Density
SDH
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO. 4
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
12 Relay & Control Panel
13 Feeder Protection
a. Distance Relay
Set 1(21P)
Set 2(21S)
b. Directional Comparison Earth
Fault Relay
Set 1(67NP)
Set 2(67NS)
c. Longitudinal/Pilot Wire
Differential Relay
Set 1(87LP)
Set 2(87LS)
d. Back-up Inverse Time
Overcurrent Relay with
Instantaneous Unit
Phase (50/51)
Neutral(50/51N)
e. Back-up Directional Overcur-
rent Relay with Instantaneous
Unit
Phase(50/51)
Neutral(67N)
f. Synchrocheck Relay(25)
g. Auto Reclosing Relay(79)
h. PT Fuse Failure Relay
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
14 Power Transformer Protection
a. OLTC Control Panel
b. Differential Relay (87T)
c. Restricted Earth Fault Relay
HV Side (87REF-HV)
LV Side (87REF-HV)
d. Back-up HV Side Overcurrent
Relay with or without Inst. Unit
Phase (50/51)
Neutral (50/51N)
Ground (50/51G)
e. Back-up Secondary side
Directional Overcurrent Relay
with or without Inst. Unit
Phase (67)
Neutral (67G)
f. Back-up LV Side Neutral
Overcurrent Relay with or
without Instantaneous Unit
g. Tertiary Winding Inverse Time
Overcurrent Relay with or
without Instantaneous Unit
(50/51TW)
h HV side Over Fluxing Relay (99T)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
15 Grounding Transformer
Protection
a. Restricted Earth Fault Relay
(87GT)
b. Inverse Time Overcurrent Relay
with/without Intantaneous Unit
Phase(50/51GT)
Neutral(50/51GGT)
16 Station Service Transformer
Protection
a. Inverse Time Overcurrent Relay
with Instantaneous Unit(50/51)
17 Bus Bar Protection
a. Bus Bar Differential Relay(87B)
b. Bus Bar Differential Check
Relay(87B)
c. CT Open Circuit Supervision Relay
18 Bus Sectionalizing and/or Bus
Coupler Breaker Protection
a. Inverse Time Overcurrent Relay
with or without Instantaneous
Unit
Phase (51BT)
Neutral (51NBT)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
19 Breaker and Protection Circuit Failure Supervision
a. Breaker Failure Relay(50BF)
b. DC Supervision Relay
Set 1
Set 2
c. Trip Circuit Supervision Relay
Set 1
Set 2
d. Trip Coil Supervision Relay
Set 1
Set 2
20 Reactor Protection
a. Differential Relay
b. Restricted Earth Fault Relay
c. Inverse Time Overcurrent
Relay with Instantaneous Unit
Phase(50/51)
Neutral(50/51N)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
21 Capacitor Bank Protection
a. Harmonic Desensitized
Instantaneous Overcurrent
Relay
Phase Set 1 (50P)
Phase Set 2 (50S)
Neutral Set 1(50NP)
Neutral Set 2 (50NS)
b. Short Time Overcurrent Relay
Phase Set 1 (51P)
Phase Set 2 (51S)
Neutral Set 1 (51NP)
Neutral Set 2 (51NS)
c. Overcurrent Relay with
Harmonic Filter for Mid-point
Unbalance
Set 1 (59P)
Set 2 (59S)
d. For Neutral Point Unbalance
Set 1 (59NP)
Set 2 (59NS)
e. Bus Over Voltage Relays
Set 1 (59BP)
Set 2 (59BS)
f. Bus Under Voltage Relay
Set 1 (27BP)
Set 2 (27BS)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
22 Protection Signalling/ Communication Interface
Equipment
a. For Distance Protection
b. For Pilot Wire Differential
Protection
c. Breaker Failure Scheme
d. For Longitudinal Differential
Protection
23 Other Relays
a. Under frequency Relay(81)
b. Lockout Relay(86)
c. Timers(62)
d. Tripping Relay(94)
e. Tripping & Lockout Relay
Supervision
f. DC Supply Supervision
Relay(74)
g. Test Switches
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
A. SUBSTATION & DRPC EQPT/MATL.
1 Power Transformer
380/230kV
230/69kV
115/13.8kV
2 Shunt Reactor
3 Circuit Breaker
380kV
230kV
132kV or 115kV or 110kV
4 GIS Equipment
380kV
230kV
132kV or 115kV or 110kV
5 CCVT/CVT/VT
380kV
230kV
132kV or 115kV or 110kV
6 Free Standing Current Transformer
380kV
230kV
132kV or 115kV or 110kV
7 Relay & Control Panels
8 Metalclad Switchgear
34.5kV
13.8kV
9 AC / DC Disconnect Switches
380kV
230kV
132kV or 115kV or 110kV
10 Converter Transformer
11 Auxiliary Service Transformers
12 Smoothing Reactors
13 Air-core Reactors
14 Capacitor Banks
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
15 Filter Bank
16 Thyristor Valves
17 Thyristor Cooling System
18 AC/DCLowVoltageAuxiliaryService Equipment
19 DC current sensors , voltage dividers
20 Surge Arrester
360kV
230kV
132kV or 115kV or 110kV
21 AC / DC Station Post Insulators
380kV
230kV
132kV or 115kV or 110kV
22 Wall Bushing
380kV
230kV
132kV or 115kV or 110kV
23 Battery Charger
24 Batteries
25 Annunciator System
26 Filter Resistors
27 Surge Capacitors
28 AC/DC Bus bar conductors
29 Fire Protection & Signalling System
30 XLPE OR LPOF U/G Cable
380kV
230kV
132kV or 115kV or 110kV
MV Cables
LV Cables
31 Fiber Optic Terminal Equipment
Low Density
SDH
32 SCADA RTU
33 Dig. Trans. Fault Recorder
34 Sequence of Event Recorder
B. UNDERGROUND Transmission Line MATERIAL
1 XLPE or LPOF U/G Cable
380kV
230kV
132kV or 115kV or 110kV
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
2 Non-metallic Fiber Optic Cable
3 Pilot Cable, 19 pairs
4 Link Box for U/G Power Cable
5 Sheath Voltage Limiter
C O/H TRANSMISSION LINE EQUIP/MATERIAL
1 Overhead Line Conductor
2 Overhead Ground Wire
3 Tubular Steel Pole
4 Lattice Steel Structure
5 Wood Pole
6 Disconnect Switch
380kV
230kV
132kV or 115kV or 110kV
7 Line Post Insulator
380kV
230kV
132kV or 115kV or 110kV
8 Suspension Insulator
380kV
230kV
132kV or 115kV or 110kV
9 Composite Overhead Optical Fiber Ground Wire(OPGW)
10 Fiber Optic Joint Box
11 Fiber Optic Terminal Equipment
Low Density
SDH
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
12 Relay & Control Panel
13 Feeder Protection
a. Distance Relay
Set 1(21P)
Set 2(21S)
b. Directional Comparison Earth
Fault Relay
Set 1(67NP)
Set 2(67NS)
c. Longitudinal/Pilot Wire
Differential Relay
Set 1(87LP)
Set 2(87LS)
d. Back-up Inverse Time
Overcurrent Relay with
Instantaneous Unit
Phase (50/51)
Neutral(50/51N)
e. Back-up Directional Overcur-
rent Relay with Instantaneous
Unit
Phase(50/51)
Neutral(67N)
f. Synchrocheck Relay(25)
g. Auto Reclosing Relay(79)
h. PT Fuse Failure Relay
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
14 Power Transformer Protection
a. OLTC Control Panel
b. Differential Relay (87T)
c. Restricted Earth Fault Relay
HV Side (87REF-HV)
LV Side (87REF-HV)
d. Back-up HV Side Overcurrent
Relay with or without Inst. Unit
Phase (50/51)
Neutral (50/51N)
Ground (50/51G)
e. Back-up Secondary side
Directional Overcurrent Relay
with or without Inst. Unit
Phase (67)
Neutral (67G)
f. Back-up LV Side Neutral
Overcurrent Relay with or
without Instantaneous Unit
g. Tertiary Winding Inverse Time
Overcurrent Relay with or
without Instantaneous Unit
(50/51TW)
h HV side Over Fluxing Relay (99T)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
15 Grounding Transformer
Protection
a. Restricted Earth Fault Relay
(87GT)
b. Inverse Time Overcurrent Relay
with/without Intantaneous Unit
Phase(50/51GT)
Neutral(50/51GGT)
16 Station Service Transformer
Protection
a. Inverse Time Overcurrent Relay
with Instantaneous Unit(50/51)
17 Bus Bar Protection
a. Bus Bar Differential Relay(87B)
b. Bus Bar Differential Check
Relay(87B)
c. CT Open Circuit Supervision Relay
18 Bus Sectionalizing and/or Bus
Coupler Breaker Protection
a. Inverse Time Overcurrent Relay
with or without Instantaneous
Unit
Phase (51BT)
Neutral (51NBT)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
19 Breaker and Protection Circuit Failure Supervision
a. Breaker Failure Relay(50BF)
b. DC Supervision Relay
Set 1
Set 2
c. Trip Circuit Supervision Relay
Set 1
Set 2
d. Trip Coil Supervision Relay
Set 1
Set 2
20 Reactor Protection
a. Differential Relay
b. Restricted Earth Fault Relay
c. Inverse Time Overcurrent
Relay with Instantaneous Unit
Phase(50/51)
Neutral(50/51N)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
21 Capacitor Bank Protection
a. Harmonic Desensitized
Instantaneous Overcurrent
Relay
Phase Set 1 (50P)
Phase Set 2 (50S)
Neutral Set 1(50NP)
Neutral Set 2 (50NS)
b. Short Time Overcurrent Relay
Phase Set 1 (51P)
Phase Set 2 (51S)
Neutral Set 1 (51NP)
Neutral Set 2 (51NS)
c. Overcurrent Relay with
Harmonic Filter for Mid-point
Unbalance
Set 1 (59P)
Set 2 (59S)
d. For Neutral Point Unbalance
Set 1 (59NP)
Set 2 (59NS)
e. Bus Over Voltage Relays
Set 1 (59BP)
Set 2 (59BS)
f. Bus Under Voltage Relay
Set 1 (27BP)
Set 2 (27BS)
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
RFX NO.
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
01-TMSS-01 TMSS/SMSS
Name of Manufacturer, Deviations Manufacturer's Tech. Info. In Section
Item No. Description of Equipment and Materials Compliance Compliance Data Schedules Type Test Reports
Type/Model & Country of Origin (YES/NO) Responsibility Statement #
Statement Statement
22 Protection Signalling/ Communication Interface
Equipment
a. For Distance Protection
b. For Pilot Wire Differential
Protection
c. Breaker Failure Scheme
d. For Longitudinal Differential
Protection
23 Other Relays
a. Under frequency Relay(81)
b. Lockout Relay(86)
c. Timers(62)
d. Tripping Relay(94)
e. Tripping & Lockout Relay
Supervision
f. DC Supply Supervision
Relay(74)
g. Test Switches
Note :
• Use additional sheets as necessary. Follow the same format
• Strike-off items which are not applicable to this project.
• In case different make/type/model are proposed, the same shall be listed.
• Confirm that the filled-in Data Schedules attached to this Technical Proposal are photocopies of the Data Schedules attacehd to project PTS.
BIDDER: _________________________________________________________
SIGNATURE: ______________________________________________________
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1) 250MVA,
380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Having been properly read and understood, we, the undersigned certify that the equipment/material offered is strictly in
compliance with the SOW/TS and applicable COMPANY Material Standard Specifications, except for the deviations
mentioned in the table above.
Signature: Signature:
Name: Name:
Date: Date:
TP-VII-1
ITB - Annexure IX - 25
TECHNICAL PROPOSAL ANNEXURE - VIII
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
We hereby convey our interest to associate with the above project and supply the
following Equipment:
Equipment Name/Description:
In the event of placement of purchase order on us we will comply with the COMPANY
Term & Condition of "Manufacture's Responsibility" specified in Schedule "A" of the
Performa Contract.
Signature: Signature:
Name : Name :
Date : Date :
TP-VIII-1
ITB - Annexure X - 26
ANNEXURE IX
TITLE: REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND
ONE(1) 250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Load Losses in SR (D x I)
Guaranteed Load Losses
Guaranteed No Load
Losses in kW
Transformer
SR (G+H)
kW X E
kW X F
Aux)
(total) in kW
B C D E F G H I J
Notes:
The manufacturer shall state the guaranteed transformer losses as part of the proposal for
Signature: Signature:
Name: Name:
TP-IX-1
ANNEXURE X
SUMMARY OF PROPOSED PROTECTIVE RELAYS
Tech. Information in
Item No. Description of Equipment and Materials Name of Manufacturer Country of Origin Type/ Model
Section #
Notes :
1. Bidder to specify and list the Relays and Other Devices taking into consideration the COMPANY Technical Specifications and the Protection
Requirements as per the Scope of Work and Technical Specifications.
2. Use additional sheets as necessary. Follow the same format.
3. In case different make/type/model of same kind of relays are proposed for different applications list them all.
Name of Bidder:
Bidder's Stamp:
Signature:
Name:
Date:
TP- X-1
ANNEXURE XI
SUMMARY OF PROPOSED SUBSTATION AUTOMATION SYSTEMS EQUIPMENT
Title: REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1) 250MVA, 380Kv
TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
Tech. Information in
Item No. Description of Equipment and Materials Name of Manufacturer Country of Origin Type/ Model
Section #
1 SUBSTATION AUTOMATION SYSTEMS EQUIPMENT (As per Notes below)
Notes :
• Bidder to specify and list the SUBSTATION AUTOMATION SYSTEMS EQUIPMENT and Devices taking into consideration the COMPANY Technical Specifications and as
per the Scope of Work and Technical Specifications.
• In case different make/type/model of same kind of SAS Equipment are proposed for different applications list them all.
Name of Bidder:
Bidder's Stamp:
Signature:
Name:
Date:
TP- XI-1
ANNEXURE XIII
TITLE:
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
We hereby confirm that we will take all necessary action, ahead of time, to obtain the required Visa
and relevant travel documents for the representatives of the equipment manufacturer to ensure
their presence/attendance in the Bid Clarification meetings, as requested by COMPANY, conducted
during the Technical bid evaluation period in order to resolve any outstanding Technical issues and
also during the installation period, as necessary. These requirements will also be included in the
Purchase Orders. CONTRACTOR's failure to comply with the aforementioned statement entitles
COMPANY to reject CONTRACTOR's bid proposal.
BIDDER: __________________________________
SIGNATURE: ______________________________
TP- XIII-1
PRE-BID CLARIFICATION FORMAT
RFX NO. 40000
TITLE:
10
TP-XIV-1
ANNEXURE XIV
ON FORMAT
SEC’S RESPONSE
ANNEXURE XV
TECHNICAL PROPOSAL – CHECKLIST
Title:
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1) 250MVA, 380Kv TRANSFORMER FOR HVP,
380kV BSP(JEDDAH)
Name of Bidder:
Bidder's Stamp:
Signature:
Name:
Date:
TP-XV-1
ANNEXURE XVI
WARRANTY LETTER
Project Title:
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
WARRANTY LETTER
We hereby confirm to take the full responsibility of our above-mentioned equipment supplied under this project.
The extent of this responsibility shall cover but not limited to the following:-
* Deal directly with SEC / NGSA in connection with rectification of problem & supply of spares (if & when required).
* Full responsibility of all legal aspects, and should be as per Tender Documents of the above-mentioned project.
Authorized Signature
TP-XVI-1
TECHNICAL PROPOSAL ANNEXURE - XVII
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1)
TITLE 250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
We hereby confirm to comply with all requirements of project management including minimum project
management team, project implementation, materials procurement and delivery schedule, sub-contracting
and the relevant terms and conditions specified in all the instructions to bidders, all the relevant clauses
specified in the Proforma Contract, and all the relevant clauses specified in the Scope of Work and
Technical Specifications, SOW/TS.
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-XVII-1
ITB - Annexure VI - 35
TECHNICAL PROPOSAL ANNEXURE - VII
TITLE:
REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND
ONE(1) 250MVA, 380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
COMPLIANCE STATEMENT FOR QUALITY ASSURANCE/ QUALITY CONTROL REQUIRMENTS
We hereby confirm to fully comply with all requirments of Quality Assurance/Quality Control (QA/QC) for the complete
project as specified in all the instructions to bidders, all the relevant clauses specified in the Proforma Contract, and all
the relevant clauses specified in the Scope of Work and Technical Specifications, SOW/TS.
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-XVIII-1
Note: Bidder shall Submit his proposed Project Schedule along with his Bid Documents.
NNEXURE XIX (SUBSTATION)- PROPOSED PROJECT COMPLETION TIME SCHEDULE FOR SUBSTA
VA, 380kV TRANSFORMERS FOR HVM
380Kv TRANSFORMER FOR HVP, 380kV
PTS-21WR351
JEDDAH)
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
26
TECHNICAL PROPOSAL ANNEXURE - XX
TITLE REPLACEMENT OF TWO(2) 250MVA, 380kV TRANSFORMERS FOR HVM MAKKAH BSP AND ONE(1) 250MVA,
380Kv TRANSFORMER FOR HVP, 380kV BSP(JEDDAH)
3 132kV GIS
6 Bus/Line Reactors
7 MV Switchgear
8 Grounding Transformers
10 Capacitor Banks
11 380kV Cable
12 Telecommunication
13 SAS
14 Protection
Notes :-
• Bidder may swap Main and Alternate Manufacturers within two (2) weeks after contract signing.
Bidder's Stamp
Name of Bidder:
Signature:
Name:
Date:
TP-XX
ITB - Annexure I - 49