Drainage Canal Construction Plan
Drainage Canal Construction Plan
COMPUTATION
I. FINISHING WORKS
FORMWORKS
Description # of sets # of units Length Width Area
Portland Cement =
Screened Gravel =
Washed Sand =
4" CHB
10MM
TIE WIRE
REINFORCING STEEL WORKS
WALL 1 (2.4M)
VERTICAL 13.00 6.00 1.40 4.29 18.20
COMPUTATION
= 4.00 cu.m./(1x53.76 cu.m./day(max. output based on soil condition)) = 0.07 day, say 7 day based on soil condition
I. CONCRETE WORKS
6 ( x)(n)
N Qty
length N
(1)(5)
6 Qty
N 6
1.00 Qty 0.83
N 6.00 Qty 1
FOOTING 4.00 10.00 1.20 5.00 8.00
COLUMN
MAIN BARS 4.00 4.00 2.00 3.00 5.33
TIES 4.00 14.00 1.20 5.00 11.20
SLAB1(CROSS BAR 1 -4M) 1.00 7.00 3.00 2.00 3.50
SLAB1(CROSS BAR 2-3M ) 1.00 6.00 4.00 1.50 4.00
IV.BACKSTOP
Item No. of Set unit length Total Length Length/pc Num. of pcs
Item No. 1047(2)b: Structural Steel Roof Truss
5MMX 1 1/2 ANGLE BAR
SIDE BARS HOR LITTLE 32 0.50 16.00 3
UPPER BARS AND CENTER AND D 12 3.30 39.60 18
VERTICAL 16 3.00 48.00 8
29
5MMX 1 ANGLE BAR
16 3.00 48.00 8
16 0.10 1.60 1
9
2" G.I. PIPE S-40
BAHALA KADA 5 3.00 15.00 3
6
1 1/2" G.I. PIPE S-40
BAHALA KADA 10 3.00 30.00 5
10
#6 STEEL MATTING
top chord 8 2.00 16.00 16.00
SQUARE BAR
SIDE BARS 16 3.00 48.00 8
8
Item No. of Set unit length Length Total LengthNum. of pcs
Vertical Cross Bracing
1L-50 X 50 X 6mm 1 8.00 4.83 38.64
1 5.00 1.75 8.75
47.39 9
Item No. of Set unit length Total Length Length/pc Num. of pcs
Purlins
1.2mm x 2"x4" C-Purlins 21 19.00 399.00 6 70
Item No. of Set unit length Length Total LengthNum. of pcs
Clip Angle
2" x 2" x 6mm Clip Angle 3 21 0.130 8.19 2
Item No. of Set unit length Total Length Length/pc Num. of pcs
12mmø Sag Rods 8 10.90 87.20 6 16
Item No. of Set no. unit length length total length no. of pcs
16mmø Sway Bracing
√([(5.60)^2+(4.5)^2]=7.18 1 8.00 7.18 57.44
√([(5.30)^2+(4.5)^2]=6.95 1 8.00 6.95 55.60
113.04 20
Item No. of Set Length Width Thickness Total Volume
Steel/Angular base Plate
0.25m x 0.30m x 6mm (S) 6 0.25 0.30 0.006 0.0027
total kg of steel (using unit weight of steel = 7850kg/cu.m) 22.00
Item No. of Set unit length Length Total LengthNum. of pcs
16mmøx0.30m Long Anchor Bolts 6 4 0.3 7.2 24
12mmøx150mm Long Anchor Bolts 4 23.00 0.15 13.8 92
Item No. of Set Width Height Area
Gusset Plates
2(s-6) Detail 1 6 0.15 0.25 0.225
4(s-6) Detail 2 6 0.30 0.30 0.54
5(s-6) Detail 3 3 0.50 0.40 0.6
6(s-6) Detail 4 12 0.25 0.25 0.75
7(s-6) Detail 5 3 0.15 0.25 0.1125
Total Area of 10mm thk Gusset Plates 2.23
total number of 0.25mx0.25mx10mm thk gusset plate 36.00
.I
204.00 SQ.M.
54.60 SQ.M.
133.00 bags
7.00 cu.m.
11.00 cu.m.
710.00 pcs
70.00 pcs
8.00 pcs
39.00 kgs. 54.60 0.00 kgs.
69.00
Total Wt.
- 20mm Ø RSB 00 fabrication
- 16mm Ø RSB 00 fabrication
133.25 12mm Ø RSB 00 80 kg/day 1
259.00 10mm Ø RSB 00 installation
#16 G.I. tie wire 00 80 kg/day 2
392.25 sq.m.
4.80 SQ.M.
Total Wt.
- 20mm Ø RSB 00 fabrication
37.88 16mm Ø RSB 00 fabrication
- 12mm Ø RSB 00 80 kg/day 1
1,927.70 10mm Ø RSB 521 548 installation
#16 G.I. tie wire 00 80 kg/day 2
1965.58 sq.m.
4.00 cu.m. 0
Vol Description Quantity rate of man no. of man
4.00 cu.m.
4.00 Total Vol. of 20 cu. m/day 10
Excavation
53.76
cu.m./day
2.79 cu.m. 0
Vol Description Quantity rate of man no. of man
1.00 cu.m.
0.31 cu.m.
1.20 cu.m.
0.28 cu.m.
2.79 Total Vol. of 20 cu. m/day 10
Excavation
bags use 26 bags only 1.346401355 9 #N/A Small 15.00%
cu.m. use 3 cu.m. only 1
cu.m. use 2 cu.m. only 0.5 XS 10.00%
148.62 kgs. 0 148.62 kgs.
10
8.00 12mm Ø RSB 6 12 mm Ø RSB 0.00
20.00
Total Wt.
- 20mm Ø RSB 00 fabrication
- 16mm Ø RSB 00 fabrication
74.62 12mm Ø RSB 14 15 80 kg/day 1
74.00 10mm Ø RSB 16 17 installation
1 X 1/4 ANGLE BAR
#16 G.I. tie wire 00 80 kg/day 2
148.62 kgs.
10
16.00 16mm Ø RSB 6 16 mm Ø RSB 0.00
11.00 16mm Ø RSB 16 mm Ø RSB 0.00
3.00 16mm Ø RSB 6 16 mm Ø RSB 0.00
6.00 16mm Ø RSB 6 16 mm Ø RSB 0.00
Num. of pcs
18
0
Num. of pcs
Num. of pcs
Num. of pcs
Num. of pcs
10.9 = 5.6+5.3
Total Volume
21.195
21.195
Num. of pcs
no. of days 80
81
89
89
93
60.00% 94
25.00% 95
15.00% 96
no. of days 80
81
82
82
93
60.00% 94
25.00% 95
15.00% 96
97
98
no. of days 80
81
89
93
60.00% 94
25.00% 95
15.00% 96
97
no. of days 80
81
89
93
60.00% 94
25.00% 95
15.00% 96
no. of days 80
81
89
89
93
60.00% 94
25.00% 95
15.00% 96
36
37
41
0.00 0 0 42
42
0.00 0 0
42
13.00 0 0
42
0.00 0 0
12.00 0 0
0.00 0 0
25.00 72
73
74
75
5 76
3 say 2 steelman 77
5 78
3 say 4 steelman 79
no. of days 80
81
89
93
60.00% 94
25.00% 95
15.00% 96
97
no. of days 80
81
89
93
60.00% 94
25.00% 95
15.00% 96
36
37
41
0.00 0 0 42
0.00 0 0 42
41
0.00 0 0 42
0.00 0 0 42
41
0.00 2 0 42
0.00 2 0 42
72
73
74
75
25 76
13 say 2 steelman 77
25 78
13 say 4 steelman 79
no. of days 2
5
1 7
8
no. of days 2
5
5
5
5
1 7
8
25.00% 95
15.00% 96
36
37
12 16 20 G.I.W 38
8.00 0 0 42
6.00 0 0
0.00 0 0
0.00 0 0 42
0.00 0 0 42
14.00
0 72
73
74
75
2 76
1 say 2 steelman 77
2 78
1 say 4 steelman 79
36
37
12 16 20 G.I.W 38
0.00 16 0 42
0.00 11 0
0.00 3 0 42
0.00 6 0 42
I - FORMS, SCAFFOLDINGS AND STAGGING
DESCRIPTIONS QUANTITY UNIT UNIT COST(PhP) COST(PhP)
1/4" X 4' X 8' Ordinary Plywood 5 pcs 450.00 2,250.00
2" x 2" x10' Good Lumber 30 pcs 130.00 3,900.00
Bamboo Poles 45 pcs 100.00 4,500.00
CWN Assorted 2 boxes 1,300.00 2,600.00
Hacksaw Blades 5 pcs 60.00 300.00
PVC Pails 5 pcs 70.00 350.00
13,900.00
II - ROOF FRAMING
FRANCES E. CASALMER
Civil Engineer
PRC # 175759
TIN # 742-420-281
PTR # 3809874
Issued on March 31, 2021
Issued at Iloilo City
.
PROJECT TITLE : PROPOSED CONSTRUCTION GAS REFILLING STATION
LOCATION : BRGY. MALUSGOD POTOTAN, ILOILO
OWNER : GIGI SAUL
SUBJECT : BILL OF MATERIALS AND ESTIMATES
SUMMARY
IV CEILING 6,600.00
MATERIALS 107,308.00
LABOR 48,288.60
CONTINGENCIES 14,003.69
TOTAL COST PhP 169,600.29
Prepared by:
FRANCES E. CASALMER
Civil Engineer
PRC # 175759
TIN # 742-420-281
PTR # 3809874
Issued on March 31, 2021
Issued at Iloilo City
MAT #REF!
EQUI
LAB #REF!
#REF! #REF!
9b
#REF!
1,000,000.00
#REF!