SAFEX FIRE SERVICES LTD
Instructions for Installation
                   Operation, Tests and Maintenance
                              Alarm Valve - FAVB Series
                                                                                 No False Alarm
                                                                                 Outstanding Durability
                                                                                 Anti-corrosive Trim
                                                                                 Confidential Operation
              FAVB 100(150)
                                                     Technical Data
General Description
 As an essential part of a wet sprinkler system,     MODEL : FAVB 100(150)
Paradise Industry Alarm Valve are used for           Maximum Working Pressure : 175 psi (12 bar)
device that detects water flow of fire equipment     Flange Connection : ANSI B16.1 FF Class 150
installed in residential area, manufacturing area,   Factory Hydrostatic Test Pressure :
and so on.
                                                      25 bar (350 psi)
 The valve is designed to initiate an alarm during
a sustained flow of water(such as the flow           Approximate Net Weight :
required by an open sprinkler)by operating an         4”(100A) – 38.6 kg (Included trim)
optional water motor alarm and/or alarm pressure
                                                      6”(150A) – 56.2 kg (Included trim)
switch.
                                                     Material
Features
                                                       Body/Cover/Drain. . . . . . Gray Cast Iron
- Cast iron body for extra hydrostatic strength       Seat ring .............. . . . . .............. Bronze
- Quick removal and easy service for rubber-faced
clapper                                              Clapper ......................... . .............. STS304
                                                     Clapper seat ................. . ................ VITON
                    SAFEX FIRE SERVICES LTD
    DATA SHEET FOR – Alarm Valve
                      PROPERTY                                                   DATA
Manufacturer                                          Safex Fire Services Ltd.
Number & Size                                         As per approved drawing ( dia 150 mm,100mm )
Type                                                  ANSI 150lb FF type
Flow & pressure rating                                175 PSI
Test pressure                                         350 PSI
MATERIAL
MOC Body                                              IS 210 Gr. 260
Valve internals                                       Cast bronze - IS 318 LTB -II
Seat Seal                                             Neoprene rubber
Diaphragm                                             Neoprene rubber
Differential pressure required for operation kg/cm2   Differential ratio - 50%
Water motor gong provided                             yes
TYpe                                                  Hydraulic ratio - 50%
Material of construction Housing                      Aluminium alloy - IS 617
Housing / cover / rotor                               Aluminium to IS 737
Gong                                                  Aluminium to IS 737
Manual actuation lever provided                       YES
Remote actuation with solenoid valve provided         yes
Resetting type                                        Manual resetting type
Alarm valve approved by TAC                           Yes, Also UL listed/FM approved
                  SAFEX FIRE SERVICES LTD
                                   DESIGN CRITERIA
                                   FIGURE 1. BASIC DIMENSIONS
            A            B   C      D           E     F           G       H              I     J        K         L
FAVB 100R   100      175     210   24           250   169         415    8-19D          376   50A      50        153
FAVB 150R   150      240     280   26           280   199         480    8-23D          391   50A      50        153
                                                PART LISTS
 NO.              ITEM             MATERIAL                 NO.                  ITEM                 MATERIAL
  1               Body              Cast Iron                6             Seat Cover                  STS 304
  2             Cover               Cast Iron                7          Retarding Chamber            SPCC/SPPS
  3          Seat Ring              Bronze                   8           Pressure Switch                    -
  4         Disc & Arm              STS 304                  9             Drain Valve              Cast Iron/Brass
  5          Disc Seat                  Viton               10           Alarm Test Valve               Brass
                   SAFEX FIRE SERVICES LTD
                                            OPERATION
When the fire protection system is initially being       Variable Pressure Trim
pressurized, water will flow into the system until       Retard is required.
the water supply and system pressure become              This trim set is used where water supply
equalized, and clapper is closed.                        pressure vary. The retard chamber and
                                                         mechanical sprinkler alarm line are drained
When a sustained flow of water occurs, such as           through a opened test valve line.
an activated sprinkler, open sprinkler or an open
authorized person’s test connection, the clapper
lifts from its closed position, this allows water flow   Constant Pressure Trim
into the intermediate chamber through the holes          Retard is not required.
in the seat ring and it will fill the retarding          This trim set is used where water supply
chamber completely. The water flows from                 pressure does not vary.
intermediate chamber to the alarm line and
activates the water motor alarm and/or the
pressure switch for the electric alarm. These
alarm continue to sound until the flow of water
stops.
                       Operational Mechanism of FAVB Alarm Valve
                       In service                                           In activate
               SAFEX FIRE SERVICES LTD
INSTALLATION                                            TEST & MENTANENCE
Before the Installation
Prepare sealing materials suitable for the FAVB To test the operation of the alarm valve,
Alarm Valve to be installed.                          open the inspectors test connection which
                                                      should cause the mechanical and the electric
When the installation is completed thoroughly clean alarm to sound. This test connection is
along the inner side of pipes. If possible, flush the usually located on the end or top line of the
pipe with water until it is completely rinsed out.    system.
Alarm Valve Installation                              To test supply piping for unobstructed flow,
Once again, clean inner side of valve body. Check     open alarm test valve(10) figure 1.
the disk, disk seat and seat ring hole before the     When test is completed make sure to close
installation.                                         drain valve(9) securely and close alarm test
                                                      valve(10).
Install the alarm valve, pressure gauge,
pressure switch and water motor alarm. In case of     Alarm valves and associated equipment shall
variable pressure system, install the retarding       periodically be given a through inspection and
chamber. For constant pressure system, install the    test. NFPA 25 provides minimum inspection,
water motor alarm directly without the retarding      testing and maintenance requirements. Alarm
chamberWater motor alarm connect directly the         valves shall be tested, operated, cleaned,
water motor line of the retarding chamber tee line.   inspected and parts replaced as required, at
Refer to the trim chart                               least annually.
                                                      FOR SAFEX FIRE SERVICES LTD.
                                                      APPROVED BY