ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
Presented by:
William Conner – Saudi
Aramco
Abraham Jacob
Operations Manager, ECB
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
Presentation Outline
• Why is an EIA carried out?
• When is an EIA carried out?
• What are the EIA requirements in KSA?
• What are international EIA requirements applied to major
projects in KSA?
• What are the main components of an EIA?
• What are the benefits of an EIA?
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
Why is an EIA carried out?
• Address environmental concerns at the feasibility stage
• Systematically analyze effects and consequences
• Identify alternatives
• Determine legal requirements & obligations
• Engage stakeholders & affected parties
• Establish mitigation measures at the planning stage
• Determine monitoring requirements
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
When is an EIA carried out?
Proactive Reactive
• Feasibility Stage • Formality
• Design Stage • Focused on getting
Regulator Approval
• Independent
• Accelerated Schedule
• Unbiased/Objective
• Unexpected/ Unwanted
• Participation
expense
• EIA not an expense
• Biased and
• EIA an Investment Preconceived
Desired Reality
Few Projects Most Projects
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
What are the EIA requirements in KSA?
Presidency of Meteorology and Environment Royal Commission
Category I Category II Category III Already
Project Project Project Completed EIA for
No significant Significant Significant industries in
Impacts within Impacts extend Jubail and Yanbu
impacts Industrial Cities
site beyond the site
Permit
Fill Category I Fill Category II Fill Category III
Application
Form Form Form
Forms
e.g. Minor e.g. Pipelines e.g. Major Type I, II, III
Repairs at within corridors Refinery Industries
existing facilities (< 50Km) complex
General Environmental Regulations 2002 Environmental Regulations 2004
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
International EIA requirements for projects in KSA
• Generally applicable to large scale projects and carried
out to satisfy financing agencies
e.g. Power, Refinery, Petrochemicals, Mining
• Standards and Guidelines include:
Equator Principles of 2006
IFC Performance Standards
World Bank Standards
World Health Organization Standards
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
Components of an EIA (The EIA Process)
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
EIA Report: Key Issues to be discussed
• Project Description
• Project Justification
• Project Alternatives
• Policy and Legal Framework
• Baseline Conditions (Air, Soil, Water, Flora and Fauna,
Marine, Communities, etc – as appropriate)
• Impact Assessment (can include modeling)
• Mitigation Measures
• Monitoring Requirements
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
What are the benefits of an EIA?
• Identify regulatory requirements at the planning stage
• Assess alternatives within and to the project
• Obtain extensive baseline data
• Systematically identify and assess impacts from
construction, operation & closure
• Incorporate mitigation measures into project design
• Establish plans for monitoring
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
THANK YOU!
Questions?????
ENVIRONMENTAL IMPACT ASSESSMENTS IN
SAUDI ARABIA
Presented by:
Abraham Jacob
Operations Manager, ECB