REVISION - DATE: 20/12/2022
WORK SPECIFICATION OF HOUSE BUILDING FOR
Mr. RAJENDRAN,
MUSIRI, TRICHY
“This Building construct by Frame Method”
ESTIMATION FOR PROPOSED BUILDING
1. AREA OF GROUND FLOOR BUILDING : 1350 SFT
RATE/SFT : RS. 2300.00
AMOUNT : RS. 31,05,000
2. AREA OF FIRST FLOOR BUILDING : SFT
RATE/SFT : RS. 2200.00
AMOUNT : RS.
3. AREA OF STAIRCASE (Including SS Railing) : SFT
RATE/SFT : RS. 1500.00
AMOUNT : RS.
4. SEPTIC TANK (UG) : LT
RATE/LT :
AMOUNT : RS.
1
5. WATER SUMP (UG) : LT
RATE/LT :
AMOUNT : RS.
6. COMPOUND WALL (RBM) : RFT
RATE/RFT :
AMOUNT : RS.
TOTAL AMOUNT : Rs.31,05,000
WORK SPECIFICATION
1. Column Size : 1’0” x 0’9”, 0’9” x 0’9”
2. Plinth Beam : 0’9” x 0’9”, 0’9” x 1’0”, 0’9” x 1’3”
3. Lintel Beam : 0’9” x 0’6”, 0’9” x 0’9”
4. Roof Slab : 0’4 ½” Thickness
5. Concrete Mix : M20 Grade
6. Mortar : 1:5 (Brick Work), 1:4 (Plaster)
7. Reinforcement : As Per Reinforced Design
(ABOVE MENTIONED DETAILS MAY CHAGE DUE TO SITE CONDITION)
8. Basement Height : 4’0” From Existing Ground Level
9. Ceiling Height : 10’2” From Flooring
10.Loft : Any One length Will Be Given
11.Low Roof : One unit per Floor
12.Shelves : 4’0” x 7’0” per Bed & Kitchen (Kadapa)
13.Flooring : Vitrified Tiles ( 4’x 2’)
14.Kitchen Table Top : Granite with SS Sink
15.Kitchen and Toilet Wall : Glazzed Tiles upto Lintel Height
16.Wood Front Door : Maindoor Teak Wood Frame with
Teak Door
17.Wood Windows : Teak Wood Frame with Shutter
18.Inner Door : Frame – Teak Wood
Shutter – Readymade Flush Shutter
19.Toilet Door : WPC Door
2
20.Parapet : 3’ Height and 4.5” Brick wall
21.Painting : For Exterior - 1 coat Primer, 2 Coat Emulsion
Asian Paints – ACE Advanced & APEX
For Interior - 2 coat Putty, 1 coat Primer,
2 coat Emulsion (Tractor Shyne & Apcolite)
Joinery: One coat Primer and Two Coat
Enamel (Asian Paints)
22.Electrical : Basic Points & AC Points For Bedrooms
23. Bath Fittings : CP Fittings & EWC Closet
24.Plumbing : PVC- AvonPlast, UPVC – Trubore
CPVC- Finolex
25.Terrace Finish : Plaster & Water Proofing With Damp Proof
26. Hardware : Mortice Lock For Bedrooms, Bullet Lock
For Main Door & I-Max Hinges for Windows
EXCLUDING OF THIS SPECIFICATION
1. Septic Tank, UG Sump & Over Head tanks
2. Fan and Light Fittings
3. Inner Stairs
4. Elevation Work (Architect Level)
5. Outer Flooring
6. Compound Wall and Gate Work
7. Demolition
8. Pile Foundation
9. Bore well & EB
10.Approval & Blue Print
11.Interior Works (False Ceiling, Wood & PVC Works)
12.Inner Stairs
13.Old Building Repair Works
➢ Above works will be claimed from Client
3
MATERIALS TO BE USED
1. Sand – M-Sand & P-Sand
2. Brick – Chamber brick
3. Cement – JSW / Chettinad / Ramco
4. Steel – Fe 550D TMT Bars PULKIT / JSW Neo Steel
5. Window Grill – 12mm Square Rod (Ladder Design)
6. Window & Door – Teak Wood / UPVC (Client’s Choice)
7. Maindoor – Teak Shutter
8. Bedroom Doors – Readymade Skin Doors
9. Hand Rail – Mild Steel Tubes (ISI/ISO)
10.Chemicals – Dr. Fixit, Bostik, Building Doctor
11.Pest Protector – Terminator (For Basement)
12.Terrace – Professional Water Proofing (Asian Paints)
13. Tiles – KAG, Kajaria
14. Paints – Asian Paints
15. Plumbing – Avon Plast, Aashirvad, Trubore, Finolex
16. Electrical – Finolex Pipes & GM Metal Concealed Box
17.Wires – RR / Kundan
18.Switches – Legrand / GM / Lisha (Modular)
19.MCB – Legrand, Crompton
20. Closet – Parryware / Jaquar
21.Bath Fitting – Johnson Pedder / Jaquar (Modular)
22. Kitchen Table – Table Top Granite
23. Sink – Prayag (Stainless Steel)
24.Lock (Main door) – Godrej / Europa
25.Lock (Bedrooms) – Millarco Mortice Lock
26.Window Lock – L Shaped Tower bolt Lock
27.Window Glass – White Pin-Head Glass Or Clear Glass
28. Screw And Bolts – ISI/ISO Branded
29.Stainless Steel – Jindal 304 Grade
4
ASSUMED MATERIAL RATE FOR THIS SPECIFICATION
1. Sand : Rs. 4000 /Unit
2. Cement : Rs. 410 / Bag
3. ¾ Metal : Rs. 30 / Cft
4. Steel : Rs. 75 / Kg
5. Wires : Rs. 1200/Box (1 sq.mm Coil)
6. Switches : Rs. 20/No
7. PVC Pipes : Rs. 19 /kg
8. Brick : Rs. 8.50 / No
9. Wall Tiles : Rs. 40 / Sft
10.Floor Tile : Rs. 55 / Sft
11.Granite : Rs. 130/ sft
• If there is any increase in material cost more than 5%, excess cost
will be claimed from the party.
• Any local taxes and other taxes like GST, which are liable are of
client’s scope.
For MANCHESTER CONSTRUCTIONS
Er. MADHAN PRABAKARAN B.E, MBA.,