Unit I
Unit I
ASSESSMENT(EIA)
UNIT - I
EIA:
Protection of Environment
Mining
River valley
  This stage also defines the boundary and the time limit of
  the study
AIR:
Local associations
Proposal Identification
Screening
               Initial Environmental
                    Examination
                          Scoping
                                                             Resubmit
    Public            Impact Analysis
 Involvement          Mitigation & Impact
                         Management                          Redesign
                                               Decision
Public                                         Making
Involvement               EIA Report
typically occurs at
this stage it could        Review
occur at any other
stage of the EIA                    Approved              Not Approved
process
Objectives:
EIA applies to public and private sections. The six main players
  are:
Project appraisal
Ecology
Environmental Health
                                                                   1
  (1)            (2)                      (3)                           (4)                       (5)
        (ii)          Slurry All projects
        pipelines       (coal
        lignite and other
        ores)        passing
        through national
        parks/sanctuaries/
        coral          reefs,
        ecologically
        sensitive areas.
1(b)    Offshore         and All projects                                              Note
        onshore oil and gas                                                           Seismic surveys which
        exploration,                                                                  are part of Exploration
        development        &                                                          Surveys are exempted
                                                                                      provided the concession
        production
                                                                                      areas have got previous
                                                                                      clearance for physical
                                                                                      survey
1(c)    (i) River Valley (i) ³ 50 MW hydroelectric (i) ≤ 50 MW ³ 25 MW                General Condition shall
             projects                                                                 apply.
                         power generation;         hydroelectric     power
                                                                                      Note: -
                                                   generation;                        Category ‘B’ river valley
        (ii) Irrigation  (ii) ³ 10,000 ha. of (ii) < 10,000 ha. > 2000                projects falling in more than
             projects    culturable command area. ha.      of    culturable           one state shall be appraised
                                                   command area                       at the Central Government
                                                                                      Level.
1(d)    Thermal      Power ³ 500 MW (coal /lignite / ≥ 50 MW to < 500 MW General Condition shall
        Plants             naphtha and gas based);   (coal/lignite/ naphtha and apply.
                                                          gas based);               Note:-
                             ³ 50 MW (all other fuels                              (i) Thermal Power plants
                             except biomass ).                                         up to 15MW based on
                                                                                       biomass        or      non
                                                          <50 MW ³ 5MW (all other      hazardous       municipal
                             ³ 20MW (using municipal      fuels except biomass and     solid     waste      using
                                                          municipal     solid  non     auxiliary  fuel   such  as
                             solid non hazardous waste,                                coal / lignite /petroleum
                             as fuel).                    hazardous waste).            products up to 15% are
                                                                                       exempt.
                                                          ≥ 15 MW plants based on
                                                          biomass fuel.
                                                   2
    (1)           (2)                        (3)                         (4)                          (5)
2 Primary Processing
                                                        3
    (1)            (2)                       (3)                           (4)                        (5)
3( b)     Cement plants       ³        1.0            million <1.0            million General               Condition
                              tonnes/annum         production tonnes/annum             shall apply
                              capacity                        production capacity. All
                                                              Stand alone grinding
                                                              units
4 Materials Processing
4(b)      i)   Coke oven      ³ 2,50,000 tonnes/annum           < 2,50,000 and         General      Conditions
               plants                                           ³ 25,000 tonnes/annum. shall apply.
                                                                All projects.
          ii) Coaltar
              processing
              units.
4(d)      Chlor-alkali        ≥ 300 TPD production              (i)     All      projects   General as well as
          industry            capacity if a unit located        irrespective of the size,   specific     Conditions
                              outside      the      notified    if it is located in a       shall apply.
                              industrial area/ estate.          notified       industrial
                                                                Area / Estate.               No new Mercury Cell
                                                                                            based plants will be
                                                                (ii) < 300 tonnes per       permitted and existing
                                                                day (TPD) and located       units converting to
                                                                outside a Notified          membrane            cell
                                                                Industrial Area /Estate.    technology are exempt
                                                                                            from the Notification.
4(f)      Skin      /  hide New projects outside the            All new or expansion of General as well as
          processing        industrial      area       or       projects located within specific   Conditions
          including tanning expansion of existing units         a notified industrial shall apply.
          industry.         out side the industrial area        area/ estate
                                                         4
    (1)            (2)                        (3)                    (4)                       (5)
5 Manufacturing/Fabrication
5(a)      Chemical            All projects including all   All      Single   Super   General       condition
          fertilizers         Single Super Phosphate       Phosphate       without   shall apply.
                              with H2SO4 production        H2SO4 production and      Granulation of single
                              except    granulation  of    granulation of chemical   super        phosphate
                              chemical fertilizers.        fertilizers.              powder is exempt.
5(e)      Petroleum           Located     out side the Located in a notified General as well as specific
          products        and notified   industrial area/ industrial area/ estate condition shall apply.
          petrochemical       estate
          based processing
          such as production
          of carbon black                                                            Note:-
          and       electrode                                                        Manufacturing       of
          grade      graphite                                                        products from polymer
          (Processes other                                                           granules is exempt.
          than cracking and
          reformation     and
          not covered under
          the complexes).
                                                    5
  (1)           (2)                       (3)                           (4)                     (5)
5(f)    Synthetic organic     Located      outside     the   (i) Located       in  a General as well as
        chemicals industry    notified industrial area/          notified industrial specific       Condition
        (dyes    &      dye   estate except small units as       area/ estate.       shall apply.
        intermediates; bulk   defined in column (5).
        drugs           and                                                           Small units: with water
        intermediates                                                                 consumption        <25
                                                                                        3
        excluding      drug                                  (ii) Small units      as m /day,            fuel
        formulations;                                             defined     in      consumption < 25 TPD
        synthetic rubbers;                                        column (5).         and not covered in the
        basic       organic                                                           category of MAH units
        chemicals, other                                                              as        per       the
        synthetic organic                                                             Management, Storage
        chemicals       and                                                           and      Import      of
        chemical                                                                      Hazardous Chemical
        intermediates)                                                                Rules, 1989.
5(g)    Distilleries          (i)  All Molasses based Non-molasses             based General      Condition
                                   distilleries       distilleries –                 shall apply.
                                                      < 60 KLD
                             (ii) Non-molasses based
                             distilleries ³ 60 KLD
5(h)    Integrated     paint -                        All projects                     General      Condition
        industry                                                                       shall apply
5(i)    Pulp and       paper Pulp manufacturing and          Pulp      manufacturing   General      Condition
        industry             Pulp       and      Paper       from waste paper and      shall apply
                             manufacturing     industry      paper     manufacturing   Note:-
                             except from waste paper.        from waste paper pulp     Paper manufacturing
                                                             and other ready pulp.     from waste paper pulp
                                                                                       and ready pulp without
                                                                                       deinking,    bleaching
                                                                                       and     colouring    is
                                                                                       exempt.
5(j)    Sugar Industry        -                              ³      5000 tcd cane      General      Condition
                              -                              crushing capacity         shall apply
6                             Service Sector
6(a)    Oil       &        gas All projects                                            -
        transportation pipe -
        line (crude and
        refinery/
        petrochemical
        products), passing
        through       national
        parks
        /sanctuaries/coral
        reefs /ecologically
        sensitive        areas
        including        LNG
        Terminal
                                                      6
    (1)           (2)                       (3)                        (4)                        (5)
6(b)      Isolated storage &                 -              All projects             General            Condition
          handling         of                                                        shall apply
          hazardous
          chemicals (As per
          threshold planning
          quantity indicated
          in column 3 of
          schedule 2 & 3 of
          MSIHC         Rules
          1989      amended
          2000
7(c)      Industrial estates/   If at least one industry in Industrial estates housing   General as well as
          parks/ complexes/     the proposed industrial at least one Category B          specific Conditions
          areas,      export    estate falls under the industry and area <500            shall apply.
          processing Zones      Category       A,      entire ha.                        Note:
          (EPZs),    Special    industrial area shall be                                 1.   Industrial Estate of
          Economic Zones        treated as Category A,                                        area below 500 ha.
                                                                                              and not housing
          (SEZs),    Biotech    irrespective of the area.                                     any industry of
          Parks,     Leather                                                                  Category ‘A’ or
          Complexes.                                                                          ‘B’     does     not
                                                                                              require clearance.
                                Industrial estates with area Industrial estates of area>
                                greater than 500 ha. and 500 ha. and not housing 2. If the area is less
                                                                                         than 500 ha., but
                                housing at least one any industry belonging to           contains building
                                Category B industry.         Category A or B.            and    construction
                                                                                              projects > 20,000
                                                                                              Sq.mtr. and or
                                                                                              development area
                                                                                              more than 50 ha it
                                                                                              will be treated as
                                                                                              activity listed at
                                                                                              serial no. 8(a) or 8
                                                                                              (b) in the Schedule,
                                                                                              as the case may be.
                                                       7
  (1)             (2)                       (3)                         (4)                    (5)
7(d)    Common                   All integrated facilities All facilities having land General Condition
        hazardous waste          having incineration & fill only                      shall apply
        treatment, storage       landfill or incineration
        and           disposal   alone
        facilities (TSDFs)
7(e)    Ports, Harbours, ³ 5 million TPA of cargo < 5 million TPA of cargo                   General Condition
        break     waters, handling       capacity handling capacity and/or                   shall apply.
        dredging.         (excluding       fishing ports/ harbours ³10,000
                          harbours)                TPA of fish handling                      Note:
                                                   capacity                                  1. Capital dredging
                                                                                             inside and outside the
                                                                                             ports or harbours and
                                                                                             channels are included.
                                                                                             2.          Maintenance
                                                                                             dredging is exempt
                                                                                             provided it formed part
                                                                                             of the original proposed
                                                                                             for which environment
                                                                                             Management          Plan
                                                                                             (EMP) was prepared
                                                                                             and       environmental
                                                                                             clearance obtained.”
7(g)    Aerial ropeways          (i) All projects located at All projects except those General Condition
                                     altitude of 1,000 mtr. covered in column (3).     shall apply
                                     And above.
                                                        8
                          (ii) All projects located in
                               notified ecologically
                               sensitive areas.”
7(h)   Common Effluent                                   All projects   General Condition
       Treatment Plants                                                 shall apply
       (CETPs)
                                                  9
  (1)            (2)                    (3)                            (4)                  (5)
7(i)    Common                                          All projects               General Condition
        Municipal    Solid                                                         shall apply
        Waste
        Management
        Facility
        (CMSWMF)
8                            Building or Construction projects or Area Development projects and
                             Townships
8 (a)   Building       and                            >20,000 sq.mtrs and    The term “built up area”
        Construction                                  <1,50,000 sq.mtrs. of for the purpose of this
                                                                             Notification the built up
        projects                                      built-up area          or covered area on all the
                                                                                  floors    put   together,
                                                                                  including its basement
                                                                                  and other service areas,
                                                                                  which are proposed in the
                                                                                  building or construction
                                                                                  projects.
                                                                                  Note      –       “General
                                                                                  conditions”     shall not
                                                                                  apply.
                                                  10
Note:-
General Condition (GC):
Any project or activity specified in Category ‘B’ will be appraised at the Central level as
Category ‘A’, if located in whole or in part within 5 km from the boundary of : (i) Protected
areas notified under the Wildlife (Protection) Act, 1972 (53 of 1972); (ii) Critically polluted areas
as identified by the Central Pollution Control Board constituted under the Water (Prevention and
Control of Pollution) Act, 1974 (6 of 1974) from time to time; (iii) Eco-sensitive areas as
notified under sub section (2) of section 3 of the Environment (Protection) Act, 1986, and (iv)
inter-State boundaries and international boundaries: provided that for River Valley Projects
specified in item 1(c), Thermal Power Plants specified in item 1 (d), Industrial estates/ parks/
complexes/ areas, export processing Zones (EPZs), Special Economic Zones (SEZs), Biotech
Parks, Leather Complexes specified in item 7 (c) and Common hazardous waste treatment,
storage and disposal facilities (TSDFs) specified in item 7 (d), the appraisal shall be made at
Central level even if located within 10 km.
Provided further, that the requirement regarding distance of 5 km or 10 km, as the case may be,
of the inter-State boundaries can be reduced or completely done away with by an agreement
between the respective States or the Union Territories sharing the common boundary in case the
activity does not fall within 5 km or 10 km, as the case may be of the areas mentioned at item
(i), (ii) and (iii) above.”
11