4 Provision of Submircible Pump 4 Nos Each 328600 328600 1314400 Detail attached
Providing and hoisting vertical / horizontal type storage tank
of required capacity made of rotationally molded from
(HDPE), double plypolyethelene of approved manufacturer
i/c cost of making connection for inlet / out let pipe, float
5 valve i/c all cost of specials & labour complete in all respect 3000 Gln P-Gln 93.10 93.10 279300 MRS Rates 1st Biannaul 2022
as approved and directed by the Engineer
Incharge.500(gollans) (6x500=3000
6 Construction of Toilet Block 2 Nos Each 333400 333400 666800 Detail attached
7 Construction of improved specification Main Building 1 Job P-Job 955000 955000 955000 Detail attached
9 Costruction of Wall 9" Thick 6' height. 0 Sft P-Sft 2582 2582 0 --do--
10 Provision of Gate and Gate Pillers 0 Job P-job 241900 241900 0 Detail Attached
Plinth Area rate Based on 1st Bianual
11 Costruction of Officer Residence (15-17) 0 Sft P-Sft 2743 + 535 110 146 3534 0
2022.
13 Costruction of 9" Thick 6' height. 0 Sft P-Sft 2582 2582 0 Plinth Area rate Based on 1st Bianual
2022.
14 Provision of Gate and Gate Pillers 0 Job P-job 241900 241900 0 Detail Attached
Costruction of Official Residential (1-10) Plinth Area rate Based on 1st Bianual
15 (2 x 913 ) 0 Sft P-Sft 3021 + 535 110 146 3812 0 2021.
TOTAL 29460730
G. TOTAL 31728374
Or Rs. 31.728 M
Total: 366759
Pillars. 2 4 4 3 96 Cft
@ 8,949.60 %oCft 859
2 Cement concrete brick or stone ballast 1½
" to 2" (40 mm to 50 mm) gauge, in
foundation and plinth:- (e) Ratio 1: 6: 12
Total: 234829
= 1 No
Total = 1 No
= 1 Job
Total = 1 Job
@ 50000.00 P.Job 50000
Net = 54 - 4 = 50 Sft
@ 6708.00 % Sft 3354
1x 8.75 x 5= 44 Sft
Total = 44 Sft
Deduction of khurra
1x 2x 2= 4 Sft
Total = 4 Sft
Net = 44 - 4 = 40 Sft
13 Cement plaster 1:4 upto 20' (6.00 mm) height:- b) ½" (13 mm) thick
14 Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof
slabs only, upto 20' height.b) 1:3
2x 4x 5= 40 Sft
Total = 40 Sft
@ 3035.05 % Cft 1214
2x 4x 4x 0.125 = 4 Cft
= 4 Cft
@ 29158.80 % Cft 1166
2x 4x 5= 40 Sft
2x 2.5 x 0.75 = 4 Sft
Total = 44 Sft
@ 181.75 P-Sft 7997
2 x 2x 1.5 = 6 Sft
Total = 6 Sft
@ 1371.55 P.Sft 8229
2 x 2.5 x 7= 35 Sft
Total = 35 Sft
@ 983.00 P.Sft 34405
= 2 Nos
Total = 2 Nos
1,954.50 + 223.85 + 194.25 @ 2372.60 Each 4745
25 Providing and fitting plastic made low down
flushing cistern 1363 litre (3 gallons) capacity,
including bracket set, copper connection, etc.
complete.i) white
= 2 Nos
Total = 2 Nos
@ 2401.10 Each 4802
= 20 Rft
Total = 20 Rft
@ 44.35 P.Rft 887
32 Supply and erection of single core PVC insulated
copper conductor cables, in prelaid PVC pipe/M.S.
conduit/G.I pipe/wooden strip batten/wooden
casing an capping/G.I. wire/trenches (rate for
cables only):-a) 250/440 volts, PVC insulated:
(i) i) 3/0.74 mm (3/0.029")
= 80 Rft
Total = 80 Rft
@ 21.35 P.Rft 1708
(ii) iii) 7/0.74 mm (7/0.029")
= 80 Rft
Total = 80 Rft
= 1 Nos
Total = 1 Nos
A Material
1 P/F M.S Angle iron chwkat 1-
1/2x1-1/2x1/4" welded with M.S
flat 2"x1/4" etc complete
1 x 4 x7 = 28 Sft
@ Rs:340.25/- P-Sft Rs:9526/-
2 Preparing surface and painting of
doors and windows any type
three coats
2 x 4 x7 = 56 Sft
1149.35+576.95+576.95 @ Rs:2303.25/- P-Sft Rs:1289/-
3 Leave frame 1-1/2"x1-1/2"x1/4"
angle
i) Vertical 4x6.875 = 27.5 Rft
Horizontal 4x1.875 = 7.5 Rft
Total = 35.0 Rft
@ Rs:0.6680/- Kg/Rft = 23.38 Kg
ii) Bracing 1"x1"x1/8"
4x3.92 = 15.7 Rft
2x1.875 = 3.8 Rft
Total = 19.43 Rft
@ Rs:0.3620/- Kg/Rft = 7.03 Kg
iii) Flat 2"x3/16"
7+2+2 = 11.0 Rft
Total = 11.00 Rft
@ Rs:0.5060/- Kg/Rft = 5.566 Kg
Total 35.98 Kg
(12.120) @ Rs:187.330/- P-Kg Rs:6740/-
4 Iron Sliding bolt to door 12" (300
T
mm Long)
( 12.066 1 = 1 Nos
@ Rs:250.00/- Each Rs:250/-
5 4" Long hinges T
6 = 6 Nos
(12.076 @ Rs:48/- Each Rs:288/-
6 Iron tower bolts 225mm long T
2 = 2 Nos
(12.094 @ Rs:420/- Each Rs:840/-
7 Handle 6" T
(12.055 3 = 3 Nos
@ Rs:60/- Each Rs:180/-
8 M.S Sheet 18 SWG T
(12.157 1 x 3.67 x 6.83 = 25.07 Sft
@ Rs:150.00/- P-Sft Rs:3760/-
B LABOUR
1 Black Smith T
1 Day = 1 Day
@ Rs:1100/- P-Day Rs:1100/-
2 Labour T
Colly un-skilled 1 Day = 1 Day
@ Rs:800/- P-Day Rs:800/-
Total: Rs:24774/-
Total: Rs:27516/-
27516
Rate per Sft = = Rs:982.71/- P.Sft
28
CERTIFICATE
i) certified that input rate of material and labour for item at Sr. No. 3,56,7,8
(12.119,12.076,12.055,12.157,12.094) and Labour rate at Sr. No. (LB-028, LB-015) Are as per input
rates displayed on Website of Finance Department for the MRS, 1ST BI-ANNUAL-2022 (01.01.2022
to 30.06.2022) DISTRICT DERA GHAZI KHAN
ii) Certified that rates for items at serial No. Are not available onthe Website of Finance
Department for the the MRS, 1ST BI-ANNUAL-2022 (01.01.2022 to 30.06.2022) DISTRICT DERA
GHAZI KHAN such the rate of Rs. 983/-… has been applied after ascertaining it from the market.
GROUND FLOOR
Gen Word 1 x 14 x 13 x -- = 182 Sft
Exam 1 x 5 x 7 x -- = 35 Sft
M.O Office 1 x 14 x 10.25 x -- = 144 Sft
waiting 1 x 24.375 x 14.5 x -- = 353 Sft
L.H.V Office 1 x 14 x 10.25 x -- = 144 Sft
Exam 2 x 5 x 7 x -- = 70 Sft
O.B.S Ward 1 x 14 x 13 x -- = 182 Sft
Ster: 1 x 6.5 x 14 x -- = 91 Sft
Corridor 1 x 100 x 8 x -- = 800 Sft
Technican / lab 1 x 14 x 10 x -- = 140 Sft
EPI 1 x 14 x 10 x -- = 140 Sft
Treatment / Procedure rooms 1 x 14 x 10 x -- = 140 Sft
Store 1 x 9.375 x 7 x -- = 66 Sft
Dispensary 1 x 9.75 x 7 x -- = 68 Sft
Ent. 1 x 24.375 x 14.5 x -- = 353 Sft
Feeding room 1 x 6.5 x 6.5 x -- = 42 Sft
recep 1 x 7.25 x 6.5 x -- = 47 Sft
Entr: Lobby 1 x 8.75 x 6.5 x -- = 57 Sft
Nersary 1 x 9 x 7.125 x -- = 64 Sft
Labor Room 1 x 18 x 14 x -- = 252 Sft
Clen Utilites 1 x 6.5 x 6 x -- = 39 Sft
dirty Utilites 1 x 6.5 x 6 x -- = 39 Sft
Deck 1 x 14 x 24.375 x -- = 341 Sft
1 x 14.5 x 6.5 x -- = 94 Sft
1 x 9.5 x 6 x -- = 57 Sft
Total = 3940 Sft
263.1 - 159.63 + 36.45 @ 139.92 P-Sft 551285
GROUND FLOOR
Gen Word 2 x( 14 + 13 )x 5.25 = 284 Sft
Exam 2 x( 5+ 7 )x 0.5 = 12 Sft
M.O Office 2 x( 14 + 10.25 )x 0.5 = 24 Sft
waiting 2 x( 24.375 + 14.5 )x 5.25 = 408 Sft
L.H.V Office 2 x( 14 + 10.25 )x 0.5 = 24 Sft
Exam 4 x( 5+ 7 )x 0.5 = 24 Sft
O.B.S Ward 2 x( 14 + 13 )x 5.25 = 284 Sft
Ster: 2 x( 6.5 + 14 )x 0.5 = 21 Sft
Corridor 2 x( 100 + 8 )x 5.25 = 1134 Sft
Technican / lab 2 x( 14 + 10 )x 0.5 = 24 Sft
EPI 2 x( 14 + 10 )x 0.5 = 24 Sft
Treatment / Procedure rooms 2 x( 14 + 10 )x 0.5 = 24 Sft
Store 2 x( 9.375 + 7 )x 0.5 = 16 Sft
Dispensary 2 x( 9.75 + 7 )x 5.25 = 176 Sft
Ent. 2 x( 24.375 + 14.5 )x 5.25 = 408 Sft
Feeding room 2 x( 6.5 + 6.5 )x 0.5 = 13 Sft
recep 2 x( 7.25 + 6.5 )x 5.25 = 144 Sft
Entr: Lobby 2 x( 8.75 + 6.5 )x 0.5 = 15 Sft
Nersary 2 x( 9 + 7.125 )x 0.5 = 16 Sft
Labor Room 2 x( 18 + 14 )x 5.25 = 336 Sft
Clen Utilites 2 x( 6.5 + 6 )x 5.25 = 131 Sft
dirty Utilites 2 x( 6.5 + 6 )x 5.25 = 131 Sft
Deck 2 x( 14 + 24.375 )x 5.25 = 403 Sft
2 x( 14.5 + 6.5 )x 0.5 = 21 Sft
2 x( 9.5 + 6 )x 0.5 = 16 Sft
Total = 4113 Sft
263.1 - 171.79 @ 91.31 P-Sft 375558
Total 926843
Total 954648
GROUND FLOOR
Drwaing / daining 1 x 19 x 12 x -- = 228 Sft
Launch 1 x 17.375 x 12.5 x -- = 217 Sft
Bed 1 x 13.625 x 12 x -- = 164 Sft
Box 1 x 11.375 x 6 x -- = 68 Sft
Study 1 x 11.625 x 9.5 x -- = 110 Sft
Bed 1 x 14 x 12 x -- = 168 Sft
Lobby/ dack 1 x 6 x 14 x -- = 84 Sft
Dress 1 x 5 x 6 x -- = 30 Sft
Dress 1 x 5.5 x 4.75 x -- = 26 Sft
Kithen 1 x 12 x 10 x -- = 120 Sft
Total = 1215 Sft
263.1 - 159.63 + 36.45 @ 139.92 P-Sft 170003
GROUND FLOOR
Drwaing / daining 2 x( 19 + 12 )x 0.5 = 31 Sft
Launch 2 x( 17.375 + 12.5 )x 0.5 = 30 Sft
Bed 2 x( 13.625 + 12 )x 0.5 = 26 Sft
Box 2 x( 11.375 + 6 )x 0.5 = 17 Sft
Study 2 x( 11.625 + 9.5 )x 0.5 = 21 Sft
Bed 2 x( 14 + 12 )x 0.5 = 26 Sft
Lobby/ dack 2 x( 6 + 14 )x 0.5 = 20 Sft
Dress 2 x( 5 + 6 )x 0.5 = 11 Sft
Dress 2 x( 5.5 + 4.75 )x 0.5 = 10 Sft
Kithen 2 x( 12 + 10 )x 0.5 = 22 Sft
Total = 214 Sft
263.1 - 171.79 @ 91.31 P-Sft 19540
Total 189543