U.S.
 EPA
VESSEL GENERAL PERMIT
                        U.S. EPA
                VESSEL GENERAL PERMIT
• Went into effect February 19, 2009, on‐line availibility 
  after June19th
• NOI due within 9 months later (Sep 19, 2009) 
• Discharge management plan
   –   Deck runoff
   –   Ballast water
   –   AFFF
   –   Boiler Blowdown
   –   Chain locker effluent
   –   Greywater
   –   Rudder Bearing lubrication
   –   Seawater cooling
• Expanded Self‐Reporting
• Comprehensive Inspections, Logs
• Annual Declaration of Violations
                   U.S. EPA
           VESSEL GENERAL PERMIT
• Deck Run‐off            • Boiler/Exhaust Gas 
• Bilge Water/OWS           economizer Blow Down
  effluent                • Cathodic Protection
• Ballast Water           • Chain Locker effluent
• Anti‐fouling            • Controllable Pitch 
  Leachetefrom Anti‐        propeller Hydrolic fluid 
  fouling Hull coating      – Stern Tube Oil 
• Aquaous Film Forming      Discharge
  Foam (AFFF)
                    U.S. EPA
            VESSEL GENERAL PERMIT
• Freshwater generator     • Well deck discharge
  distillation             • Grey water mixed with 
• Hull Cleaning              sewage
• Grey Water               • Exhaust gas scrubber 
• Fire Main System           wash water discharge
• Non‐oily Machinery       • Inert gas Scrubber
  Waste Water
• Small Boat Engine wet 
  exhaust
        U.S. EPA
VESSEL GENERAL PERMIT
       DECK RUN-OFF
 •Ensure decks are clean, clear of
 debris: garbage & chemicals.
 •Use non-toxic chemical
 cleaner.
 •Utilize scupper plugs
                          U.S. EPA
                  VESSEL GENERAL PERMIT
                           Ballast Water
•Ensure the vessel has an updated Ballast Water Management Plan
(BWMP).
•Ensure additional State Regulations (California, Oregon, Washington)
are complied with.
•How do you document your sediment removal?
    9Tank inspection Report – Dry dock, etc…
•What is ballast water training?
    9Sampling procedures - exchange methods - safety factors –
    regulations – reporting procedures – completing handling logs,
    etc…
           U.S. EPA
   VESSEL GENERAL PERMIT
Aqueous Film Forming Foam (AFFF)
               No Maintenance or    
               training with actual foam 
               in port limits, except in 
               the case of an       
               emergency.
                        U.S. EPA
                VESSEL GENERAL PERMIT
              Boiler Economizer Blow Down
• Vessels greater than 400 GT which leave the US territorial sea at 
  least once per week, boiler/economizer blow down may not be 
  discharged in waters listed in the VGP except for safety 
  purposes.
• For all vessels, Boiler/Economizer blow down may not be 
  discharged in or within 1 nm of waters federally protected 
  wholly or in part for conservation purposes except for safety 
  purposes. 
                    U.S. EPA
            VESSEL GENERAL PERMIT
                 Cathodic Protection
• Impressed Current Cathodic Protection if the 
  EPA’s Prefered method of protecting the hull.
• Inspect & replace anodes 
  in dry dock.
                      U.S. EPA
              VESSEL GENERAL PERMIT
     Chain Locker Effluent 
• Clean anchor(s) during retrieval.
• Clean out, pump out, or rinse 
  chain lockers at least 50nm 
  offshore.
• Clean & inspect during drydock
                      U.S. EPA
              VESSEL GENERAL PERMIT
Controllable Pitch Propeller Hydraulic Fluid, Stern Tube 
  Oily Discharge, and Rudder Bearing Lubrication 
  Discharge
• Monitor for leaks, oil sheen, & change in 
  tank ullage.
• Inspect during 
  drydock
                      U.S. EPA
              VESSEL GENERAL PERMIT
                 Small Boat Wet Exhaust
• Lifeboat and rescue boats to be maintained.
• Consider buying four stroke engines
• Retain oil residue from barrels.
                         U.S. EPA
                 VESSEL GENERAL PERMIT
       Underwater Ship Husbandry (Hull Cleaning)
• Hull repairs that require raw materials or other potentially toxic 
  chemicals should be conducted while the vessel is drydocked.
• It is recommended that extensive hull cleaning be conducted 
  when the vessel is in dry‐dock or when the byproducts of the 
  cleaning can be contained and disposed of properly, especially 
  when cleaning hulls using water pressure based systems.
• Use of non‐toxic anti‐foulant paints such as silicon based paints 
  will reduce the discharge of toxic materials into
  the water column during any cleaning. 
                    U.S. EPA
            VESSEL GENERAL PERMIT
    Seawater Cooling Overboard Discharge
• Clean sea strainers and remove fouling organisms
  from seawater piping and cooling systems while at
  sea and greater than 50nm from shore.
                         U.S. EPA
                 VESSEL GENERAL PERMIT
             Graywater
• Utilize holding tank if equipped.
• Discharge graywater greater than                                
  1nm from shore while underway.
• Make the attempt to reduce the amount of graywater 
  generated onboard (galley drain, showers, laundry, 
  etc…).
• Utilize non‐toxic and phosphate free soaps and 
  detergents.
                      U.S. EPA
              VESSEL GENERAL PERMIT
• Applicable in US waters
• NOI to be filed no later than Sept. 19th 2009 for all 
  TORM Vessels
• Newbuilding/Purchase of vessels: 30 days grace 
  period
• Vessels will be required to submit a Notice of Intent
  (NOI) to discharge any of the twenty‐six identified 
  effluents.
• Enforcement ????   USCG vs EPA
• Self Reporting a MUST
                         U.S. EPA
                 VESSEL GENERAL PERMIT
• Inspections
        ‐ Routine Inspections (not less often than weekly)
        ‐ Quarterly for non‐visible waste Streams
        ‐ Annual Inspections and Dry Docking
• Records
        ‐ PMS: records of inspections
        ‐ Records of violations 
• Reports
        ‐ Violation reports are a must and have to be recorded onboard
• Training & Discipline
      ‐ Train onboard crew
      ‐ Demonstrate proficiency
      ‐ Reprimand of violations