0% found this document useful (0 votes)
80 views4 pages

Packing Procedure IT-18

PAcking Procedure for Valve shipment, Weather proof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
80 views4 pages

Packing Procedure IT-18

PAcking Procedure for Valve shipment, Weather proof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
© arflu Via WORKING INSTRUCTION _onrezrmxn018 sens imout breaking any boards should be reivoreed convenient in order to permit opening ee closing wi board, This relforcerent maybe a boss that cover al he top board, See cluded deta [i he inside sufaces must be protected wh paper to avo the azpearance of coreson this ste four ‘ies, tho bottom andthe tp par. And in oe to avid he valves toga a lack cour in he atom of he ‘anges, they shuld be protected wih plastic. This may be done using & paste bag Yor each valve of protecting al the surtaces ofthe box wih paste {Allthe boxes even those who ince smal ves have o be fasted inorder ha hey donot move ues the tansport “Though the valves are paint there must be separated some of thers to avo frets Ans indie bags against dampness [Alte painted vaives must have been dying atleast 36 hour nee o avo hat, when nosing hem ine boxes, the painting ies, and they gets when some part of a painted valve (ends, hand wheel, yoke... ouches to anther valve, must incase between both, some kind of material ha avoids rubbing and theefe the deterioration ofthe pang te supported by 2 or more sold Beards, is not allowed thet he suppers are mae wth 25 + The boxes wil rm high, 85 mm wie, a wi be mm tick boards stuck to each other. These supports must be 100, separated 250 mm minimum and 500 mm maximum, + inside ofthe boxes you must put some sins to make ft stonger. «When's apicbl he gearboxes must be wih a las prtetnn on the top of he gs ree fom the water and the rust. *+ Boxes shouldbe identified wih a packing ist intwo sides ofthe Dares it sides of the box inside ofa plastic The txes saul be clay ident wth the packing st 2 oe * international symbols described below bag fixed with stapes tothe box. The boxes wil be identified wih he # ‘nwo opposite sides ofthe box: 7 arflu 7 arflu Askew WORKING INSTRUCTION bate 271032019 PACKING PROCEDURE 3. MODIFICATION REPORT —l Ne DATE MODIFICATIONS REALIZED | | 0 | 0407/02 | New edition, standard UNE-ISO 9001:2000 JAVIER VEGA | 1 | 01/05/06 | Adecuation to the new corporation identity LEIRE MUNGUIA | [2 | s110108 | Modification of the thickness of the top part of the box LEIRE MUNGUIA i 3 | 28/04/11 ‘Modification for order PV2011009 LEIRE MUNGUIA | 4 | 18/06/18 | Adequation of the valve positions according to the valve type ANDONI GOMEZ | 5 | 27/03/19 | Adequation of the valve positions according to the valve type RAMON MARTIN.

You might also like