Maintenance Manual
Maintenance Manual
KR013.00SM
版本:2010-A KR200.14.00WH
中国•东营 Edition:2014-A
Dongying, China
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Preface
Thanks for choosing the truck-mounted drilling rig manufactured by Shandong Kerui
Machinery Manufacture Co., Ltd.
Maintenance manual of ZJ30/1800CZ truck-mounted drilling rig is a complete set of
truck-mounted drilling rig maintenance document, drawn up by the technical personnel
according to product design manufacture and oil field service experience; and the manual is
mainly used as reference when operator and maintenance personnel maintain the equipment,
to operate the truck-mounted drilling rig in good working condition for a long term.
Please read this manual carefully for the reliable and steady running of the product. This
manual only provides part instruction of the whole rig due to too many mating components of
the rig; and for other parts which are not mentioned, or just make a brief introduction, please
refer to their own service manuals and maintenance manual or its related technical
information in details.
—I—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
All the personnel who operates, manages, maintains and repairs the rig shall be
familiar with the related content in this manual, and obey related regulations for the
usage, management, operation, maintenance and repair of the rig. In addition, pay
special attention to the safety warnings, notes, etc., and national laws, professional
rules and common safety rules, to avoid personal accident and equipment damage.
This manual cannot list all of the safety warning information, so please make sure
that the method will not endanger personal safety, or damage the equipment when any
method is selected to operate.
Please read the explanation of the following warning signs carefully when they appear.
Warning!It will cause possible injury or loss of life to person & serious damage to
Attention!It will cause any injury to person & damage to equipment if not observing
— II —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Contents
Preface ....................................................................................................................................................... I
Important Safety Statement ................................................................................................................... II
Chapter 1 Summary ................................................................................................................................. 1
— III —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
3.1. Maintenance of power take-off case ........................................................................ 12
— IV —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
—V—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— VI —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Chapter 1 Summary
Periodical check, repair and maintenance of the truck-mounted drilling rig can reduce the
possibility of accident in time, which not only can avoid happening tremendous accident,
decrease repair cost, but also can improve the equipment utilization factor greatly, prolong the
service life of the truck-mounted drilling rig. Therefore, please maintain and manage the rig
frequently according to the technical condition and working status of the drilling rig during the
whole usage period of the drilling rig.
The maintenance of ZJ30/1800CZ truck-mounted drilling rig shall be conducted according
to a certain cycle. The periodic maintenance can be divided into shift maintenance, weekly
maintenance, monthly maintenance, half a year maintenance and annual maintenance. The
problems, which are found in the process of maintenance, shall be solved by operator or
professional technicians. The repair working (such as changing bearing, etc.), which is difficult
to repair and large to work on site, shall be submitted to the rig maintenance station or factory for
solution.
For the parts or equipment that is not introduced in detail or introduced briefly, please refer
to their service manuals, maintenance manual, or other technical documents for their
maintenance instruction.
Warning:Please turn the power off when the rig is maintained, and there should be
a locking device and evident warning mark for wrong operation, in order to avoid causing
safety accident of person and equipment injury.
Mechanical, electrical and instrument technicians shall be arranged at the drilling rig site to
operate and maintain the rig.
If the truck-mounted drilling rig breaks down or works abnormally, stop operating the
drilling rig, then maintain it in time.
—1—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
It is forbidden to operate the rig with over speed, over-high temperature, over-high pressure,
over load or other violation of operation regulations.
Periodical check and maintenance are required during the whole usage period of the drilling
rig.
Mandatory and periodical check and maintenance of the drilling rig will eliminate the
possibility of accidents, and avoid accident happening, to keep the normal running of the rig and
prolong the service life of the rig.
As the working environment and condition for the drilling rig are various, the periodical
check and maintenance take common working condition as reference. Therefore, the users shall
consider the actual condition and working environment on site according to own working
experience to update and perfect the check and maintenance content, to keep the drilling rig in a
good condition.
Check
Table 1-1
No. Check grade Rig running period /h Remark
1 Rig running check 80~100 Self maintenance
2 Routine check 250~300 Self maintenance
3 Grade 1 maintenance 500 Self maintenance
—2—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Routine check refers to the periodical check after new equipment of drilling rig or repaired
equipment begins to work. Check content can refer to the periodic check content according to
80-100h operating period of the drilling rig.
Shift maintenance
The shift maintenance items of the drilling rig includes routine check, commissioning,
lubrication, fastening, cleaning, anti-corrosion and other routine operating content; in
addition, it also includes shift maintenance operating items specified by each system and
parts.
The shift maintenance operation shall be completed by operators independently, and it is the
routine check work of operators.
Weekly maintenance
Weekly maintenance shall include items of shift maintenance.
The routine check of weekly maintenance will be completed by operators independently;
part of the work can be done with the help of other people when the work is too much.
Monthly maintenance
Monthly maintenance shall include items of weekly maintenance.
—3—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
The items, which include too much workload or a lot of difficulties (e.g. replacing band
brake or friction plate of the clutch, etc), can be done by relevant people or technicians to
solve.
—4—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Liquid
No. Check position Temp Pressure Remark
level
Engine oil √ √ √
Check running of the
1 Engine Fuel oil √ √
engine
Radiation water tank √ √
Check the running of the
2 Hydraulic speed changing box √ √ √
box
5 Hydraulic system √
6 Hydraulic oil tank √ √
7 Electrical control system Control and check
Differential box/Speed changing
√
box
Steering mechanism √ Check during driving
8 Carrier
Brake mechanism √ days
Control mechanism √
Tire/ air bag of floating axle √
Angle transmission box √
Chain box √
Draw Check during drilling
9 Cooling water tank √ √
works days
Crown-o-matic √
Braking system
—5—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
14 5T air winch √ √
15 0.5T air winch √ √
16 Raising oil cylinder √ √
Temperature is not higher
17 Accumulator √
than 45℃
Attention:Stop to check, and do not operate with faults if there is anything abnormal
found.
—6—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Check oil mass, oil quality, change the oil if
9 Gearbox lubricating oil
the oil quality exceeds standard
Check oil mass, oil quality, change the oil if
10 Chain case lubricating oil
the oil quality exceeds standard
11 Water circulation filter Check and clean
Check oil mass, oil quality, change the oil if
12 Hydraulic oil
the oil quality exceeds standard
Check liquid level, water quality, change the
13 Circulating water
water if the water quality exceeds standard
Electric quantity, liquid level, conductor
14 Accumulator
jointing
—7—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Attrition rate, change when the chain stretches
6 Transmission chain box
3%, change lubricating oil.
Attrition rate of gear and bearing, change
7 Transmission gear box
lubricating oil.
8 Operating handle Operate flexibly, and act reliably.
Please stop the engine until it cools down before change lubricating oil, otherwise,
lubricating oil is easier to flow out.
When adding lubricating oil, the liquid level should be kept at the top position between
the two graduation of vernier scale, it is proper at about 2/3 position.
Please stop running until it cools down before change lubricating oil in the speed
changing box, otherwise, lubricating oil is easier to flow out.
When add lubricating oil into the speed changing box, the liquid level should be kept at
the top position between the two graduation of vernier scale, it is proper at about 2/3
position, according to heat condition(71~90℃)
The water tank of the engine and the water circulating system of the drawworks must add
antifreezing solution according to low temperature requirements.
Before starting the engine, it is required to check whether the water tank of the engine
and the water circulating system of the drawworks are frozen.
When the temperature is lower than -20℃, it is required to take protective measures to
protect the main bearing components such as chassis, mast, substructure and others from
being damaged.
Liquid, gas, water, electrical system and relevant control element should be protected to
take necessarily antifreezing measures.
—8—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Whether rope ring and bail rust or not, and whether there is any corrosion near the end
part.
Whether the steel wire rope is in perfect condition without any broken wire.
Attrition rate of sheaves, and whether it is required to change or not.
The lubricating status of sheaves system.
Whether all pins are in place, and safety pins are all in readiness.
Whether connections of all bolts are tight or not.
With load, measure straightness error of the mast gin poles in the full length rang, and the
perpendicularity error between the mast front & side face and the horizon.
Before raising and lowering, check the buffer device.
Don’t dismantle any transverse brace, diagonal brace or other component in any
condition.
Don’t drill hole, cut hole or weld on component of steel structure.
Check mast and substructure monthly and every time before bearing special load such as
casing.
The connection, working performance and brake performance of brake apparatus and
crown-o-matic.
Sealing property and operation reliability of driller’s console, electrical, liquid, gas
components.
Tightness of dead line and fast line end parts
Fix rack, bearing pedestal and protective device.
Lubricating property and sealing property of each bearing.
Earring bolts on the hook and stop pins should be fastened, the hook should be rotated
—9—
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 10 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
There is no abnormal of air compressor starting and stopping, and oil quality, oil mass
and oil temperature should conform to regulations.
Check the auto pressure regulating device and safety valve.
Check working pressure of air storage cylinder, and discharge water and pollution.
Whether the pipeline is smooth and sealing is in good condition or not.
Temperature raising condition of air swivel.
— 11 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Check whether the external fasters and adapting pieces are loose or not. If necessary, it
can be changed and tightened.
3.1.3. Check items after open the cover of power take-off case
Open the cover plate of the case, to check wear pattern of gear and spline in the case, and
whether the fastener is loose or not.
Check whether shifting fork deforms or not with sample plate.
Check the spring force of ball nut, and adjust or repair as required.
Road test can be used to adjust the working condition of the power take-off case, and
generally the sound is normal without engaging automatically or difficultly; otherwise it is
required to open the cover to maintain.
3.1.5. Maintenance
while the equipment is still hot, and make sure there are no metal fragments. If any metal
fragment is found, open the cover of transfer case to check.
After the waste oil is discharged, plug the oil plug back, add light diesel oil equal to 1/3
oil mass in the power take-off case oil-bath, or kerosene mixed with 5% engine oil into the
transfer case, and then start the engine.
Work in low speed for several minutes (don’t engage the front axle at this time), stop the
engine, discharge the cleaning oil, then add new gear oil to standard rate. It can also clean
using air pressure spray gun to eject cleaning fluid into the transmission.
3.1.6. Lubrication
80W/90(API GL-5)heavy load gear oil is used by power take-off case,and fuel charge
is about 43L.
Oil change period:
The first time after 300 working hours.
From the second time, change oil every 1000 working hour.
Change oil after every overhaul
Abnormal Gear mesh clearance is large, or gear groove hub Change new parts or bead weld
and spline are worn and loose. to repair spline shaft.
sound
Lubrication is not enough due to oil leakage of Fill in or change the lube which
bearing, or lube viscosity is improper. conforms to specification.
Spline gear on shaft and spline of sliding gear Bead weld to repair shaft or
sleeve are abrasive, and clearance is too large. change new parts.
Trip stop
Uneven abrasion of bearing is heavy. Change new parts.
— 13 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Note: Please pay attention to the sound character of the power take-off case
so as to solve it correctly. If there is noise in neutral gear, it could be bearing
looseness. If there is metal grating sound and the temperature of power take-off box is
overheating, it could be oil lacking or bearing tightness. If there is periodic noise
during working, gear could be partly damaged or gear axis is deflected. If the noise is
slight, it can still work, but if there is sharp noise, gear could be broken or metal
pieces get into the box, and it should be maintained immediately.
3.2.1. Check
Gear oil check: It should be taken after stop the machine for several minutes. First of all,
check whether there is any oil leakage appearance of oil seal, do well cleaning work, take
off the plug screw of temperature indicator, and check the oil level. The oil level should
be not lower 10~15mm than the oil plug hole. Fill in the gear oil up to standard rate after
check.
Fastener check:Check whether every external fastener and adapting pieces are loose or
not, and change or fasten them if necessary.
Case internal check: Check whether the gear attrition rate, gear tooth mesh and tightness
of fasteners meet the operating requirement or not.
— 14 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
3.2.2. Maintenance
3.2.3. Lubrication
80W/90(API GL-5)heavy load gear oil is used by angle transmission case,and fuel
charge is about 16L.
Oil change period:
The first time after 300 working hours.
From the second time, change oil every 1000 working hour.
Change oil after every overhaul.
Lubrication grease, No.1 lithium-based, there is a lubricating point, and the lubricating
parts need to be lubricated per week.
Note:Before check the oil level and disassemble the oil pipe, please clean the
end of the oil pipe firstly to prevent dust or other thing falling into the oil-bath,
Otherwise it may cause that the parts inside the transmission box are worn excessively
or the oil pipe is blocked. After check, please add or reduce the oil mass in time.
There should be a complete maintenance of rotary table transmission box after every
1000 working hours.
It is required to check whether fasteners and joint levers are loose or not.
Whether the operating system is flexible, and the lubricating system is
unobstructed.
Change the lubricating oil. Discharge the waste oil while the temperature of the
equipment is high, and pay attention that whether there are metal particles in the oil. If
any metal particle is found, it is required to open the cover of the transmission box to
— 16 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
check, in order to find out the reason and handle the problem.
After the waste oil is discharged, plug the oil plug back, add light diesel oil equal
to 1/3 oil mass of transmission box or kerosene mixed with 5% engine oil into the box,
then start the engine, to work in low speed for several hours, stop the engine, discharge
the cleaning oil, then add the same gear oil up to standard rate.
While changing the lubricating oil, open the cover of the box, check the wear
pattern of the gears and splines inside the box, and check whether each fastener inside
loosens or not, and fasten it if necessary.
Check if the shifting fork of the engagement & disengagement operating device
is deformed or not; please repair or replace it as required. At the same time, check and
maintain the other parts; if it finds damage or serious abrasion, please repair or replace it
in time.
For the working condition of transmission case, it can be judged according to drilling &
workover operation; and it should be no abnormal noise, no automatic or difficulty to
disengage & engage. Otherwise, please demount the cover to maintain and repair it.
After working for every 1000 hours, it is required to check the wear condition of chain at
regular intervals; If it finds serious wear or the length of each section chain has exceeded
52.5mm (elongation exceeds 1.524mm), please change the chain; and it is required to dismount
the transmission shaft, and demount the chain case, then place it on the platform horizontally to
make it set up, and keep the shield of clutch upwards, and open the rear cover plate and end cap
on the box body, drain the oil in it, and demount the chain and replace new chain; Before
replacing, press the new chain on the chain wheel at the upper end opening, to check if it is
fitted well with the roller of the chain; If it finds there is looseness on the chain link on the chain
wheel, it indicates that the chain wheel has been worn and the tooth becomes sharp; Then,
measure the tooth thickness, if the size is less than 28.5mm, please replace a new pair of chain
wheel.
— 17 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
3.3.3. Lubrication
Note: Keep the lubricating oil filled into lubricating oil tank absolutely clean;
please use clean vessel and oil injector to prevent dirt getting into the lubricating oil
tank.
Rotary table transmission case adopts two kinds of lubricating way, which includes
oil filling lubrication and splash lubrication. The gear lubrication of transmission case
adopts splash lubrication; the oil splashed into the case flows into oil collecting box, and
— 18 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
lubricates the bearing through oil duct, meanwhile takes away the heat generated by
bearing.
Note: Clutch annular gear bearing of rotary table transmission box must be
lubricated by grease.
Rotary table maintenance can refer to ZP275 Rotary Table Service Manual in
detail.
— 19 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Mast is the key equipment of petroleum drilling rig & truck-mounted drilling rig, so it
is significant to ensure mast’s integrality and security. Therefore, to ensure the safety of
well drilling operation, mast must be maintained well and taken comprehensive inspection.
During the operating process of mast, it should avoid loading suddenly, to prevent the
mast from heavy impact; Especially under the large hook load, such as running technical
casing, drilling maximum well depth and handling down hole jamming of drilling tools,
please load slowly, and avoid loading suddenly and emergency brake, to ensure mast
security.
At well site, mast should be taken regular appearance inspection by operator (or
appointed representative) at regular intervals. The operator (or appointed representative)
should report the inspection result. In general, check the mast once every drilling cycle,
and check it once again after drilling or workoverk and before transporting. During the
daily drilling & workover process, if it finds any looseness, damage and other
abnormalities, please take actions in time, to avoid accidents.
For the inspection report format, inspection program, scope, specified items and flaw
of mast’s appearance, please refer to appendix in JJ180/38 Mast Service Manual.
Inspection purpose and scope
In order to ensure the inspection work can be carried out fully and completely, and
make sure that the report format is uniform, inspection procedure and report format are
compiled.
American petroleum institute (API) has taken it as reference document and listed it
into the API 4E Appendix A Recommended Regulation for Maintenance and Usage of
— 20 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Drilling Rig and Truck-Mounted Drilling Rig. As long as the listed inspection content
meets the needed inspection condition, all of them can be applied to this regulation. If the
mast is used under the condition that the load is close to its load upper limit, or used under
the limited conditions hindering safety operation, please carry out some more detailed and
strict inspection at regular intervals, or supplement some regulations for this recommended
regulation.
Marks on the damaged parts
When inspection, please make obvious marks on the damaged parts or on mast so as
to carry out necessary repair work. It is recommended to use bright and distinct paint to
make marks. After repair, cover marks on the damaged part by painting. If there is no
damage on the inspected part, the inspector should write “No damage” on it to indicate that
this inspection item has passed the inspection. When inspecting, it had better to refer to the
final assembly drawing and service manual provided by manufacturer. For the inspection
item that could not be inspected and not be inspected, please draw a line after this item in
the table.
— 21 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
should meet the business scope authorized by the superior competent department.
The continued usage, repair or abandonment of mast should be in accordance with
inspection & assessment result.
The comprehensive inspection for mast should be done by qualified technician strictly
according to SY/T6326.
4.1.3. Lubrication
The good lubrication for each rotary part of mast is significant to ensure mast’s
normal running and prolong its service life. Otherwise, it may cause abnormality and
damage. Therefore, the user should pay attention to the lubricating condition of mast.
Please refer to table 2 to lubricate it in time.
Table 2 Reference table for mast main lubrication points
Before repairing or modifying mast, please contact and negotiate with manufacturer to
confirm the raw material and modifying method of mast. Without permission of
manufacturer, the operator and construction technology should be approved by mechanical
— 22 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
chief engineer, and then the operator can repair or modify the mast.
The repairing and modifying for mast should be in accordance with the relevant
regulation of SY/T 6408.
During normal usage period, the mast should be maintained once every half a year.
Generally, mast main body and Y type bracket should be taken rust removal and
anti-corrosion treatment at least once every half a year.
For the serious corrosion parts or positions eroded by drilling fluid, petroleum, natural
gas, saturated salt water and hydrogen sulfide, all of them should be taken rust removal and
anti-corrosion treatment after drilling a well and before moving or transporting to another
well.
As the mast is the main load bearing component part of drilling rig, without
permission, it is not allowed to weld and drill hole on the mast.
Any damaged or missing components during transportation and using cannot be
substituted randomly; please contact with the manufacturer for technical consulting.
When storing the mast, please stack it neatly, and keep it flat; all pin holes of pad eye
should be coated with antirust grease. All guy lines should be bundled into a roll and stored
at a dry place after coated with anti-rust grease.
The maximum bearing capacity of mast means that the mast can bear the maximum
load at normal environment temperature. At the other temperature, the bearing capacity of
mast will decline; especially when it works below -20℃, the operator must confirm the
materials’ low temperature performance and take necessary protective measures.
In order to ensure the crown block works for a long time without fault, please adopt
correct measures to maintain it in time.
— 23 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Before mounting crown block, if there is abnormal condition, please find the fault and
handle it.
Each sheave should be rotated flexibly, and there should be no jamming or blocking
and no abnormal noise; it is qualified that the sheave can be rotated flexibly by hand.
When rotating a sheave, the neighbored sheaves shall not be rotated with it.
Check if the locking nut at the shaft end of crown block sheave and sand sheave can
work reliably; lubricate grease nipple of the crown block’s sheave block at regular
intervals.
All connections must be fixed well; there should be no looseness.
1. Crown block base 2. Fast line sheave 3. Main pulley assembly 4. Sand sheave 5. Dead line sheave
4.2.3. Lubrication
Before using and during operation, each sheave bearing should be filled with a certain
amount of lubricating grease twice every week.
Lubricating grease: No. 0 extreme pressure lithium grease.
Table 3 repaired sheave groove bottom radius
Groove bottom sample dimension
Wire line nominal
diameter Min groove Max groove Min groove bottom radius of
bottom radius bottom radius worn sheave groove
32mm ( 1-1/4) 16.84mm 17.48mm 16.28mm
4.2.4. Common faults and solutions of crown block
Temperature of sheave shaft raises (the temperature raises to more than 70℃).
Reason: oil pipeline is blocked, lacks oil, lubricating oil is not clean, bearing inner
&outer ring are loosened.
Bearing has noise.
Reason: bearing is worn severely; and bearing bracket is loosened.
— 25 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
4.3.1. Inspection
4.3.2. Maintenance
Check the intermediate body of traveling hook and each bearing hand wheel of hook
body at regular intervals. When necessary, please take nondestructive test. If it finds
crack or excessive wear, please stop using it.
Check the sheave, bearing and rope groove at regular intervals.
Under the condition that the sheave edge is worn and it is easy to be out of the rope
groove and wear or damage the wire line, please replace the sheave in time.
When the sheave cannot rotate steadily or the bearing has abnormal noise caused by
the increased bearing clearance, please replace the bearing in time.
When the surface of sheave rope groove has corrugated groove or the groove bottom
radius of rope groove has worn to be less than the value (in table 6), please replace the
sheave in time or re-process it.
4.3.3. Lubrication
Lubricating point
Grease nipple at the shaft end of traveling block’s sheave.
Grease nipple on the brake at the side of hook barrel.
— 26 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 27 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
1.75dMax
1.33d Min
Table 6 New and repaired sheave and drum groove bottom radius
Nominal Nominal
Min groove Max groove Min groove Max groove
diameter of diameter of
bottom radius bottom radius bottom radius bottom radius
wire line wire line
in mm in mm in mm in mm in mm in mm
— 29 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
0.250 6.5 0.134 3.40 0.138 3.51 2.375 60 1.259 31.98 1.306 33.17
0.313 8 0.167 4.24 0.172 4.37 2.500 64 1.325 33.66 1.375 34.93
0.375 9.5 0.199 5.05 0.206 5.23 2.625 67 1.391 35.33 1.444 36.68
0.438 11 0.232 5.89 0.241 6.12 2.750 71 1.458 37.03 1.513 38.43
0.500 13 0.265 6.73 0.275 6.99 2.875 74 1.524 38.71 1.581 40.16
0.563 14.5 0.298 7.57 0.309 7.85 3.000 77 1.590 40.39 1.650 41.91
0.625 16 0.331 8.41 0.344 8.74 3.125 80 1.656 42.06 1.719 43.66
0.750 19 0.398 10.11 0.413 10.49 3.250 83 1.723 43.76 1.788 45.42
0.875 22 0.464 11.78 0.481 12.22 3.375 86 1.789 45.44 1.856 47.14
1.000 26 0.530 13.46 0.550 13.97 3.500 90 1.855 47.12 1.925 48.89
1.125 29 0.596 15.14 0.619 15.72 3.750 96 1.988 50.50 2.063 52.40
1.250 32 0.663 16.84 0.688 17.48 4.000 103 2.120 53.85 2.200 55.88
1.375 35 0.729 18.52 0.756 19.20 4.250 109 2.253 57.23 2.338 59.39
1.500 38 0.795 20.19 0.825 20.96 4.500 115 2.385 60.58 2.475 62.87
1.625 42 0.861 21.87 0.894 22.71 4.750 122 2.518 63.96 2.613 66.37
1.750 45 0.928 23.57 0.963 24.46 5.000 128 2.650 67.31 2.750 69.85
1.875 48 0.994 25.25 1.031 26.19 5.250 135 2.783 70.69 2.888 73.36
2.000 52 1.060 26.92 1.100 27.94 5.500 141 2.915 74.04 3.025 76.84
2.125 54 1.126 28.60 1.169 29.69 5.750 148 3.048 77.42 3.163 80.34
2.250 58 1.193 30.30 1.238 31.45 6.000 154 3.180 80.77 3.300 83.82
Notes: As for the wire line whose diameter is over 0.375in (9.5mm) not list in the
table, calculate the groove bottom radius according to following formula:
Min new worn radius = nominal diameter of wire line + 6%
Max worn radius = nominal diameter of wire line + 10%
— 30 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Replacement cycle of lubricating oil in chain case: The circle should be over 2000h,
when there are few impurities in oil, no severely deterioration, and no leakage.
Inspect, adjust and tighten adopting piece of all transmissions, and inspect whether
chains are damaged, if necessary.
Inspect wear pattern of clutch and brake block at any time, and adjust or replace them
promptly.
Inspect wear pattern of fast line; replace them if excessive abrasion, or strand and wire
broken is found.
In general, inspect wear pattern of chain wheel, bearing, seal and others for
semi-annually, and replace them timely if necessary. Inspect lubricating system, and
inspect whether pneumatic control system hoses or all connections are loose.
— 31 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Contents not listed in inspection items should be also noted in the back and forth
inspection, and eliminate equipment hidden dangers at any time to keep equipment run
normally.
After drawworks runs for a period of time, the running parts will be worn in varying
degree, and the connection parts shall be loosened, pipeline may be blocked, and sealing
elements get aged. If it keeps going like this, the normal use of equipment will be affected.
Therefore, regular inspection and repair should be adopted except daily inspection and
general maintenance mentioned above. There should be professional personnel engaging
into the regular inspection, and the large-scale maintenance should be carried on in
maintenance station or machine repair workshop.
Inspection item of drawworks semiannually:
Inspect wear condition of brake hub, and replace it if necessary. Commonly, the
factory abrasion loss of brake block is 10mm. When the abrasion loss ≤
X1mm, brake
block should be replaced. The brake block abrasion loss diagram refers to figure.3.
Inspect whether pneumatic tube clutch air bag is aging,
and inspect the abrasion degree of friction block,
replace it if necessary.
Inspect following components of lubricating system,
and replace, overhaul, or adjust the components
according to the situation.
Chain case and lubricating oil Countersunk bolt
Oil pipeline
Fig.3Brake block wear mass loss diagram
Sealing element
Warning: As any brake block wears and leads to the fixed bolt head touching
the brake hub, all brake blocks should be replaced, to avoid brake block and brake hub
slipping, and equipment trouble and personal casualty.
— 32 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
JC28/11 drawworks lubricating system adopts engine oil bath lubrication and grease
lubrication.
Lubrication principle
Lubricating method of drawworks chain adopts engine oil bath lubrication.
Oil pointer is equipped at the lower part of the chain case. Pay attention to oil pointer
when drawworks starts to use and is in process of using, and keep the oil level in the
middle.
Oil added in the chain case
— 33 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Main lubricating position of drawworks includes axial bearings of both sides of drum,
clutch bearing, dual-purpose swivel, brake mechanism connecting rod, pin shaft, crank
throw, spline, bearing, etc.
Apart from the part adding grease of drum shaft axial bearing locating on rack side
plate, other lubricating points are all located at positions required to be lubricated.
When adding in grease, it should pay attention that if there is oil chamber filler
connected with copper pipe in the middle, disassemble the oil cup, connect the grease
machine joint, and then add in grease by grease machine.
For oil cup connecting to lubricating grease cavity directly, add grease into cavity
with grease gun or with grease machine.
Lubricating grease: recommend to use No.1 lithium grease.
— 34 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Inspect whether instrument in the driller control box is right, whether the inside and
outside of box are clean, and whether air leakage exists.
Inspect whether each control valve works reliably.
Inspect crown-o-matic: crown-o-matic should be tested before round trip every time,
to ensure it’s safe and reliable.
Inspect whether the exhaust valve and air supplier are in good condition.
Inspect whether each pipeline leaks air or not.
Adjust the pressure of reserve tank on the truck-mounted drilling rig to 0.8MPa。
Add lubricating grease into air swivel.
Check whether the clutch works reliably.
Check whether the brake cylinder works reliably.
Pipeline polluted will cause pipeline blocked, valves failure even damage, and
security incidents will occurs. Thus it should keep the pipelines clean, and replace them if
necessary.
When moving truck-mounted drilling rig, the disassembled pipeline joints should be
protected, and the opening of pressed hose should be wrapped with clean cloth, and
the opening of metal pipeline should be blocked or wrapped with cork.
Pipeline should be clean with compressed air before installed, and connect the pipes
— 35 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
When operation of pneumatic control elements is wrong or failed, it should not take the
valves apart casually. As there are many reasons for valve faults, and the faults are not
always caused by valves sometimes, it’s probably due to air circuit pipeline jam or low air
pressure. So don’t take pneumatic control elements apart casually when meeting this kind of
faults. The treatment method: firstly, confirm the position of fault according to pneumatic
control schematic diagram; then check per section (check the control gas circuit at first, open
the air connector in sections, and then check the venting condition), if the control air circuit
is unblocked, and then check the working air circuit. Disconnect the air outlet pipeline of
valves, and check the venting condition. If it’s blocked, check the intake pipeline. If intake
pipeline is unblocked, it shows that there’s something wrong with valves, and open valves to
repair. Commonly, replace the problematic valves with the emergency valves, and then
check faults of the replaced valves, in order to ensure that the drilling work can operate
normally.
After well drilling or a period of time (not more than three months), take a maintenance
for whole air system, inspect the easily damaged parts conditions completely, and replace
and clean them promptly, to avoid valves running in abnormal state.
Details about thrust disc clutch maintenance refer to relevant service manual.
Details about auxiliary brake maintenance refer to relevant service manual.
— 36 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 37 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 38 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Resistance of
no-load running Brake is not adjusted well. Readjust brake.
is big.
Clearance between brake
band and brake hub is too Readjust clearance.
Sand big.
4
drum Running end of brake isn’t Readjust running end of
Brake failure adjusted well. brake.
Brake block is worn
Replace brake block.
excessively.
Readjust brake or
Brake failure Brake system failure
maintenance
Air pressure of clutch is
Adjust air pressure
Auxiliary Brake force is too low
6
brake not enough. Brake hub clearance is too
Adjust brake hub clearance
big
— 39 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 40 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Ambient temperature is not lower than -20℃, when substructure bears loads such as the
largest hook load of mast, the largest load of rotary table and others. If the operating
ambient temperature is lower than -20℃, the heat equipment must be started to make
heat protection for substructure in order to avoid lowering greatly performance of
components’ material under low-temperature environment, which results in damage of
components even dangerous accident and other aftermath.
The base of drilling rig substructure should be firm and reliable, and the base is above
ground for 150~200mm so that there is appropriate slope for nearby ground of base,
which is convenient to drain away water and keep the soil stability
When the base of drilling rig substructure is found to sink unevenly during operating,
the remedial measures should be taken without delay.
When substructure bears the load, it is not allowed to disassemble any load-bearing
components and adapting pieces of the main body.
In the course of using, substructure should avoid loading suddenly to prevent from
occurring excessive impact load.
In the course of substructure using, check regularly whether all bolts loosen or not,
whether pin roll and safety pin fall off or not ,whether welding lines crack or not,
whether railing fixture is reliable or not, and whether the safety exit is clear or not, etc.,
to make sure that substructure works normally.
If paint film of metal components is found to fall off, it needs to paint in time, to reduce
rusting and prolong the service life of metal components in the process of usage.
If the structural components are deformed or damaged due to crash in the course of
usage, it should be corrected or changed timely, to ensure to use safely.
Check oil level and oil temperature of the climbing chain box periodically. When the
— 41 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
The crack or mechanical damage will badly damage equipment and cause failures
immediately. The aim of inspection is to eliminate the defects of substructure. If there are
some defects on substructure, it should stop using or to repair at once.
The regular inspection should be taken periodically during the usage of substructure,
and the inspection results are recorded in the document and diagram of equipment.
Inspect the contact condition between substructure and its base.
Inspect if there are cracks or breaks for the all welding lines.
Inspect if all components have obvious deformations.
Inspect if stairway, handrail and railing of all parts are complete, fastened and in good
— 42 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
condition.
Class Ⅰ
The rig personnel should check visually if substructure performance is in good
condition during operation.
Class Ⅱ
Based on class Ⅰ, inspect thoroughly (but not limited to) if the load-bearing area
and sheaves have crack, damage, corrosion, loosing or missing of spare parts. Take
class Ⅱ inspection when truck-mounted drilling rig is installed
Class Ⅲ
Based on class Ⅱ, check visually and thoroughly all bearing spare parts and
components to ensure the substructure condition is normal, and record the well site
inspection report with uniform format. It should be considered to check in accordance with
the more detailed and higher supplement program when substructure is used under its
limiting condition or structure is in critical condition which influences the structural safety
performance.
Class Ⅳ
Besides class Ⅲ inspection, it still needs to disassemble and clean all critical
regions which the equipment shall take nondestructive test. All the pipe (or enclosed
type) components should adopt ultrasonic section test to inspect if there is no corrosion
inside. It can also adopt inner camera controlled by cables to inspect visually the inner
corrosion condition.
The damage found in the inspection can be divided into three types: severe
damage, moderate damage and slight damage according to the following principles.
Severe damage: The main bearing components have the obvious geometry deformation
or structural damage.
Moderate damage: Non-main bearing components have obvious damage or
deformation.
— 43 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Ⅰ √ Select
Ⅱ √ Select
Drilling rig
Ⅲ √
document
Drilling rig
Ⅳ √
document
The cycle mentioned above is used in the regular service life of equipment. It should be
considered to increase the amount of inspection under the corrosion environment, such as
wet, saliferous, sulfuretted hydrogen and so on.
The maintenance for substructure mainly includes adjusting, clean, lubrication, test and
changing quick-wear parts and other actions.
During the normal service life of substructure, it needs to maintain once a year and
antirust and anticorrosion treatment should be conducted once every six months.
— 44 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
The severe corrosion parts, which immerse into drilling fluid, petroleum, natural gas,
saturated salt water, and sulfuretted hydrogen and others, should conduct antirust and
anticorrosion treatment thoroughly after drilling the well and before transportation.
Warning: It is forbidden to punch, cut hole or weld for rotary beam and
setback beam of substructure and the relative components without the
allowance of specialized management institution.
6.3.4. Corrosion
It should be repaired when the rusted damage of components’ cross section is more
than 10%. The rusted area should be bright and clean (close to metal color) after abrasive
blasting and mechanical cleaning. The assessments and repair methods are as follows:
Repair to weld the rusted area and burnish smoothly.
Seal weld the damaged area of connecting plate.
— 45 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Pay attention to protect coat of painting for component surface, to avoid causing severe
corrosion of components in the course of disassembling and transportation for
substructure.
During disassembling and transportation, prevent substructure from strength loss
caused by colliding and others, and avoid disassembling powerfully and deforming
components when using.
During installation and operation, substructure should be operated within the safety load
range, to avoid overload use according to Service Manual for DZ180/6 Substructure.
It is forbidden to punch hole, cut and weld and so on casually on substructure. If it is
necessary, the relative department or personnel should agree with it. Constructors
should be professionals with the relative work certification.
The relative personnel should conduct basic safety check for substructure per day. It
should be eliminated and rectified in time if there are some problems or abnormity for
substructure.
In the course of normal usage, prevent substructure from corroding due to soaking in the
acid, alkali corrosion materials and others, check the painting of substructure surface at
regular intervals (per running 800~1500h), and make up painting in time at place of the
paint falling off , which reduces corrosion and prolong the service life of components.
The section where substructure contacts with the ground should conduct antirust and
anticorrosion treatment at regular intervals (per running 1500h).
— 46 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
6.4.1. Package
After disassembling, assort and pack the small pieces, including adjustable lead screw,
bolt, nut, axis pin, safety pin, electrical appliance and others; furthermore, place them in
the fixed location. When disassembly is finished, count the quantity, and pack them in the
box to avoid losing. Railings, pedals, walkway and other parts required to be disassembled
and structural rod should be tied up with washer to avoid damaging the painting and
components. Besides, use label to mark and record. For the large parts of main body, they
can be packed in nude and taken necessary protection treatment.
6.4.2. Transportation
When substructure needs to transport after packing, it should be tied up firmly with
washer whatever long-distance or short-distance transportation, to avoid damaging the
painting or components.
In the course of lifting transportation for substructure, strictly prevent components
from colliding or deforming. If such conditions happen, it should be corrected and changed
in time. When substructure is transported after disassembling, it should pay attention to
safe keep for axis pins, bolts, safety pins, electrical parts, railings and other accessories. It
should paint lubrication grease to avoid corrosion for the fastening connection pieces and
nude metal machining surface such as the metallic pin hole, thread and others.
All the transportation parts are only allowed to hoist, and it is required to hoist the
reliable part, such as special lug.
— 47 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
6.4.3. Storage
Substructure should be located at the dry horizontal plane where is smooth and has
enough support points, to avoid deformation for components when storage.
When substructure is out of use for a long time, it should clean with hot water and
store in the open-air warehouse. If it is limited by condition, substructure should be put in
the dry and ventilated place to avoid direct sunlight, and take the rain-proof action. The
disassembled small parts and components should be lubricated in order to store for a long
time, to avoid rusting, damaging or affecting requirements for usage safety performance.
Besides, electrical parts should be taken anti-aging action.
— 48 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
7.1. Lubrication
The good lubrication for every running parts of drilling rig ensures that the rig can be
operated smoothly and prolonged the service life; otherwise, it will cause damage
abnormally.
Therefore, user should pay attention to the lubrication condition frequently, choose the
proper brand of lube according to the local ambient temperature, and lubricate in time, in
order to adapt to the working environment of truck-mounted drilling rig.
In summer In Summer
Fuel
and Winter and
No. Part Summer charge
-25~49℃ Winter >
(L)
-35℃
Hydrodynamic
2 Allison C-4 special hydraulic oil 70×2
transmission
— 49 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Rotary table
8 transmission box(gear (API GL-5)80W/90 heavy load gear oil 18
box)
Rotary table
9 transmission box(chain SAE30 4
box)
Note: The lubes in the table are for reference, and customers adjust lubes
according to the different operation environment and temperature difference.
The recommended usage for engine fuel oil sees in the table 9.
Table 9 Fuel list
— 50 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Selection
The cooling fluid should be chosen properly. Otherwise it may cause corrosion and
scale buildup for the cooling circulatory system chamber, which affects the heat emission
of the diesel engine, draw works and other equipment, and leads to some components
overheated and damaged in the severe condition.
The cooling circulatory system water should be neutral soft water, and the distilled
water, deionized water and softened water should be adopted firstly. It is forbidden to
use seawater, saline water, and industry wastewater.
The proper amount of anti-rust additive should be added into circulation water so as to
prevent the water tank, pipe and equipment from rusting.
When the temperature is lower, the antifreeze fluid should be added according to the
local ambient temperature.
Matters needing attention
It is forbidden to use the anti-rust additive and antifreeze additive at the same time.
When the cooling fluid needs to be changed, it should be drain away the original cooling
fluid, and clean circularly the pipeline, water tank and other circulatory equipment.
After using the antifreeze fluid, it should check the antifreeze fluid energy efficiency
and level condition regularly to avoid lowering antifreeze fluid energy efficiency and
equipment frost crack.
The ratio should be proper between antifreeze fluid and circulatory water under the
low-temperature environment; otherwise, the circulatory water is hard to satisfy the
antifreeze energy efficiency.
— 51 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Usage amount
Cooling system for engine: 40L×2
Independent cooling system for draw works:8m³
Cooling system for sand drum:340L
Antifreeze for air control system
The proper amount of ethanediol should be added into anti-freezer for air control system
under the low-temperature environment, to prevent air pipeline, valves and others from
freezing.
When anti-freezer is added, the engine should stop working, to prevent pressure of
anti-freezer from hurting people.
Anti-freezing solution
The American Extended Life Coolant is recommended to use.
It can be replaced by using glycol, and the ratios see the table 9:
Table 9 glycol ratio table for anti-freezing coolant
-20 34 66
-30 44 56
-40 51 49
It is not allowed to add too much anti-freezing additive. And if the ratio of
anti-freezing additive is excessive, it will reduce the anti-freezing effect.
Lubrication points for drilling rig running parts and the period for filling and changing
grease sees in the table 10.
Table 10 Lubricating points of ZJ30/1800CZ
— 52 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
No.1 lithium
2 Output bearing of angle case 1 Every month
base grease
No.1 lithium
Bearing 1×2 Every day
base grease
Intermediate
No.1 lithium
base for brake 1×2 Every day
base grease
shaft
3 Main drum
Bearing for
No.1 lithium
brake 1×2 Every week
base grease
transition shaft
No.1 lithium
Swivel 1×2 Every day
base grease
Low-position No.1 lithium
2 Every day
brake base grease
No.1 lithium
Bearing 1×2 Every day
base grease
Clutch air No.1 lithium
1 Every day
swivel base grease
— 53 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
No.1 lithium
Brake 1×2 Every day
base grease
No.1 lithium
Bearing 1×2 Every day
base grease
Clutch air No.1 lithium
1 Every day
swivel base grease
Input
No.1 lithium
transmission 3×4 Every month
base grease
shaft
Rotary table
Bearing for No.1 lithium
5 transmission 1×2 Every month
chain box base grease
system
Output
No.1 lithium
transmission 1×3 Every month
base grease
shaft
— 54 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
shaft
Tong
No.1 lithium
hydro-cylinder 1×1 Every day
base grease
sheave shaft
Telescopic
No.1 lithium
cylinder 4×4 Every mast raising
base grease
centralizer
upper and
6 Mast No.1 lithium
lower locking 4×2 Every mast raising
base grease
block pin roll
— 55 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
No.1 lithium
Hook body 3 Every day
base grease
No.1 lithium
Lifting bail 2×2 Every day
base grease
No.1 lithium
Seal ring seat 1 Every month
base grease
8 Swivel
Upper bearing No.1 lithium
1 Every six months
seat base grease
No.1 lithium
Oil pitch 1 Every six months
base grease
No.1 lithium
9 Lifting cylinder 2×2 Every six months
base grease
No.1 lithium
10 3T hydraulic winch 1 Every day
base grease
No.1 lithium
11 5Thydraulic winch 1 Every day
base grease
The common faults for carrier of truck-mounted drilling rig refer to the abnormities in
the process of normal operation, which needs to pay more attention, to avoid any possible
unnecessary damage due to any negligence.
The common faults and corresponding solution can refer to the following table 11, as
user’s reference. And common faults and corresponding solution of other components can
— 56 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
○
1 Compressor works ○
1 Maintain or change air
The system
improperly. compressor.
Pneumatic has no
2 pressure or ○
2 Pressure regulating ○
2 Maintain or change
system pressure is
valve does not work. pressure regulating valve.
too low
○
3 Pipeline is broken. ○
3 Change pipeline.
— 57 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
○
4 The system pressure is ○
4 Adjust pressure regulating
too low. valve.
○
1 Pointer of pressure
gauge does not work ○
1 Change pressure gauge.
normally. ○
2 Same check and solution as
○
2 The system has no the above.
— 58 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
○
1 Chain is broken.
○
2 The brake is not
○
1 Change the chain.
loosened.
○
2 Loosen the brake and the
○
3 The pressure is not
brake spring goes back in
enough.
position.
○
4 Air bag is broken.
○
3 Regulate the air pressure.
○
5 . Pressed plate is
Roller does ○
4 Change the air bag.
5 Draw works damaged.
not rotate. ○
5 Change the pressed plate.
○
6 Clearance of
○
6 Adjust again according to
intermediate gear disc is
requirements.
too large.
○
7 Clean oil dirt and coat the
○
7 Surface of friction
colophony powder
block has oil dirt.
○
8 Change friction block.
○
8 Friction block is worn
severely.
RT
○
1 Gear is blocked or
transmission ○
1 check or replace gear
case has no damaged.
RT power ○
2 replace clutch
○
2 Clutch is broken.
output
6 transmission
RT
○
1 Clearance of gear is ○
1 Adjust the clearance of
case transmission
case has large. gears.
abnormal
○
2 Bearings are damaged. ○
2 Change bearings.
sound
○
1 Air pressure is not ○
1 Adjust air pressure.
RT
enough. ○
2 . Change air bag.
transmission
○
2 . Air bag is damaged. ○
3 Change press plate.
Transmission case
7 ○
3 Press plate is damaged. ○
4 Adjust the clutch clearance
system transmitting
○
4 . Clutch clearance is again.
torque is not
large. ○
5 Clean oil dirt and coat
enough.
○
5 Fiction block surface colophony powder.
— 59 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 60 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
— 61 —
ZJ30/1800CZ Truck-mounted Drilling Rig Maintenance Manual
Shandong Kerui Machinery Manufacture Co., Ltd.
Rotary table
Oil gun
Transmission shaft
Oil level
hand)
— 62 —
科瑞全球服务中心
GLOBAL SERVICE CENTER
中国 China
No.233 Naner Road, Dongying,Shandong, China
Tel: +86-546-8179682 8179683 Fax: +86-546-8179681
Website: http://www.keruigroup.com E-mail: sales@keruigroup.com
伊朗 Iran 俄罗斯 Russia
No. 40 West Armaqan St., Valiasr. No. 50 flat, РФ, Москва, ул.Кольская, дом.2, кор.5
Afra Residential Complex. Tel:+7-4991868148
Tel: +98-21-2266-0427 Fax:+7-4991868148
Fax: +98-21-2266-0436
阿 拉 伯 联 合 酋 长 国 The United Arab 哈萨克斯坦 Kazakhstan
Emirates Республика Казахстан,город Алматы,ул.
Flat 1106 Kazi & Nephews apartment Tecom, Наурызбай батыра,91 Тел
Sheikh Zayed Road Dubai UAE Tel:+7-727-263 6268
Tel: +971-4-4428548 Fax:+7-727-2636268
Fax:+971-4-3592672
叙利亚 Syria 乌兹别克斯坦 Uzbekistan
Mezza Jebel Zone-Damascus, Syria Республика Узбекистан, г. Ташкент, ул.
Tel: +963-9499-36068 Бодомзор Йули, дом 6
+963-9697-09320 Tel: +998-712372962
Fax: +998-712375631
印度尼西亚 Indonesia 土库曼斯坦 Turkmenistan
Puri Mperium Office Plaza G17 J1 Kunigan Деловой Центр Управления Делами
Madya KAV5_6 Аппарата Президента Туркменистана г.
TEL: +21- 8313604 Ашгабат Туркменбаши шаелы, 124
FAX: +21- 8313604 Tel: +993-12450809
Fax: +993-12450809
苏丹 The Republic of Sudan 哥伦比亚 Colombia
Buliding 16 Morab 64 Riyadh District, Av.15 No.93B-28 oficina 602 Bogotá DC,
Khartoum, Republic of Sudan Colombia
Tel: +249-153993016 Tel:+57-1-742-5323 742-5326
Fax: +57-1-7037344
利比亚 Libya 巴西 Brazil
Omar Almakhatah Street, Tripoli, Libya Rua Domingos Ferreira 92/1004, Copacabana,
Tel: +218-21-718-0744 Rio de Janeiro, Brazil
Tel: +55-21-84384187
Fax: +55-21-21373962
印度 India 厄瓜多尔 Ecuador
JayBee House. Sundarpur. R.G. Baruah Leoniclas Plaza N24-388 Y Baguerizo
Road,Guwahati. India Moreno.Quito Ecuador
Tel: +91-361-2207053 Tel: +593-10292023460
Fax: +91-361-2204097 Fax:+5932-2540794
Shandong Kerui Petroleum Equipment Co., Ltd
Add:No.233 Nan’er Road, Dongying, Shandong
Tel: 86-546-8123166