METHOD STATEMENT OF WALKWAY
Road Works Sequence of Work
Below is typical sequence that can be followed for doing the site construction of roads :-
1. Preparing & laying 150mm thick crusher run
2. Preparing & laying 50mm thick lean concrete
3. Preparing & Laying 150mm thick concrete grade 25/20 slab as base
4. Preparing & Laying 1 layer of BRC A6
5. Preparing & Laying 30mm thick levelling cement screed
6. Preparing & Laying ‘Tac Tile’
Laying 150mm thk Crusher Run
The crusher run road base to be placed on top of the sub base shall consisting of
crushed aggregate laid in layers each of thickness not exceeding 200mm and to give the
specified total compacted thickness and width, correct line and levels shown in road
construction drawings.
The material shall be crushed rock of hard durable particles or fragments of rock
crushed to the correct size, well graded and lie within the following grading limits specified in
the specification.
Care shall be taken to prevent segregation of the material into the coarse and fine
fractions.