Wärtsilä - The Total LNG Solution Provider
Wärtsilä - The Total LNG Solution Provider
2015
[  ENERGY / IN DETAIL ] 
                                                                                                                                                 P L AT F O R M S U P P LY
                                                                                                                                                 VESSEL (PSV)
                                                                                                                                                                                                                                                    LARGE TERMINAL                                                                                                                    2003                                                                                                            2018
                                                                     POWER PLANT                    LARGE
                                                                                                                                                                                                                                                                                                   POWER PLANT                                                                        Small scale liquefaction                      2010                                                              Delivery of small scale
                                                                                                    L I Q U E FA C T I O N
                                                                                                    PLANT                                                                                         SMALL LNG CARRIER                                                                                                                                                                   plant (Snurrevarden,                          Small scale liquefaction                                          terminal (Tornio, Finland)
                                                                                                                                                                                                                                                                                                                                                                                      Norway)                                       plant (Kilpilahti, Finland)                                       UNDER CONSTRUCTION
                                                                                                                                                       LNG CARRIER                                                                  R E L I Q U E FA C T I O N
                                                                                                                                                                                                                                    UNIT
                                                                                                                                                                                                                                                                    R E G A S I F I C AT I O N
                                                                                                                R E L I Q U E FA C T I O N U N I T                                                                                                                  UNIT
                                          LNG PEAK
                                                                                   PA S S E N G E R S H I P
                                                                                                                                                                                                                                                                                                      S AT E L L I T E A N D
                                                                                                                                                                                                                                                                                                                                                L I Q U E FA C T I O N
                                                                                                                                                                                                                                                                                                                                                PLANT                                                                     13 off-shore re-gasification systems for FSRUs and Jettys
                                          S H AV I N G P L A N T
                                                                                                                                                                                                                                                                                                      BUNKERING TERMINAL
                                                                                                                                                                                                                               S AT E L L I T E
                                                                                                                                                                                                                               TERMINAL                                       BUNKERING
                                                                                                                                                                                                                                                                              VESSEL
                                                                                                                                                                                                                                                                                                                               LBG FILLING
                                                                                                                                                                                                                                                                                                                                                                                    2002                                        2012                                                     2015
                                                                                                                                                                             POWER BARGE                                                                                                                                       S TAT I O N
                                                                                                                                                                                                                                                                                                                                                                                    Hamworthy enters the                        Wärtsilä acquires Hamworthy                              Launch of Wärtsilä’s
                                  S AT E L L I T E T E R M I N A L
                                                                                                                                                                                                                                                                                                                                                                                    LNG business                                (currently Wärtsilä Gas                                  expanded LNG
                                                                                                                                                                                                                                                                                                                                                                                                                                Solutions – WGS)                                         infrastructure solutions
                                                                                                                                                                                                                                                                                                                                                                                                                                50 years of gas system                                   strategy
                                                                                                                                                                                                                                                                                                                                                                                                                                delivery references
                                                                                       MINI                                                                                                                                                                      LNG FUELLED
                                                                                       L I Q U E FA C T I O N                                                                                                                                                    CARGO SHIP
                                                                                       PLANT
                                                                                                                                                                                                                                                                                  SMALL/MEDIUM
                                                                                                                                                                                                                                                                                  TERMINAL
                                                                                                                                                                                                                                                                                                                                             BUNKERING TERMINAL
                                                                                                                                                                                                                                                                                                                                                                         	 Fig. 1- Major milestones of Wärtsilä LNG history.
                                                                                                                                                                                                                                       JETTY                                                                                                     LNG FILLING
                                                                                       SMALL                                                                                                                                                                                                                                                     S TAT I O N
                                                                                       L I Q U E FA C T I O N
                                                                                       PLANT
                                                                                                                                            SMALL LNG CARRIER
                                                                                                                                                                                                                                                                                                                                                                          What is LNG
                                                                                                                                                                                                                                                                                                                                                                          Liquefied Natural Gas (LNG) is natural gas cooled down to                   Before liquefaction (turning the gas to LNG), the gas is cleaned from water,
                           24   in detail                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    in detail 25
                           [  ENERGY / IN DETAIL ]                                                                                                                                                                                                                       WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                                                                                                                                                                                            	 Fig. 2 - Process overview of Wärtsilä MR technology (Cold box = insulated with perlite or polyurethane).
                                  The LNG value chain starts with gas extraction/production followed by pre-treatment/processing and liquefaction. Then the LNG is
                                  stored in large insulated tanks ready for transport. It is transported with specially built LNG tankers across oceans. At the receiving end,
                                  LNG is pumped to large on-shore tanks or off-shore FS(R)Us. Finally LNG is regasified and pumped into the local gas pipelines or further                    Advantages of Wärtsilä’s MR technology for mini liquefaction plants
                                  transported by trucks in the form of LNG.                                                                                                                   • Easy and quick start up and shut down of all systems
                                                                                                                                                                                              • Can be started in 30 min, but typically <3h due to heat exchanger cool down limitations
                                                                                                                                                                                              • The lowest specific power consumption in the small size plants.
                                                                                                                                                                                              • All components based on conventional parts and proven technology –> Spares can be delivered quickly
                                                                                                                                                                                              • Short delivery time ( <12 months) where the cold box and compressor are the only long lead items
                                                                                 proud to present one of the most complete                                                                    • Reliable main rotating machinery with high efficiency (Oil flooded screw compressor)
                           also been providing complete regasification                                                                     The composition of the mixed refrigerant
                                                                                                                                                                                              • Compact design & easy shipment as all in one module and a separate compressor skid
                           systems for FSRUs (floating storage and               portfolios of LNG solutions and services                  is chosen for adaptation to the cool down          • Designed for unmanned operation
                           regasification units) and re-liquefaction             in the market. See Figure 1 for the main                  process. A good match between cooling              • Local control of LNG export –> truck driver handles loading
                           systems for LNG carriers since 2006.                  milestones in Wärtsilä’s LNG history.                     curves will increase the efficiency of the         • Simple energy supply, only electrical power needed
                                                                                                                                                                                              • Standard capacities: 10, 17 and 25 tons/day
                                                                                                                                           system. The refrigerants work in a closed          • Plug and play philosophy, skid based – relocation possible
                           Energy Solutions, with focus on power                 The LNG technology                                        loop, but during stand-still when the system       • Broad range of applications, biogas, pipeline gas, CBM and associated gas
                           plants and other energy related on-shore              Wärtsilä and former Hamworthy have                        is heated up, part of the refrigerant charge
                           applications has made Wärtsilä one of the             over the last years made major efforts to                 will be lost. To re-start the system, it needs
                           biggest suppliers of gas and liquid fuel              develop liquefaction and regasification                   to be refilled again with the correct mixture.
                           power plants in the 5–600 MW range. These             technology and optimize it for future market                 Wärtsilä has developed a simplified
                           plants are used as baseload and/or grid               requirements. Thanks to the investment,                   version of the MR process based on a
                           stability plants or lately as “wind chasers”          Wärtsilä has today extremely robust and                   simple screw compressor and a special
                           and “sunset balancers”, compensating                  energy efficient solutions available for                  mix of refrigerants. Thanks to a buffering
                           for the intermittency of wind power and               liquefaction and regasification. The text                 system it is a fully closed loop system that
                           the sudden drop of solar power in the                 below explains Wärtsilä’s process solutions               does not need refilling after a start and
                           evenings when we need power the most.                 and unique features of the main processes                 stop procedure. The system is delivered
                           These multi-duty power plants which are               used in LNG infrastructure solutions,                     as three prefabricated modules. It is based
                           providing superior operational flexibility            namely liquefaction, storage, boil-off gas                on standard components with a level
                           combined with the highest possible simple             (BOG) handling and regasification:                        of standardisation that allows for low
                           cycle efficiency are called Smart Power                                                                         investment cost and fast manufacturing
                           Generation power plants. The majority of              Liquefaction                                              of the module. The repetitive design gives
                           new plants are equipped either with gas or            Wärtsilä has developed two main                           consistent high quality in a compact module.
                           dual-fuel engines and many existing HFO               liquefaction technologies that are suitable               With a slightly different refrigerant mixture,
                           power plants are being converted to gas. The          for mini and small-scale liquefaction                     an intelligent automation system and             	 Fig. 3 - Process overview of Wärtsilä Reversed Brayton technology.
                           energy industry is clearly shifting to gas but        capacities. A MR (mixed refrigerant)                      standardized components, Wärtsilä has been
                           the challenge is that gas is not yet readily          process for the smaller sizes and the                     able to combine the high efficiency of the
                           available everywhere in the same way as               Reversed Brayton Cycle process for the                    MR process, with the simplicity needed in          Advantages of Wärtsilä’s Reversed Brayton Cycle for small scale liquefaction plants
                           diesel and HFO are. But with LNG, large               larger sizes.                                             smaller plants. For small capacities, below        • Robust, reliable and simple to operate technology
                                                                                                                                                                                              • Designed for unmanned operation
                           amounts of gas can economically be brought               MR (mixed refrigerant): The standard                   50 TPD (metric tonne per day), Wärtsilä’s          • Capacity control is very easy and quick
                           to new areas presently not covered by gas             MR or SMR (single mixed refrigerant)                      MR process is the ideal solution. (Figure 2)       • Easy start-up and shutdown of all systems
                           pipelines and gas infrastructure.                     process using a turbo compressor and                         Wärtsilä’s MR solution is perfect for           • Local control of LNG export, truck driver handles loading
                                                                                                                                                                                              • Simple energy supply, only electrical power needed
                              Wärtsilä has during the last few years             refrigerants consisting of methane, ethane,               biogas and landfill gas liquefaction plants
                                                                                                                                                                                              • Refrigerant will be produced directly from air on site – No logistics connected to the refrigerant
                           developed an extensive LNG product                    propane, pentane and nitrogen is normally                 that are usually built in smaller sizes. The       • There is no required handling of chemicals
                           portfolio and know-how. Today we are                  used for large capacity liquefaction systems.             first plant built and operating with this          • ZERO FLARE solution –> during normal operations, hydrocarbon losses will be zero.
                           26   in detail                                                                                                                                                                                                                                                                in detail 27
                           [  ENERGY / IN DETAIL ]                                                                                                                                                                                                                 WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                           28   in detail                                                                                                                                                                                                                                                             in detail 29
                           [  ENERGY / IN DETAIL ]                                                                                                                                                                                                             WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                                                                                                                                                      Natural Gas
                           Depending on the requirement, there can                                                                                    To Metering
                           be an LP send-out system (< 10 bar), or an
                                                                                                                               Seawater In
                           HP send-out (10-50 bar). The low pressure
                           send-out is a fairly simple system where the
                           tank low pressure LNG pumps are pushing             LNG
                           the LNG via the regasification/vaporization
                           module to the pipeline. In case of a high
                           pressure send-out system there will be
                           additional HP pumps that can be supplied as
                           part of the vaporizer/regasification module.
                           Typically gas transmission pipelines require
                           a pressure over 10 bar while more local gas                                                  Seawater                        Seawater
                                                                                                                        To Outfall                    Intake Pumps
                           distribution pipelines can have a design
                           pressure of less than 10 bar.
                           30   in detail                                                                                                                                                                                                                                                                      in detail 31
                           [  ENERGY / IN DETAIL ]                                                                                                                                                                                                                       WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                                                                                                                                   Receiving terminals
                                                                                                                                   Definition: LNG receiving terminal is a liquid
                                                                                                                                   gas processing plant which main purpose is
                                                                                                                                   to receive, store and further distribute the
                                                                                                                                   natural gas in liquid or gas form.
                                                                                                                                      The terminal always includes storage
                                                                                                                                   tank(s). The main process if included is
                                                                                                                                   regasification and sub process if included
                                                                                                                                   is re-liquefaction. As the tank is usually
                                                                                                                                   the most expensive part of a terminal, the
                                                                                                                                   receiving terminals are usually defined
                                                                                                                                   according to the size of the tanks. Wärtsilä’s
                                                                                                                                   portfolio consists of terminals with various
                                                                                                                                   functions combined with a storage capacity
                                                                                                                                   in the range from 1000 to 160,000 m3.
                           32   in detail                                                                                                                                                                                                                                                          in detail 33
                           [  ENERGY / IN DETAIL ]                                                                                      WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                                                        a local gas pipeline could be added.            systems. These can in certain conditions be       Small/medium scale LNG terminals
                                                           Wärtsilä’s preference is to deliver these    an attractive alternative to on-shore satellite   These are terminals in the size of 20,000–
                                                        projects as EPC with full delivery and          and bunkering terminals. The LNG barge            160,000 m3 located at sea shores, working
                                                        performance guarantees. The terminal can        can be equipped with the similar processes as     as hubs for whole regions or larger cities.
                                                        be supported with full service agreements.      the land based solution. The process can also     Due to the major investment and volumes,
                                                        (Figure 11)                                     be split between the barge and the land, by       a group of industries and consumers are
                                                                                                        locating for example the LNG storage on the       needed to make these projects possible. They
                                                        LNG storage & regasification barges             barge and parts of the process equipment and      are always multi use terminals which can
                                                        The smallest FSRUs today are around 120,000     support facilities on shore.                      include regasification, pipeline distribution,
                                	 Fig. 12 - A 7500 m3   m3. There are no small LNG carriers available     Wärtsilä prefers to deliver the barge           ship bunkering, trans-shipment, truck and
                                  LNG storage &         that can be converted to FSRUs. Wärtsilä        and necessary infrastructure on-shore as a        container loading to facilitate re-distribution
                                  regasification
                                  barge designed by     has created a solution for this problem,        complete EPC. Wärtsilä can also provide the       of LNG in liquid form. (Figure 13)
                                  Wärtsilä.             by designing a barge containing storage         services and maintenance agreements for
                                                        tanks (1000–25,000 m3) and regasification       the total solution. (Figure 12)
                           34   in detail                                                                                                                                                 in detail 35
                           [  ENERGY / IN DETAIL ]                                                                                                                           WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                           Large scale LNG terminals                        terminal (typically 10–50 MW)                   (>10 m) and easy access and possibility to
                           These terminals are built only in countries    	 Re-liquefaction process                         maneuver large LNG carriers to unload the
                           with large imports of LNG. These are           	 Regasification process                          cargo on to the FSU or FSRU. In case of an
                           terminals with >150,000 m3 tank capacities                                                       FSU, a regasification system needs to be built
                           and a throughput of >3 MTPA and located       FSRU or FSU + jetty regasification                 on the shore or jetty close to the FSU.
                           at the sea shore for easy access by large     A FSU (floating storage unit) is really an LNG        The FSU/FSRUs are built in ship yards
                           tankers. (Figure 14)                          carrier that is stationed at a seashore. If you    and Wärtsilä acts as a supplier of equipment
                               In these mega projects Wärtsilä does      add a regasification unit it is called an FSRU     and process package. Wärtsilä can deliver
                           not assume EPC responsibility but rather      (floating storage and regasification unit). The    the complete power system with engines,
                                                                                                                                                                               	 Fig. 15 - PGN FSRU Lampung, where Wärtsilä
                           supplies selected equipment and design        sizes are the typical size of LNG carriers or in   propellers and control system for the FSU/           has delivered 3 regasification trains with max
                           packages. Wärtsilä can for example supply:    the range of 120,000–200,000 m3. They have         FSRU as well as the re-liquefaction and              capacity of 360 TPH. Photo: Höegh LNG.
                             	 Gas/LNG driven power plant for the        to be located in places with enough draught        regasification processes. (Figure 15)
                           36   in detail                                                                                                                                                                                     in detail 37
                           [  ENERGY / IN DETAIL ]                                                                                                                                                                                                             WÄRTSILÄ TECHNICAL JOURNAL 02.2015
[  ENERGY / IN DETAIL ] 
                           Total solution provider:                          required knowledge of LNG business                Lifecycle support: Wärtsilä’s service
                           LNG terminals and liquefaction plants are         environment and available solutions in            agreements cover nearly 19 GW of
                           complex projects when it comes to design          order to evaluate and make projects happen.       generating capacity in both marine and
                           and construction. It is important that the        Wärtsilä can help our customers arrange           land based installations – more than 450
                           total concept and all aspects of the project is   financing and with a track record of projects     installations. The key persons are Wärtsilä’s
                           thought through from the beginning. Things        always delivered on time and in budget the        own experts, with additional well trained
                           to consider:                                      banks have one less risk to worry about.          labour hired based on needs. Wärtsilä can
                                                                             Wärtsilä may also invest own equity in            provide full maintenance agreements of
                           Location (site & marine) considerations:          selected projects.                                LNG terminals and liquefaction plants.
                            	 Location and site                                                                                This service covers maintenance planning,
                            	 Onshore geophysics                             Project execution: The core of Wärtsilä           parts logistics, manpower coordination and
                            	 Seismicity and seismic hazards                 has always been our EPC capabilities.             maintenance reporting. In order to perform
                            	 Metocean conditions and effect on              Wärtsilä has a unique track record in the         maintenance efficiently and reliably, we
                              construction                                   EPC business with almost all projects done        ensure that required manpower and spare
                            	Manoeuvrability                                 in time and with lost time injuries rate of       parts are available for planned maintenance.
                            	 Mooring analysis                               less than 1 (<1 accidents/million working            Typical scope of supply for a maintenance
                            	Bathymetry                                      hours). LNG projects are always assigned to       agreement is:
                                                                             dedicated project teams that have undergone         	 Online remote operations support
                           Design, construction and operational              the necessary training to take on the special       	 Maintenance management & planning
                           considerations:                                   requirements of LNG projects. Safety and            	 Technical evaluation
                            	 Size of LNG carriers, replenishment/           risk management are of essence in LNG               	 Operational data analysis
                              supply schedule, tank size                     projects. Therefore series of prudent risk          	 Technical support
                            	 Required berth availability                    analyses are conducted during the project to        	 Spare parts for planned maintenance
                            	 Operating philosophy, BOG                      ensure a safe system. With a lump-sum EPC,          	 Manpower for planned maintenance
                              management                                     Wärtsilä can give guarantees on final price,        	 Inventory management
                            	 Gas delivery flow rate, availability           construction time and plant performance,            	 Safety stock & onsite tools
                              requirement                                    elements of investment having importance            	 Capital spare parts
                            	 Investigations into local construction         when obtaining financing, and especially for
                              expertise, equipment and materials             non-recourse debt financing.                      Summary
                                                                                                                               Combining the LNG process know-how and
                           Only by doing proper pre-studies it is            Modularised solutions: By high level              proprietary liquefaction and regasification        Project
                           possible to optimize the functionality and        of modularisation and reusing proven              technologies with project development,                                              Equipment &                                            Operation &
                                                                                                                                                                               Development &                                                              EPC
                           operational cost of the plant. With the LNG       solutions, Wärtsilä can shorten the               EPC and lifecycle support, Wärtsilä is now                                          Engineering                                            Maintenance
                                                                                                                                                                                 Financing
                           process knowledge in combination with the         construction time and guarantee high              in a unique position to help our customers
                           site preparation and construction services        quality. To fully utilize these benefits, it is   develop, build and operate complete
                           and EPC capabilities in-house Wärtsilä can        important that Wärtsilä can work closely          LNG infrastructure solutions and even                                                                 LNG Terminal
                           develop feasible solutions that can be backed     together with the customer. By collaborating      including the gas power plant. All of this
                           up with firm cost estimates. With a Wärtsilä      from early conceptual phase, Wärtsilä can         can be backed-up with a price, delivery and                                                         Gas Power Plant
                           EPC and O&M the customer can get a                create a more cost effective solution and         performance guarantee. That is what being
                           lump-sum price with guaranteed delivery           quicker project completion than what is           the total LNG solution provider means!
                           time and long term performance guarantee.         achievable through a traditional FEED             (Figure 16)
                                                                                                                                                                               	 Fig. 16 - Providing complete solutions both for LNG terminals and gas power plants.
                                                                             (Front End Engineering & Design)  + ITT
                           Project development & financing:                  (invitation to tendering) process. The client
                           Before you have the final product in place        can in some cases save up to 2-5% of the
                           there is typically several years of project       total cost and generate revenue 8-12 months
                           development and authority approvals               earlier by avoiding the FEED + ITT process. 
                           needed. Wärtsilä has over 15 years of             It is important to involve the construction
                           experience with project development.              and operation personnel in the design and
                           Wärtsilä has a team of experienced project        project planning. Wärtsilä has always had a
                           developers all over the world with full           close co-operation between our designers,
                           access to its project execution and technical     constructors and operators as they all belong
                           support organisation. This team has the           to the same organisation.
38 in detail in detail 39