Electrical Works Cost Estimate

The document provides a cost estimate for electrical works for a district in Lahore, Pakistan from July 2022 to December 2022. It includes costs for items such as [1] an air conditioning panel, [2] LT cables of various sizes to connect equipment, [3] PVC pipes for wiring, and [4] earthing systems for outdoor units and fan coil units. The total estimated cost is 20,546,927 Pakistani Rupees.

Uploaded by

bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views1 page

Electrical Works Cost Estimate

The document provides a cost estimate for electrical works for a district in Lahore, Pakistan from July 2022 to December 2022. It includes costs for items such as [1] an air conditioning panel, [2] LT cables of various sizes to connect equipment, [3] PVC pipes for wiring, and [4] earthing systems for outdoor units and fan coil units. The total estimated cost is 20,546,927 Pakistani Rupees.

Uploaded by

bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PLANNING AND DEVELOPMENT DEPARTMENT LAHORE

ELECTRICAL WORKS COST ESTIMATE


MRS, 2nd BI-ANNUAL-2022 (01.07.2022 to 31.12.2022) DISTRICT LAHORE

ITEM RATE AMOUNT


MRS Ref. DESCRIPTION QTY. UNIT
NO. (Rs.) (Rs.)
1 AIR CONDITIONER PANEL (ACP)
Supply, installation, testing and commissioning of LT Panels including Sync Panel and PFI Panel as per single line
diagram, Form 3B, to be installed in substation as and where shown on drawings, made of MS Sheet 14 SWG door and
frame all of degreased and derusted, zinc phosphated, finished with electrostatic powder coating of 95-100 micron
thickness in approved color with hinged door, flexible earthing strap lockable handle, catcher, earthing bar, neutral bar,
digital meter with selector switch, 3CTs, Ammeter built in selector switch, 3 Phase indication lights (R.Y.B) internal
wiring 3 from MCCBs terminating on cable terminal blocks to be installed at the top of MPB. All incoming and
outgoings breakers ACBs/MCCSs/MCBs/LBS shall be as per Single Line Diagram, including cost of sets of Brass
24/88,89, Glands & Lugs suitable for cables of sizes corresponding to the breaker capacities & all necessary materials.. All
1 L/S 164,970 164,970
91 material shall be manufactured by any of the WAPDA/LESCO approved manufacturers, complete in all respects. Cable
glands with shroud as approved by LESCO for cable sizes mentioned in single line. Including all accessories like Digital
Voltmeter and Ammeter, Energy Analyzer Phase Indication Lights, ASS and VSS. Power Factor Digital Controller.
Capacitor Bank including all accessories. Main and connection busbars current density shall not be less than
1000Amp/Sq. Inch. Having Ventilation Fans and Panel Lights and Hooters and all accessories Reduced size neutral
busbar shall not be allowed. All electrical distribution boards shall be manufactured by an a direct authorization partner
for Circuit breaker . Make ABB or Schneider. Shall be WAPDA approved in M2 Category. Recommended Panel
Manufacturers are Bilal Switchgear, Tariq Electric or Equivalent.
Incoming
2 x 1600 A FP ACB 65 KA 2 Each 478,158 956,317
Outgoing
10 x 160 A 36 KA MCCB Tripple Pole With Adjustable Thermal-Magnetic Trip /Electronic Trip (60-100%) For ODUs 10 Each 48,034 480,343

10 x 32 A 36 KA MCCB Tripple Pole With Adjustable Thermal-Magnetic Trip /Electronic Trip (60-100%) For FAUs 10 Each 37,234 372,343
2 LT CABLES
Supply, installation, testing and commissioning of PVC/PVC Insulated Unarmored Copper conductor cable 600/1000
Volt grade manufactured by any WAPDA approved manufacturers i.e. Pakistan Cables, Newage Cables and Fast
Cables or any other equivalent brand, prelaid conduits/trenches to be installed as per routes shown in drawings
including cost of all necessary materials. connections, identification tags, cable lugs properly crimped at both ends for
24/13(c)
the sizes mentioned under complete in all respects. Actual length of cables to be installed shall be measured at site by
the contractor, duly authenticated by the employers electrical engineer before placing the order with the manufacturer.
However approximate length of cables are shown herewith. Payments shall be made as per actual length installed.
(From ACP to ODUs)
a 4C, 50 mm2 ODUs 2000 Rft 1,859 3,718,500
b 4C,16mm2 FAUs 2100 Rft 644 1,351,455
c 1C, 25mm2 EPC 2000 Rft 255 510,200
d 1C,10mm2 EPC 2099 Rft 155 325,660
e 1C,6mm2 EPC 200 Rft 118 23,640
f 2C,1.5mm2 m stranded copper PVC insulated FRLS wire (ODUs to IDUs) 21000 Rft 160 3,360,000
g Shielded control cable FRLS (as recommended by OEM ) (ODUs IDUs) 21000 Rft 160 3,360,000
3 PVC PIPE
Supply and erection of PVC Pipe for wiring recessed in walls and on surface including inspection boxes clamps, pull
boxes, bends tees, repairing surface etc. complete in all respect make Beta, Dadex Popular or equivalent For Control
24/2/a/iii 21000 Rft 274 5,743,500
and IDUs Cable.
i) 25mm
4 NS EARTHING FOR ODUs and FAUs
Supply, Installation, testing and commissioning of Bore type, earthing as per WAPDA standards and specifications
comprising of 25 meter 70 mm2 bare Cu stranded conductor, hug in 2 inch dia GI pipe up to slush below ground and
connected to 3/4 inch dia 10 ft. long Cu rod. The rod shall be dipped in mixture of NH4Cl, CaCO3 and Charcoal in the
pipe. Including earth conductivity material : Bentonite Based , Weight Bag 20 kg. Provide a GI Tee and Cap on the top
2 Job 90,000 180,000
of the pipe to take the stranded conductor out of the manhole for other connections. Pit with CI/PVC Cover size 2x2
feet included in this job. Earthing set with discunnecting link bars complete with accessories for ODUs and FAUs . To
achieve Earthing value of less then 5 Ohms as per Drawings/ Data approval by Consultant/ Client. The payment shall be
made as per actual work done.
TOTAL COST 20,546,927