Overflo
Flood Detention
Extended Detention
                     SSRT
                            SSRL
                                                                  Secondary
                                                                 SRDU
                             Primary Outlet         SRDL
                       On-Site Detention System Key Parameters
          Overflow Weir
        Secondary Outlet
       SRDU
ters
                                                     Ove
                                                         r   flow
Dedicated Airspace                                                  Ou
                                                                       tlet
                                                     Sec
                                                        o    nda
Dynamic Airspace                                                 ry
                                                                      Ou
                                                                        tlet
                                               Nett Tank Volume
                                               Total Tank Volume
Top-Up Volume
                     Rainwater Tank Key Parameters
Ove
    r   flow
               Ou
                  tlet
Sec
   o    nda
        ry
           Ou
              tlet
t Tank Volume
al Tank Volume
   Project:                   UPRCT Handbook Demonstration Example
   Site Address               A Place, South Wentworthville
   Job No:                    W4574-2
   Designer:                  JC
   Telephone:                 (02) 9891 4633
                                                                         Site Data
   OSD Area:                                           Upper Parramatta River Catchment
   L.G.A                                               Parramatta City Council
   Site Area                                              0.24      ha       2,400     m2
   Total Roof Area                                        0.06      ha           600   m2
   Area of Site draining to OSD Storage                   0.216     ha       2,160     m2   Satisfactory
   Residual Site Area (Lot Area - Roof Area)              0.180     ha
   Area Bypassing Storage                                 0.024     ha
   Area Bypassing / Residual Site Area                   13.3%                              Satisfactory                             30% Max
   No. of Dwellings on Site                                 4                               Satisfactory
   Site Area per Dwelling                                 0.060     ha
   Roof Area per Dwelling                                 0.015     ha
                                                                 Basic OSD Parameters
                                                       Extended Detention                                              Detention
   Basic SSR Vols              Ext Detention Storage       300      m3/ha                              Total Storage     455       m3/ha
   Basic SRDs                         Primary Outlet       40       L/s/ha                          Secondary Outlet     150       L/s/ha
                                                                   OSD Tank Bypass
   Residual Lot Capture in OSD Tank                       87%
   Adjusted SRDs                                           36       L/s/ha                                               123       L/s/ha
671362298.xls                                                                                                                      Version 9 HED
               On-Site Detention Calculation Sheet for Upper Parramatta River Catchme
                                      Non-HED Secondary Outlet
                                       (Due to Elevated Downstream 100 yr ARI Flood Level)
    Project:                   UPRCT Handbook Demonstration Example
    Site Address               A Place, South Wentworthville
    Job No:                    W4574-2
    Designer:                  JC
    Telephone:                 (02) 9891 4633
                                                                            Site Data
    OSD Area:                                           Upper Parramatta River Catchment
    L.G.A                                               Baulkham Hills Shire Council
    Site Area                                              0.24     ha          2,400   m2
    Total Roof Area                                        0.06     ha           600    m2
    Area of Site draining to OSD Storage                   0.216    ha          2,160   m2   Satisfactory
    Residual Site Area (Lot Area - Roof Area)              0.180    ha
    Area Bypassing Storage                                 0.024    ha
    Area Bypassing / Residual Site Area                   13.3%                              Satisfactory
    No. of Dwellings on Site                                 4                               Satisfactory
    Site Area per Dwelling                                 0.060    ha
    Roof Area per Dwelling                                 0.015    ha
                                                                 Basic OSD Parameters
                                                        Extended Detention
    Basic SSR Vols              Ext Detention Storage       300     m3/ha                                   Total Storage
    Basic SRDs                         Primary Outlet       40      L/s/ha                            Secondary Outlet
                                                                   OSD Tank Bypass
    Residual Lot Capture in OSD Tank                       87%
    Adjusted SRDs                                           36      L/s/ha
                                                                   OSD Calculations
                                                        Extended Detention
    Basic SSR Volume            Ext Detention Storage      72.00    m3                                      Total Storage
                                                                        3
    Total Rainwater Tank Credits                           5.60     m
`   Storage Volume                                                                                                  Total
                                                                        3
    Storage Volume              Ext Detention Storage      66.40    m                           Flood Detention Storage
    OSD Discharges                     Primary Outlet      8.64     L/s                               Secondary Outlet
RL of Top Water Level of Storage                     10.100   m
RL of Orifice Centre-line                            9.100    m
Number of Orifices                               1     1                                                                 1
Estimated Downstream Flood Level                      8.90    1.5 yr ARI
Downstream FL - RL of Orifice Cente-line             -0.20    Satisfactory                              Satisfactory
Design Head to Orifice Centre                        1.000    m                          TWL Detn Storage - RL Orifice
Calculated Orifice Diameter                           64      mm       Satisfactory                     Satisfactory
                                             Overflow Weir & Freeboard Calculation
RL of Minimum Habitable Floor Level
RL of Minimum Garage Floor Level
Length of Overflow Weir
Site Runoff Coefficient                                                               Baulkham Hills Shire Council
Storm Intensity (5 min 100 yr ARI)
Peak Flow over Weir
Depth of Flow over Weir
Freeboard to Habitable Floor                                                                            Satisfactory
Freeboard to Garage Floor                                                                               Satisfactory
                                  Rainwater Tank Calculations (per Dwelling)
                     Only Complete this Section if a Rainwater Tank Airspace Credit is Claimed
                            The calculations assume that the same size rainwater tank is installed on each dwelling
% of Roof draining to Rainwater Tank                 80.0%                                 Satisfactory
Total Rainwater Tank Volume                           5.00    kL                           Tank Volume OK
Min Volume that triggers Top-up                       0.00    kL                           Note - Min Vol in Tank < 10% Total Ta
Total Tank Vol - Min Top-up Vol                       5.00    kL
                                                              Dedicated Airspace
Dedicated Airspace                                    0.00    kL                           Satisfactory
                                                Extended Detention
Dedicated Airspace Credit                             0.00    kL
Maximum Tank PSD                                      40      L/s/ha
Maximum Tank Discharge                                0.0     L/s
Maximum Head to Centre of Tank Orifice               0.000    m                            No Dedicated Airspace
Calculated Orifice Diameter                            0      mm                           No Dedicated Airspace
                                                               Dynamic Airspace
Maximum Dynamic Storage (Nett Vol)                    5.00    kL                           Controls minimum % Roof to Rainwat
Daily Demand on Rainwater Tank                       0.657    kL/d                         Satisfactory
Dynamic Airspace at start of Storm                    3.72    kL
                                     Extended Detention
Dynamic Airspace Credit                 1.40    kL
Combined Rainwater Tank Credit          1.40    kL
Maximum Rainwater Tank Credit           3.60    kL
Rainwater Tank Credit per Dwelling      1.40    kL
Rainwater Tank Credit for the Site      5.60    m3
        Signature:                                        Date:
ta River Catchment
Level)
y                      30% Max
y
         Detention
           520       m3/ha
           150       L/s/ha
           123       L/s/ha
         Detention
          124.80     m3
           6.16      m3
          118.64     m3
           52.24     m3
           29.60     L/s
                   10.300     m
                   10.100     m
              1      1
                    10.05     100 yr ARI
                    -0.05
                    0.200     m
                    178       mm
                   10.600     m
                   10.500     m
                    2.00      m
                    0.75
                    206       mm/h
                    92.7      L/s
                     93       mm
                    207       mm
                    107       mm
)
Credit is Claimed
n each dwelling
                    Min             Max
                   44.2%            100%
Vol in Tank < 10% Total Tank Vol
y
                  Detention
                    0.00      kL
ed Airspace
ed Airspace
inimum % Roof to Rainwater Tank
y
Detention
  1.54      kL
  1.54      kL
  5.00      kL
  1.54      kL
  6.16      m3