Costing NH-14

The document compares three options for bypass alignments at two different locations: 1. Shalboni - Option 1 has the lowest cost but highest impact on agriculture. Option 2 has medium impacts while Option 3 has high impacts on buildings and resettlement but the lowest civil costs. 2. Chandrakona Road - Option 1 involves a flyover-cum-bypass. Option 2 has 2 underpasses and 1 major bridge. Option 3 has the longest length and includes 3 underpasses, 1 major bridge, and 5 minor bridges. It also includes 2 RoBs.

Uploaded by

p sen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
530 views42 pages

Costing NH-14

The document compares three options for bypass alignments at two different locations: 1. Shalboni - Option 1 has the lowest cost but highest impact on agriculture. Option 2 has medium impacts while Option 3 has high impacts on buildings and resettlement but the lowest civil costs. 2. Chandrakona Road - Option 1 involves a flyover-cum-bypass. Option 2 has 2 underpasses and 1 major bridge. Option 3 has the longest length and includes 3 underpasses, 1 major bridge, and 5 minor bridges. It also includes 2 RoBs.

Uploaded by

p sen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 42

Sl.

Particulars Unit
No. 1. Shalboni

Option- 1 (Rec.) Option- 2 Option-3


(Flyover)
Along Existing
1 Side of Bypass   RHS LHS
Alignment
2 Start Chainage Km 144+325 144+300 145+500
3 End Chainage Km 147+120 146+710 146+400
4 Total Length Meter 2735.828 2620.308 1900
5 Bypass Length Meter 2735.828 2620.308 0
6 Flyover Length Meter     1400
7 Built up Section Meter 0 1200 1300
8 Length of widening & Strengthening Meter     500
9 Design Speed Kmph 80 80 & 100 80
10 No. of Vehicular Underpass (VUP) No. 0 3 0
11 No. of Light Vehicular Underpass (LVUP) No. 1 0 0
12 No. of Major Bridge No. 1 2 1
13 Length of Major Bridge Meter 60 110, 60 (2 lane) 60
14 No. of Minor Bridge No. 1 0 1
15 Length of Minor Bridge Meter 40 0 45
16 No. of ROB/ RUB No. 0 0 0
17 Length of ROB/ RUB Meter 0 0  
18 No. of River crossing No. 1 1 0
19 No. of Canal crossing No.   0 0
20 No. of Nala crossing No. 1 1 0
21 No. of Pond Filling No. 1 1 2
22 Tree Cutting Impact Minor Medium Medium
Sl. Particulars Unit
No. 1. Shalboni

Option- 1 (Rec.) Option- 2 Option-3


(Flyover)
23 Effect on Building Impact Minor Medium High
24 Rehabilitation / Resettlement Issues Impact Minor Minor High
25 Impact on Agriculture activity Impact Very high Medium N.A
26 Total Civil Cost Cr. 52.45 126.19 120.73
27 Land Acquisition        
Paschim Paschim Paschim
a) Name of District  
Medinipur Medinipur Medinipur

b) Name of Block   Salbani Salbani Salbani


1.Uparkamala 1.Uparkamala 1.Mohanchak
2.Mohanchak 2.Mohanchak 2.Shalbani
c) Name of Mouzas   3.Shalbani 3.Shalbani 3.Chaktarini
4.Tilakhuli 4.Tilakhuli 4.Tilakhuli
5.Pallagote 5.Pallagote 5.Mohanchak

d) Approx area of LA (considering 60m PROW) Sq. mtr. 164149.68 157218.48 28000.00

    Acre 40.56 38.85 6.92


Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Mixed Builtup

f) Market rate Rs/acre   3,93,174.00 47,86,452.00 52,64,919.00


g) Total Land Acquisition Cost (Approx) Rs Rs. 1,59,48,054.98 18,59,51,717.52 3,64,27,772.71
  Factorized Land Value Rs. 1,75,42,860.47 20,45,46,889.27 4,00,70,549.98
  100% solatium Rs. 1,75,42,860.47 20,45,46,889.27 4,00,70,549.98
Sl. Particulars Unit
No. 1. Shalboni

Option- 1 (Rec.) Option- 2 Option-3


(Flyover)
  5 months Interest @12% Rs. 7,97,402.75 92,97,585.88 18,21,388.64
  Total Cost ( In Rs.) Rs. 3,58,83,123.70 41,83,91,364.41 8,19,62,488.60
30 Total cost Cr. 56.04 168.03 128.93
31 Cost/Km Cr. 20.48 64.13 67.86

Sl. Particulars Unit


No. 2. Chandrakona Road

Option- 1 Option- 2 Option-3


(Rec. /Flyover)

1 Side of Bypass   Along Existing Alignment RHS LHS


Sl. Particulars Unit
No. 2. Chandrakona Road

Option- 1 Option- 2 Option-3


(Rec. /Flyover)

2 Start Chainage Km 152+900 152+890 152+700


3 End Chainage Km 160+845 160+300 161+600
4 Total Length Meter 3150 9131.007 9787.354
5 Bypass Length Meter   9131.007 9787.354
6 Flyover Length Meter 2650 0 0
7 Built up Section Meter 2650 0 0
8 Length of widening & Strengthening Meter 500 0 0
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No.   2 3
11 No. of Light Vehicular Underpass (LVUP) No.   1 2
12 No. of Major Bridge No.   1 1
13 Length of Major Bridge Meter   60 60
14 No. of Minor Bridge No.   4 5
15 Length of Minor Bridge Meter   15, 15, 50, 50 30, 50, 20, 20, 50

UC ROB Kubai =2438.12m


16 No. of ROB/ RUB No. UC ROB Kadamdiha 0 2
=2900.059m

17 Length of ROB/ RUB Meter     750, 750


18 No. of River crossing No.   1 1
19 No. of Canal crossing No.      
20 No. of Nala crossing No.   3 4
21 No. of Pond Filling No.     1
Sl. Particulars Unit
No. 2. Chandrakona Road

Option- 1 Option- 2 Option-3


(Rec. /Flyover)

22 Tree Cutting Impact     Very High


23 Effect on Building Impact      
24 Rehabilitation / Resettlement Issues Impact      
25 Impact on Agriculture activity Impact     Very High
26 Total Civil Cost Cr. 235.22 160.19 373.29
27 Land Acquisition        
a) Name of District   Paschim Medinipur Paschim Medinipur Paschim Medinipur

b) Name of Block   Garbeta-III Garbeta-III Garbeta-III


Sl. Particulars Unit
No. 2. Chandrakona Road

Option- 1 Option- 2 Option-3


(Rec. /Flyover)

1.Satbankura 1.Duki 1) Duki


2.Naba Kola (CT) 2.Arabari 2) Arabari
3.Baharashuli 3.Dharmapur 3) Satbankura
4.Bila 4.Barakurya 4) Namjanka
5.Nishchintapur 5.Hati Khana 5) Bila
6.Sarberia 6.Naba Kola (CT) 6) Chandabila
7.Organja 7.Khandi Band 7) Teltaka
8.Baradabcha 8.Chhota Dabcha 8) Borojam
c) Name of Mouzas   9.Baradabcha 9) Nishchintapur
10.Kadamdiha 10) Shirish Danga
11.Paturia 11) Organja
12.Pathrajangal 12) Paturia
13.Pathra 13) Pathrajangal
14) Pathra
15) Bankati
16) Karamsol
17) Nishchintapur

Approx area of LA (considering 60m Sq.


d) 53000.00 547860.42 587241.24
PROW) mtr.
    Acre 13.10 135.38 145.11
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Builtup Agriculture Agriculture
f) Market rate Rs/acre   65,82,596.63 21,57,385.15 19,99,670.82
Sl. Particulars Unit
No. 2. Chandrakona Road

Option- 1 Option- 2 Option-3


(Rec. /Flyover)

g) Total Land Acquisition Cost (Approx) Rs Rs. 8,62,09,674.47 29,20,65,665.02 29,01,73,634.80


  Factorized Land Value Rs. 9,48,30,641.92 32,12,72,231.52 31,91,90,998.28
  100% solatium Rs. 9,48,30,641.92 32,12,72,231.52 31,91,90,998.28
  5 months Interest @12% Rs. 43,10,483.72 1,46,03,283.25 1,45,08,681.74
  Total Cost ( In Rs.) Rs. 19,39,71,767.56 65,71,47,746.30 65,28,90,678.31
30 Total cost Cr. 254.61 225.90 438.58
31 Cost/Km Cr. 80.83 24.74 44.81
Sl. Particulars Unit 3. Garhbeta
No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Along Existing
1 Side of Bypass   RHS RHS
Alignment
2 Start Chainage Km 169+650 170+100 169+650
3 End Chainage Km 172+400 172+100 172+400
4 Total Length Meter 2859.292 2500 2836.85
5 Bypass Length Meter 2859.292   2836.85
6 Flyover Length Meter   2000  
7 Built up Section Meter 100 2000  
8 Length of widening & Strengthening Meter   500  
9 Design Speed Kmph 80 & 100 80 & 100  
10 No. of Vehicular Underpass (VUP) No. 2 0 2
11 No. of Light Vehicular Underpass (LVUP) No. 0 0  
12 No. of Major Bridge No. 0 0  
13 Length of Major Bridge Meter 0 0  
14 No. of Minor Bridge No. 1 0 1
15 Length of Minor Bridge Meter 30 0 30
16 No. of ROB/ RUB No. 0 0  
17 Length of ROB/ RUB Meter 0 0  
18 No. of River crossing No. 0 0  
19 No. of Canal crossing No. 0 0  
20 No. of Nala crossing No. 3 0 3
21 No. of Pond Filling No. 2 0 2
22 Tree Cutting Impact Low Medium  
Sl. Particulars Unit 3. Garhbeta
No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
23 Effect on Building Impact Low Very High  
24 Rehabilitation / Resettlement Issues Impact Minor Very High  
25 Impact on Agriculture activity Impact Very High Very Low  
26 Total Civil Cost Cr. 78.76 171.70 78.58
27 Land Acquisition        
a) Name of District   Paschim Medinipur Paschim Medinipur  
b) Name of Block   Garbeta-1 Garbeta-1  
1)Lapuriya 1)Sijdiha
2)Sijdiha 2)Panchamoledanga
3)Panchamoledanga 3)Ghorapota
4)Khudiasol 4)Bheduyashol
5)Bheduyashol 5)Khiriya
c) Name of Mouzas   6)Sangramchak 6)Chhotatalbeta  
7)Khiriya 7)Hinggishol
8)Chhotatalbeta 8)Patpur
9)Hinggishol
10)Patpur
Approx area of LA (considering 60m
d) Sq. mtr. 171557.52 40000.00  
PROW)
    Acre 42.39 9.88  
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Builtup  
f) Market rate Rs/acre   26,49,842.10 56,47,522.50  
g) Total Land Acquisition Cost (Approx) Rs Rs. 11,23,34,368.48 5,58,21,416.66  
Sl. Particulars Unit 3. Garhbeta
No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
  Factorized Land Value Rs. 12,35,67,805.32 6,14,03,558.32  
  100% solatium Rs. 12,35,67,805.32 6,14,03,558.32  
  5 months Interest @12% Rs. 56,16,718.42 27,91,070.83  
  Total Cost ( In Rs.) Rs. 25,27,52,329.07 12,55,98,187.48  
30 Total cost Cr. 104.04 184.26 78.58
31 Cost/Km Cr. 36.39 73.70 27.70
Sl. Particulars Unit 4. Chaubetya Bakradaha
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Along Existing
1 Side of Bypass   LHS LHS
Alignment
2 Start Chainage Km 181+800 182+000 182+500
3 End Chainage Km 185+380 185+380 185+000
4 Total Length Meter 3702.523 3389.735 2500
5 Bypass Length Meter 3702.523 3389.735  
6 Flyover Length Meter     2000
7 Built up Section Meter 0 260 2400
8 Length of widening & Strengthening Meter     500
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 2 3 0
No. of Light Vehicular Underpass
11 No. 0 0 0
(LVUP)
12 No. of Major Bridge No. 1 1 0
13 Length of Major Bridge Meter 65 65 0
14 No. of Minor Bridge No. 3 1 0
15 Length of Minor Bridge Meter 40, 50 & 50 50 0
16 No. of ROB/ RUB No. 0 0 0
17 Length of ROB/ RUB Meter 0 0 0
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 0 0 0
20 No. of Nala crossing No. 4 2 0
21 No. of Pond Filling No. 0 2 4
22 Tree Cutting Impact Low Low Medium
23 Effect on Building Impact Nil Midium Very High
Sl. Particulars Unit 4. Chaubetya Bakradaha
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
24 Rehabilitation / Resettlement Issues Impact Nil Midium Very High
25 Impact on Agriculture activity Impact Very high Very high Low
26 Total Civil Cost Cr. 93.98 119.09 171.70
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura

b) Name of Block   Bishnupur Bishnupur Bishnupur


1)Chaubeta 1)Chaubeta 1)Chaubeta
2)ChhotaBankadaha 2)ChhotaBankadaha 2)ChhotaBankadaha
c) Name of Mouzas   3)Dombara 3)Dombara 3)Dombara
4)Majdiha 4)Majdiha 4)Majdiha
5)Hetagara 5)Hetagara 5)Hetagara

Approx area of LA (considering 60m


d) Sq. mtr. 222151.38 203384.10 40000.00
PROW)
    Acre 54.89 50.26 9.88
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Mixed Builtup
f) Market rate Rs/acre   3,16,969.20 41,46,973.20 22,80,830.40
g) Total Land Acquisition Cost (Approx) Rs Rs. 1,73,99,988.93 20,84,16,030.25 2,25,44,254.42
  Factorized Land Value Rs. 1,91,39,987.82 22,92,57,633.27 2,47,98,679.86
  100% solatium Rs. 1,91,39,987.82 22,92,57,633.27 2,47,98,679.86
  5 months Interest @12% Rs. 8,69,999.45 1,04,20,801.51 11,27,212.72
  Total Cost ( In Rs.) Rs. 3,91,49,975.09 46,89,36,068.06 5,07,24,572.45
Sl. Particulars Unit 4. Chaubetya Bakradaha
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
30 Total cost Cr. 97.90 165.98 176.77
31 Cost/Km Cr. 26.44 48.97 70.71

Sl. Particulars Unit 5. Bishnupur


No.
Option- 1 Option- 2 Option-3
(Rec.)

1 Side of Bypass   LHS LHS LHS


Sl. Particulars Unit 5. Bishnupur
No.
Option- 1 Option- 2 Option-3
(Rec.)
2 Start Chainage Km 190+770 192+400 193+100
3 End Chainage Km 197+360 196+000 195+600
4 Total Length Meter 7918.661 4000 2619.473
5 Bypass Length Meter 7918.661 4000 2619.473
6 Flyover Length Meter      
7 Built up Section Meter 0 600 700
8 Length of widening & Strengthening Meter      
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 2 1 1
11 No. of Light Vehicular Underpass (LVUP) No. 3 2 1
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter 0 0 0
14 No. of Minor Bridge No. 2 0  
15 Length of Minor Bridge Meter 40, 40 0  
16 No. of ROB/ RUB No. 1 1 1
17 Length of ROB/ RUB Meter 750 750 750
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 0 0 0
20 No. of Nala crossing No. 1 2 0
21 No. of Pond Filling No. 2 0 1
22 Tree Cutting Impact Low Very high Very high
23 Effect on Building Impact Nil Low Low
24 Rehabilitation / Resettlement Issues Impact Nil Low Nil
25 Impact on Agriculture activity Impact Very high Nil Nil
Sl. Particulars Unit 5. Bishnupur
No.
Option- 1 Option- 2 Option-3
(Rec.)
26 Total Civil Cost Cr. 266.16 184.02 150.34
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura

b) Name of Block   Bishnupur Bishnupur Bishnupur


1)Benachapra 1)Bishnupur 1)Bishnupur
2)Kharikashuli 2)Ghughimura 2)Ghughimura
3)Ghughimura 3)Jharia 3)Jamunabandh
4)Jiabandi 4)Kusum Bani
5)Bankati 5)Jamunabandh
c) Name of Mouzas   6)Kusum Bani
7)Dwadas Bari
8)Jamunabandh
9)Churamanipur
10)Kelemele

d) Approx area of LA (considering 60m PROW) Sq. mtr. 475119.66 240000.00 157168.38
    Acre 117.40 59.31 38.84
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Mixed
f) Market rate Rs/acre   7,42,482.50 12,08,147.40 1,11,41,712.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 8,71,71,017.69 7,16,49,647.50 43,27,13,054.71
  Factorized Land Value Rs. 9,58,88,119.46 7,88,14,612.25 47,59,84,360.18
  100% solatium Rs. 9,58,88,119.46 7,88,14,612.25 47,59,84,360.18
Sl. Particulars Unit 5. Bishnupur
No.
Option- 1 Option- 2 Option-3
(Rec.)
  5 months Interest @12% Rs. 43,58,550.88 35,82,482.38 2,16,35,652.74
  Total Cost ( In Rs.) Rs. 19,61,34,789.81 16,12,11,706.88 97,36,04,373.10
30 Total cost Cr. 285.77 200.14 247.70
31 Cost/Km Cr. 36.09 50.03 94.56

Sl. Particulars Unit 6. Onda


No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Along Existing
1 Side of Bypass   LHS RHS
Alignment
2 Start Chainage Km 206+600 207+100 206+800
3 End Chainage Km 211+200 210+700 212+300
4 Total Length Meter 4815.276 3600 6406.097
Sl. Particulars Unit 6. Onda
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
5 Bypass Length Meter 4815.276   6406.097
6 Flyover Length Meter   3100  
7 Built up Section Meter 160 3000 50
8 Length of widening & Strengthening Meter   500  
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 1 0 1
11 No. of Light Vehicular Underpass (LVUP) No. 1 0 0
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter 0 0 0
14 No. of Minor Bridge No. 1   1
15 Length of Minor Bridge Meter 40   40
16 No. of ROB/ RUB No. 0 0 2
17 Length of ROB/ RUB Meter 0 0 750, 750
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 2 0 5
20 No. of Nala crossing No. 0 0 0
21 No. of Pond Filling No. 12 4 8
22 Tree Cutting Impact Nil Medium Very Low
23 Effect on Building Impact Low High Very Low
24 Rehabilitation / Resettlement Issues Impact Minor High Very Low
25 Impact on Agriculture activity Impact Very High Very Low Very High
26 Total Civil Cost Cr. 89.48 279.19 237.87
27 Land Acquisition        
Sl. Particulars Unit 6. Onda
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)

a) Name of District   Bankura Bankura Bankura

b) Name of Block   Onda Onda Onda


1)Khamarberiya 1)Punthiya 1)Khamarberiya
2)Kustha 2)Gogra 2)Kustha
3)Gogra 3)Onda 3)Gogra
4)Onda 4)Raghunathnagar 4)Onda
c) Name of Mouzas   5)Raghunathnagar 5)Punthiya 5)Kumar Danga
6)Chandrakona 6)Tella 6)Dhagarya
7)Tella 7)Chandrakona 7)Sadistha
8)Sadistha 8)Jamtara
9)Chandipur
Approx area of LA (considering 60m
d) Sq. mtr. 288916.56 62000.00 384365.82
PROW)
    Acre 71.39 15.32 94.98
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Builtup Agriculure
f) Market rate Rs/acre   6,43,170.63 67,74,192.33 5,77,539.22
g) Total Land Acquisition Cost (Approx) Rs Rs. 4,59,17,848.32 10,37,84,406.31 5,48,54,105.47
  Factorized Land Value Rs. 5,05,09,633.15 11,41,62,846.94 6,03,39,516.02
  100% solatium Rs. 5,05,09,633.15 11,41,62,846.94 6,03,39,516.02
  5 months Interest @12% Rs. 22,95,892.42 51,89,220.32 27,42,705.27
  Total Cost ( In Rs.) Rs. 10,33,15,158.72 23,35,14,914.19 12,34,21,737.31
30 Total cost Cr. 99.81 302.54 250.21
Sl. Particulars Unit 6. Onda
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
31 Cost/Km Cr. 20.73 84.04 39.06

Sl. Particulars Unit 7. Bankura


No.
Option- 1 Option- 2 Option-3
(Rec.)
1 Side of Bypass   RHS RHS RHS
2 Start Chainage Km 220+000 221+650 216+250
3 End Chainage Km 233+600 233+600 233+600
4 Total Length Meter 10000 10205.729 12994.689
Sl. Particulars Unit 7. Bankura
No.
Option- 1 Option- 2 Option-3
(Rec.)
5 Bypass Length Meter 10000 10205.729 12994.689
6 Flyover Length Meter      
7 Built up Section Meter 500 1000 150
8 Length of widening & Strengthening Meter      
9 Design Speed Kmph 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 5 6 4
11 No. of Light Vehicular Underpass (LVUP) No. 4 3 5
12 No. of Major Bridge No. 2 2 1
13 Length of Major Bridge Meter 700, 400 450, 350 400
14 No. of Minor Bridge No. 2 2 3
15 Length of Minor Bridge Meter 20, 40 20,40 30, 40,40
16 No. of ROB/ RUB No. 2 2 2
17 Length of ROB/ RUB Meter 750, 750 750, 750 750, 750
18 No. of River crossing No. 2 2 1
19 No. of Canal crossing No. 1 3 4
20 No. of Nala crossing No. 2 1 3
21 No. of Pond Filling No. 1 15 9
22 Tree Cutting Impact Low Low Nil
23 Effect on Building Impact Nil Low Nil
24 Rehabilitation / Resettlement Issues Impact Nil Minor Nil
25 Impact on Agriculture activity Impact Very high Very high Very high
26 Total Civil Cost Cr. 608.00 576.66 537.78
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura
Sl. Particulars Unit 7. Bankura
No.
Option- 1 Option- 2 Option-3
(Rec.)
Onda, Bankura-I &
b) Name of Block   Onda & Bankura-II Onda & Bankura-II
Bankura-II
1)Malatore 1)Kamala 1)Dhabani
2)Bagjata 2)Rasunkur 2)Manipur
3)Surpanagar 3)Garerban 3)Bheduyashol
4)Garerban 4)Ekteswar 4)Ramnagar
5)Ekteswar 5)Sankarhati 5)Kamalpur
6)Bhadul 6)Syamdaspur 6)Sayer Bankra
7)Sanbanda 7)Bhadul 7)Bhimpur
8)Bejgram 8)Sanbanda 8)Jagannathpur
9)Mobarakpur 9)Mobarakpur 9)Santor
10)Kuraria 10)Chapatara 10)Birsinghapur
11)Domonbandi 11)Katnar 11)Ola
12)JagannathBati 12)Bikna 12)Pratappur
13)Raghunathpur 13)Kuraria 13)Ailta
c) Name of Mouzas  
14)Domonbandi 14)Matranga
15)JagannathBati 15)Bidyadharpur
16)Raghunathpur 16)Adra
17)Banki
18)Sendra
19)Chapatara
20)Mobarakpur
21)Katnar
22)Bikna
23)Kuraria
24)Domonbandi
25)JagannathBati
26)Raghunathpur
Sl. Particulars Unit 7. Bankura
No.
Option- 1 Option- 2 Option-3
(Rec.)
Approx area of LA (considering 60m
d) Sq. mtr. 600000.00 612343.74 779681.34
PROW)
    Acre 148.26 151.31 192.66
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Mixed Agriculture
f) Market rate Rs/acre   13,00,695.00 1,72,38,625.06 7,78,596.48
g) Total Land Acquisition Cost (Approx) Rs Rs. 19,28,45,546.54 2,60,84,39,685.99 15,00,07,325.91
  Factorized Land Value Rs. 21,21,30,101.19 2,86,92,83,654.58 16,50,08,058.50
  100% solatium Rs. 21,21,30,101.19 2,86,92,83,654.58 16,50,08,058.50
  5 months Interest @12% Rs. 96,42,277.33 13,04,21,984.30 75,00,366.30
  Total Cost ( In Rs.) Rs. 43,39,02,479.71 5,86,89,89,293.47 33,75,16,483.29
30 Total cost Cr. 651.39 1,163.56 571.53
31 Cost/Km Cr. 65.14 114.01 43.98

Sl. Particulars Unit 8. Gangajalghati


No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Along Existing
1 Side of Bypass   LHS RHS
Alignment
Sl. Particulars Unit 8. Gangajalghati
No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
2 Start Chainage Km 250+300 250+300 250+550
3 End Chainage Km 253+800 254+050 253+350
4 Total Length Meter 3421.024 4215.63 2800
5 Bypass Length Meter 3421.024 4215.63  
6 Flyover Length Meter     2300
7 Built up Section Meter 300 35 2400
8 Length of widening & Strengthening Meter     500
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 2 3 0
11 No. of Light Vehicular Underpass (LVUP) No. 1 0 0
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
14 No. of Minor Bridge No. 1 1 1
15 Length of Minor Bridge Meter 20 20 20
16 No. of ROB/ RUB No. 0 0 0
17 Length of ROB/ RUB Meter      
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 1 1 1
20 No. of Nala crossing No. 0 0 0
21 No. of Pond Filling No. 3 3 2
22 Tree Cutting Impact Low Low  
23 Effect on Building Impact Very low Very low  
24 Rehabilitation / Resettlement Issues Impact Minor Minor  
25 Impact on Agriculture activity Impact Very high Very high  
Sl. Particulars Unit 8. Gangajalghati
No. Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
26 Total Civil Cost Cr. 105.72 117.55 201.01
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura

b) Name of Block   Gangajalghati Gangajalghati Gangajalghati


1)Mandi 1)Mandi 1)Mandi
2)Gangajal Ghati 2)Gangajal Ghati 2)Gangajal Ghati
c) Name of Mouzas   3)Deuli 3)Deuli 3)Deuli
4)Latiabani 4)Latiabani 4)Latiabani

d) Approx area of LA (considering 60m PROW) Sq. mtr. 205261.44 252937.80 46000.00
    Acre 50.72 62.50 11.37
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Builtup
f) Market rate Rs/acre   5,71,050.00 5,71,050.00 64,80,000.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 2,89,64,390.90 3,56,91,990.24 7,36,57,289.00
  Factorized Land Value Rs. 3,18,60,829.99 3,92,61,189.26 8,10,23,017.90
  100% solatium Rs. 3,18,60,829.99 3,92,61,189.26 8,10,23,017.90
  5 months Interest @12% Rs. 14,48,219.54 17,84,599.51 36,82,864.45
  Total Cost ( In Rs.) Rs. 6,51,69,879.52 8,03,06,978.03 16,57,28,900.26
30 Total cost Cr. 112.24 125.58 217.59
31 Cost/Km Cr. 32.81 29.79 77.71
Sl. Particulars Unit 9. Durlavpur
No.
Option- 1 Option- 2 Option-3
(Rec.) (Bypass & Flyover)

Along Existing
1 Side of Bypass   LHS LHS
Alignment
2 Start Chainage Km 257+600 257+600 257+600
3 End Chainage Km 261+600 260+900 260+900
4 Total Length Meter 3570.754 2946.917 3185
5 Bypass Length Meter 3570.754 2946.917 1935
6 Flyover Length Meter     1000
7 Built up Section Meter 225 350 1150
8 Length of widening & Strengthening Meter     250
Sl. Particulars Unit 9. Durlavpur
No.
Option- 1 Option- 2 Option-3
(Rec.) (Bypass & Flyover)

9 Design Speed Kmph 80 & 100 80 & 100 80


10 No. of Vehicular Underpass (VUP) No. 2 1 0
11 No. of Light Vehicular Underpass (LVUP) No. 0 0  
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
14 No. of Minor Bridge No. 0 0 0
15 Length of Minor Bridge Meter      
16 No. of ROB/ RUB No. 1 1 1
17 Length of ROB/ RUB Meter 750 750 750
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 0 0 0
20 No. of Nala crossing No. 0 0 0
21 No. of Pond Filling No. 4 3 3
22 Tree Cutting Impact Low Low Low
23 Effect on Building Impact Low Low Medium
24 Rehabilitation / Resettlement Issues Impact Minor Minor Midium
25 Impact on Agriculture activity Impact Very high High High
26 Total Civil Cost Cr. 163.45 130.67 166.64
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura

b) Name of Block   Gangajalghati Gangajalghati Gangajalghati


Sl. Particulars Unit 9. Durlavpur
No.
Option- 1 Option- 2 Option-3
(Rec.) (Bypass & Flyover)

1)Nandanpur 1)Nandanpur 1)Nandanpur


2)Nidhirampur 2)Nidhirampur 2)Nidhirampur
c) Name of Mouzas   3)Durlabhpur 3)Durlabhpur 3)Durlabhpur
4)Benagari 4)Benagari 4)Benagari
5)Panktor 5)Panktor 5)Panktor

d) Approx area of LA (considering 60m PROW) Sq. mtr. 214245.24 176815.02 136100.00
    Acre 52.94 43.69 33.63
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Mixed Mixed
f) Market rate Rs/acre   4,73,850.00 71,07,750.00 71,07,750.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 2,50,86,204.57 31,05,51,900.47 23,90,41,421.11
  Factorized Land Value Rs. 2,75,94,825.03 34,16,07,090.51 26,29,45,563.22
  100% solatium Rs. 2,75,94,825.03 34,16,07,090.51 26,29,45,563.22
  5 months Interest @12% Rs. 12,54,310.23 1,55,27,595.02 1,19,52,071.06
  Total Cost ( In Rs.) Rs. 5,64,43,960.29 69,87,41,776.05 53,78,43,197.49
30 Total cost Cr. 169.09 200.54 220.42
31 Cost/Km Cr. 47.36 68.05 69.21
Sl. Particulars Unit
No. 10. Mejia-Shyampur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover +
Bypass)

1 Side of Bypass   RHS LHS RHS


2 Start Chainage Km 268+600 268+600 268+600
3 End Chainage Km 272+750 274+931 272+750
4 Total Length Meter 3935.477 6818.109 3882.348
5 Bypass Length Meter 2535.477 4555.371 1266.289
6 Flyover Length Meter 1800 979 2616.059
7 Built up Section Meter 800 350 2000
8 Length of widening & Strengthening Meter      
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 2 4 1
11 No. of Light Vehicular Underpass (LVUP) No. 1 0 1
Sl. Particulars Unit
No. 10. Mejia-Shyampur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover +
Bypass)
12 No. of Major Bridge No. 1 2  
13 Length of Major Bridge Meter 70 60, 1000  
14 No. of Minor Bridge No. 0 0 0
15 Length of Minor Bridge Meter      
16 No. of ROB/ RUB No. 0 2 0
17 Length of ROB/ RUB Meter   750, 750  
18 No. of River crossing No. 1 1  
19 No. of Canal crossing No.   0  
20 No. of Nala crossing No. 3 1  
21 No. of Pond Filling No. 7 6  
22 Tree Cutting Impact Low Medium  
23 Effect on Building Impact Low Low  
24 Rehabilitation / Resettlement Issues Impact Minor Minor  
25 Impact on Agriculture activity Impact Low Medium  
26 Total Civil Cost Cr. 252.19 519.52 81.84
27 Land Acquisition        
a) Name of District   Bankura Bankura Bankura

b) Name of Block   Mejhia Mejhia Mejhia


Sl. Particulars Unit
No. 10. Mejia-Shyampur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover +
Bypass)
1)Mejiya 1)Mejiya 1)Mejiya
2)Tarapur 2)Tarapur 2)Tarapur
3)Chuaberia 3)Chuaberia 3)Chuaberia
c) Name of Mouzas   4)Jemua 4)Jemua 4)Jemua
5)Shyamapur 5)Shyamapur 5)Shyamapur
6)Gopalpur 6)Gopalpur 6)Gopalpur

d) Approx area of LA (considering 60m PROW) Sq. mtr. 236128.62 409086.54 128298.52
    Acre 58.35 101.09 31.70
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Mixed Mixed Builtup
f) Market rate Rs/acre   1,44,58,500.17 1,50,35,625.17 60,87,150.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 84,36,35,343.94 1,51,99,15,953.44 19,29,82,773.27
  Factorized Land Value Rs. 92,79,98,878.33 1,67,19,07,548.78 21,22,81,050.60
  100% solatium Rs. 92,79,98,878.33 1,67,19,07,548.78 21,22,81,050.60
  5 months Interest @12% Rs. 4,21,81,767.20 7,59,95,797.67 96,49,138.66
  Total Cost ( In Rs.) Rs. 1,89,81,79,523.87 3,41,98,10,895.23 43,42,11,239.86
30 Total cost Cr. 442.01 861.50 125.26
31 Cost/Km Cr. 112.31 126.35 32.26
Sl. Particulars Unit
11. Kenda-Haripur
No.
Option- 1 Option- 2 Option-3
(Rec.)

1 Side of Bypass   LHS LHS LHS


2 Start Chainage Km 288+100 288+100 288+100
3 End Chainage Km 294+300 294+400 295+800
4 Total Length Meter 4495.346 4629.575 6233.537
5 Bypass Length Meter 4495.346 4629.575 6233.537
6 Flyover Length Meter      
7 Built up Section Meter 400 Nil Nil
8 Length of widening & Strengthening Meter      
9 Design Speed Kmph 100 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 4 4 3
11 No. of Light Vehicular Underpass (LVUP) No. 1 1 2
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
Sl. Particulars Unit
11. Kenda-Haripur
No.
Option- 1 Option- 2 Option-3
(Rec.)
14 No. of Minor Bridge No. 0 0 0
15 Length of Minor Bridge Meter      
16 No. of ROB/ RUB No. 0 0 0
17 Length of ROB/ RUB Meter      
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 0 0 0
20 No. of Nala crossing No. 0 0 1
21 No. of Pond Filling No. 10 7 8
22 Tree Cutting Impact Low Low  
23 Effect on Building Impact Low Nil  
24 Rehabilitation / Resettlement Issues Impact Minor Nil  
25 Impact on Agriculture activity Impact Medium Medium  
26 Total Civil Cost Cr. 169.86 170.96 178.80
27 Land Acquisition        
Paschim
a) Name of District   Paschim Bardhaman Paschim Bardhaman
Bardhaman
Jamuria & Jamuria &
b) Name of Block   Jamuria
Pandabeswar Pandabeswar
1)Chakdala 1)Chakdala 1)Chakdala
2)Kenda 2)Kenda 2)Kenda
c) Name of Mouzas   3)Dobrana 3)Dobrana 3)Dobrana
4)Dahuka 4)Dahuka 4)Dahuka
5)Haripur
Sl. Particulars Unit
11. Kenda-Haripur
No.
Option- 1 Option- 2 Option-3
(Rec.)

d) Approx area of LA (considering 60m PROW) Sq. mtr. 269720.76 277774.50 374012.22
    Acre 66.65 68.64 92.42
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Agriculture
f) Market rate Rs/acre   6,68,663.20 3,54,780.00 6,82,830.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 4,45,66,106.10 2,43,51,986.63 6,31,07,543.94
  Factorized Land Value Rs. 4,90,22,716.71 2,67,87,185.30 6,94,18,298.33
  100% solatium Rs. 4,90,22,716.71 2,67,87,185.30 6,94,18,298.33
  5 months Interest @12% Rs. 22,28,305.31 12,17,599.33 31,55,377.20
  Total Cost ( In Rs.) Rs. 10,02,73,738.73 5,47,91,969.93 14,19,91,973.86
30 Total cost Cr. 179.88 176.44 193.00
31 Cost/Km Cr. 40.02 38.11 30.96
Sl. Particulars Unit
No. 12. Mallarpur & Fatehpur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover)
Along Existing
1 Side of Bypass   LHS RHS
Alignment
2 Start Chainage Km 370+900 370+900 370+900
3 End Chainage Km 375+900 375+900 374+864
4 Total Length Meter 3731.942 5790.657 3977.651
5 Bypass Length Meter 3731.942 5790.657  
6 Flyover Length Meter     3477.651
7 Built up Section Meter 400 350 2200
8 Length of widening & Strengthening Meter     500
9 Design Speed Kmph 80 & 100 80 & 100 80 & 100
10 No. of Vehicular Underpass (VUP) No. 1 2 0
11 No. of Light Vehicular Underpass (LVUP) No. 0 1 0
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
14 No. of Minor Bridge No. 1 2 0
15 Length of Minor Bridge Meter 10 10, 25  
Sl. Particulars Unit
No. 12. Mallarpur & Fatehpur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover)

16 No. of ROB/ RUB No. 1 1 1


17 Length of ROB/ RUB Meter 750 750 750
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 1 2 0
20 No. of Nala crossing No. 0 0 0
21 No. of Pond Filling No. 5 6 9
22 Tree Cutting Impact Nil    
23 Effect on Building Impact Low Low  
24 Rehabilitation / Resettlement Issues Impact Minor Minor  
25 Impact on Agriculture activity Impact Very High Very High  
26 Total Civil Cost Cr. 149.02 233.28 418.86
27 Land Acquisition        
a) Name of District   Birbhum Birbhum Birbhum

b) Name of Block   Mayureswar-1 Mayureswar-1 Mayureswar-1


1)Mallarpur 1.Mallarpur 1.Mallarpur
2)Fatehpur (CT) 2.Fatehpur (CT) 2.Fatehpur (CT)
c) Name of Mouzas  
3)Amba 3.Bahina 3.Bahina
4.Amba 4.Amba
d) Approx area of LA (considering 60m PROW) Sq. mtr. 223916.52 347439.42 69553.02
    Acre 55.33 85.85 17.19
Sl. Particulars Unit
No. 12. Mallarpur & Fatehpur

Option- 1 Option- 2 Option-3


(Rec.) (Flyover)
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Builtup
f) Market rate Rs/acre   5,94,748.00 7,96,513.67 2,65,504.56
g) Total Land Acquisition Cost (Approx) Rs Rs. 3,29,08,040.19 6,83,84,112.67 45,63,214.27
  Factorized Land Value Rs. 3,61,98,844.21 7,52,22,523.94 50,19,535.70
  100% solatium Rs. 3,61,98,844.21 7,52,22,523.94 50,19,535.70
  5 months Interest @12% Rs. 16,45,402.01 34,19,205.63 2,28,160.71
  Total Cost ( In Rs.) Rs. 7,40,43,090.42 15,38,64,253.51 1,02,67,232.10
30 Total cost Cr. 156.42 248.67 419.89
31 Cost/Km Cr. 41.91 42.94 105.56
Sl. Particulars Unit
13. Rampurhat
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Along Existing
1 Side of Bypass   RHS LHS
Alignment
2 Start Chainage Km 383+153 382+800 383+200
3 End Chainage Km 388+550 390+300 388+300
4 Total Length Meter 6242.691 9830.248 5100
5 Bypass Length Meter 6242.691 9830.248  
6 Flyover Length Meter     4600
7 Built up Section Meter 350 500 5100
8 Length of widening & Strengthening Meter     500
9 Design Speed Kmph 80 & 100 80 & 100 80
10 No. of Vehicular Underpass (VUP) No. 5 5 0
11 No. of Light Vehicular Underpass (LVUP) No. 4 1 0
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
14 No. of Minor Bridge No. 1 0 0
15 Length of Minor Bridge Meter 15    
16 No. of ROB/ RUB No. 0 2 0
17 Length of ROB/ RUB Meter   750 ,750  
18 No. of River crossing No. 0 0  
19 No. of Canal crossing No. 2 2  
20 No. of Nala crossing No. 1 2  
21 No. of Pond Filling No. 3 9  
22 Tree Cutting Impact Nil. Nil  
23 Effect on Building Impact Low Low  
Sl. Particulars Unit
13. Rampurhat
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
24 Rehabilitation / Resettlement Issues Impact Minor Minor  
25 Impact on Agriculture activity Impact Very High Very High  
26 Total Civil Cost Cr. 354.10 456.90 546.79
27 Land Acquisition        
a) Name of District   Birbhum Birbhum Birbhum

b) Name of Block   Rampurhat-1 Rampurhat-1 Rampurhat-1


1.Barshal 1.Barshal 1.Barshal
2.Sialdanga 2.Shrikrishnapur 2.Shrikrishnapur
3.Kumudda Pakhuria Pakhuria
4.Bagtui 3.Jendur 3.Sialdanga
5.Kalisara 4.Magura 4.Bagtui
6.Dangram 5.Kalikapur 5.Rampurhat(M)
7.Brahmanigram 6.Dakshin Shibpur 6.Joykrishnapur
c) Name of Mouzas   8.Rampurhat(M) 7.Banhat 7.Batail
9.Joykrishnapur 8.Nischintapur
10.Batail 9.Ramrampur
10.Kusumba
11.Chhitaspur
12.Akhira
13.Tilai
14.Kabilpur

d) Approx area of LA (considering 60m PROW) Sq. mtr. 374561.46 589814.88 92000.00
    Acre 92.56 145.75 22.73
Sl. Particulars Unit
13. Rampurhat
No.
Option- 1 Option- 2 Option-3
(Rec.) (Flyover)
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Builtup
f) Market rate Rs/acre   1,73,18,475.00 1,08,42,954.55 2,82,16,350.00
g) Total Land Acquisition Cost (Approx) Rs Rs. 1,60,29,33,956.28 1,58,03,24,433.59 64,14,62,915.60
  Factorized Land Value Rs. 1,76,32,27,351.91 1,73,83,56,876.95 70,56,09,207.16
  100% solatium Rs. 1,76,32,27,351.91 1,73,83,56,876.95 70,56,09,207.16
  5 months Interest @12% Rs. 8,01,46,697.81 7,90,16,221.68 3,20,73,145.78
  Total Cost ( In Rs.) Rs. 3,60,66,01,401.63 3,55,57,29,975.58 1,44,32,91,560.10
30 Total cost Cr. 714.76 812.47 691.12
31 Cost/Km Cr. 114.50 82.65 135.51
Sl. Particulars Unit
No. 14. Nalhati

Option- 1 Option- 2 Option-3


(Rec.)

1 Side of Bypass   RHS RHS RHS


2 Start Chainage Km 399+100 399+100 398+533
3 End Chainage Km 403+400 403+400 405+300
4 Total Length Meter 3230 3490 5048
5 Bypass Length Meter 3230 3621.968 5048
6 Flyover Length Meter      
7 Built up Section Meter 850 400 900
8 Length of widening & Strengthening Meter      
9 Design Speed Kmph 80 &100 80 &100 80 &100
10 No. of Vehicular Underpass (VUP) No. 1 1 1
11 No. of Light Vehicular Underpass (LVUP) No. 1 1 2
12 No. of Major Bridge No. 0 0 0
13 Length of Major Bridge Meter      
14 No. of Minor Bridge No. 2 2 2
15 Length of Minor Bridge Meter 20, 10 20, 10 20, 10
16 No. of ROB/ RUB No. 0 0 0
17 Length of ROB/ RUB Meter      
18 No. of River crossing No. 0 0 0
19 No. of Canal crossing No. 1 1 1
20 No. of Nala crossing No. 1 1 1
21 No. of Pond Filling No. 3 1 4
22 Tree Cutting Impact Low Nil Low
Sl. Particulars Unit
No. 14. Nalhati

Option- 1 Option- 2 Option-3


(Rec.)
23 Effect on Building Impact Medium Medium Medium
24 Rehabilitation / Resettlement Issues Impact Medium Medium Medium
25 Impact on Agriculture activity Impact Very High Very High Very High
26 Total Civil Cost Cr. 101.18 99.03 147.51
27 Land Acquisition        
a) Name of District   Birbhum Birbhum Birbhum

b) Name of Block   Nalhati-I Nalhati-I Nalhati-I


1.Nalhati (M) 1.Nalhati (M) 1.Painta
2.Kalitha 2.Kalitha 2.Haripur Podhra
c) Name of Mouzas   3.Nalhati (M)
4.Atgram
5.Kalitha

d) Approx area of LA (considering 60m PROW) Sq. mtr. 193800.00 209400.00 302880.00
    Acre 47.89 51.74 74.84
Predominant land use
e) pattern(Agricultural/Builtup/Mixed)   Agriculture Agriculture Agriculture
f) Market rate Rs/acre   1,03,64,922.00 1,03,64,922.00 49,23,568.80
g) Total Land Acquisition Cost (Approx) Rs Rs. 49,63,66,775.05 53,63,21,995.33 36,84,96,612.96
  Factorized Land Value Rs. 54,60,03,452.55 58,99,54,194.86 40,53,46,274.25
  100% solatium Rs. 54,60,03,452.55 58,99,54,194.86 40,53,46,274.25
Sl. Particulars Unit
No. 14. Nalhati

Option- 1 Option- 2 Option-3


(Rec.)
  5 months Interest @12% Rs. 2,48,18,338.75 2,68,16,099.77 1,84,24,830.65
  Total Cost ( In Rs.) Rs. 1,11,68,25,243.86 1,20,67,24,489.49 82,91,17,379.15
30 Total cost Cr. 212.87 219.70 230.42
31 Cost/Km Cr. 65.90 62.95 45.65