Saudi Aramco Piping Reference Drawings
Saudi Aramco Piping Reference Drawings
"
DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175
FB01 ⅛
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
-3
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING AD-036627
AWAY AWAY
'
04
INSULATION DETAILS FOR HOT PIPING AA-036911
PL01 SB05 3
68 .1 V
INSULATION DETAILS FOR COLD PIPING AA-036913
BF01 L
E FT
INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630
GV01 IN03
T02 |
0
TOWARD TOWARD C01 F05 60
V
P03 W01
0 FT SB07
50
DOWN
B01
NOTES
CA
FTV
0
48
L 1
511
NO LE 0-021
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
RT D 3
FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.
U5 3- (
TY
000 P16C P.
16 17
H 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
7 1 ) V
1"
01
"-F 10 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
W- SB02
13
0 94 ST01 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
#
90
53 7
G01 50
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
EX -1
LC 53 -1 ER
"
I 4"
5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.
ST
. 0U F02 6 PS 10 I N
33 A 6. GASKET ALLOWANCE 3MM
NE -3 R
PG B ST
W V)
7. PIPING MATERIAL IS
12
PS
-4 93 FT
( PIPE SIZE SCHEDULE SPECIFICATION
| EL. 2"
10 17 53 -3 (
NO FT -
)1
15
16" STD SMLS, API 5L (CEMENT LINED)
C P01
4' 30 13 TE V 80
( 8)
79 6- E-
10" SCH.40 SMLS, API 5L (CEMENT LINED)
-3 5 -8 (
TY
⅛
" 10 17 23 ) P. D- NOT 6" SCH.40 SMLS, API 5L (CEMENT LINED)
8 03 07 ) (
12
11
09
0)
8. WELDING STRESS RELIEF - YES NO
U -1
20 C0 TE W
100% X-RAY SPOT X-RAY 01-SAMSS-10
(
TY
-1 ) 0 1L N O 7
FS T. 55 3- ( NE B10 P.
)
9. TESTING SHOP HYDROSTATIC TEST - YES NO
IS 16 CR16C10 45 19
O#
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
P 0 -F E E02
.V # GU S-0 41 10
" BY IN01 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
A. DE 4A
I
ST. 3 7-001 PS
-3
SAES-L-105 CLASS 1LC0U . ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
I 3 0
NO PG- A
1 F01
30
5 EX 021 19B 01
( (
TY 11. INSULATION REQUIRED - YES NO
0- 0 TE 4 P.
-1
BI -8 0 ) INSULATION SHOWN ON DRAWING
1BV16C
0
x1 ED. Y U57 ) 30 12. EXT. PAINTING AS PER APCS-1B.
" B
E16C1 16 .R V)
13. INTERNAL CEMENT LINING AS PER APCS-103.
1FL16C NC F T
CO ( 14. PROVIDE WELDING SLEEVE AT EVERY 6M OR 12M PIPE LENGTH
TO FACILITATE LINING.
385
1MB16CBV TE16C .
W16C6 GD 83
FL 22
88 F
R 54 *
23 CR16C10 # 0
13
50 G-
W16C10
-1 57- "
51
0" SPOOLS TO BE FABRICATED BY VENDOR
1 U -7
'
0" | 102 NO.
MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT
6"
10 99
"
16 .RE "
-F
-
NC FO FW- 12
W-
CO R 9 95
DW CO 452
94
0U N
LC G. T' -1L
60
87 -1 BB N. C0
11 62 -0 S
-1
U
94 GV12BB 12 16 EE
LC
W- °3 30 *
-F 0' 3
0U
PS " NP12CN TR6C4 V .00 "
10
PI
-1 3 1�
1B -1
1FB4CN12 1FL4C 2'
5161
10
P06C .
P10C
WB12CN 1GKI4C EL
1MB4GI ½
"
| REV. NOTES (EWO#19B107):
| EL. 1FL6E
10 4"
4'
-3 1FL6C U DENOTES FACILITIES TO BE SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
⅛ C0 1.
" 1L E6C1 INSTALLED UNDER EWO#19B107.
1GK6S FS U
NO.
MARK NO. SIZE
NO.
MARK NO. SIZE
1 E0
PIECES PIECES
PG 06
286
1MB6SP - 1L
E10C1 GU 6-1 2. ALL DIMENSIONS ARE IN MILLIMETERS, AND ALL ELEVATIONS
1CS6C I
D
5m E
m ARE IN FEET & INCHES, UNLESS OTHERWISE NOTED.
W
GA IT 1BV6C
P H
13
3FL3F #
50 50
# 3. WELDED BUTT JOINT FOR CEMENT LINED PIPE SHALL BE
-1 ER
26
6" I 8 -1
3GKI3
. A
N 31 6" A. AS PER SAUDI ARAMCO STD. DWG. AB-036090.
GD
R
3MB3GI FL A
ST 63 BU
.V
2 4. ALL WELDING AND INSPECTION FOR PIPING SHALL BE AS PER
F
F 05 3 23 SAES-W-011.
12
95 0# G-
25 7- " 5
150#
GV12BB '
| 103 FOR THE AS-BUILT DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
0
NP12CN TR10C4
20 15
00
6. ALL ABOVEGROUND PIPING SHALL BE EXTERNALLY PAINTED WITH
1BF4CN12 1FL4C " " 2 APCS-26 (SAFETY RED, RAL 3000) IN ACCORDANCE WITH SAES-H-001 REFERENCE DRAWINGS
� x3 38
-3
' 6" F
WB12CN 1GKI4 PI
03 T AND SAES-B-067.
.1
DRAWING CONTROL FOR JO-10-02133-0001 BD-015753
R
EL
5163 ER6C3 E
1MB4GI
U 7. NEW PIPE SUPPORTS SHALL BE IN ACCORDANCE WITH PNFS0500 AND CONSTRUCTION SCOPE OF WORK BE-015754
| C0
" 1L PNFS0209 OF PIP PNFS0001. P & ID A-B20784.007
U
½ E0 8. BOTTOM OF PIPE AND SUPPORT SHALL HAVE PTFE IN BETWEEN.
4" 1L PIPING PLAN XA-B21091.001
INST.
" FS
x8 GU 106 TIE-IN INDEX BB-016300
" I
DE W TO FABRICATION.
NE
1GV10C
10 F #
T U
50 . PIPE SUPPORT DETAIL BA-016360
R D0
1B 0U -1 ST
I 10.EXISTING VALVE TO BE RE-USED AND RELOCATED.
PIPING
ER10C8 E "
10 A. EX 1 1BV16C DRAWING CONTROL FOR EWO#19B107 BD-107727
000
BY
C
1L .V 33- 0U
1FL8C GA 021 03 LC 1FL16C TIE-IN INDEX BB-107739
0- 12
3 1 1 0 A-
1GKI8 51 7 84
4 1MB16CBV MTO TO-016304-001
U5
# 3
GD
. 50 W- *
1MB8GI -1 ER 2 -F
FL "
10 I 19 16
"
FF 052
N 6 HOLD (EWO-19B107):
RA 33
.
#
# G- ST
ST
25
50
8
-1 U57
- " 31 19
I
1. DRAWING REVISION NUMBER IS ON HOLD AND
8" ⅞ EE
-1
23
REVISION VALIDATION
'-4 .T EX
"
| 103 8 ED
16
44
20 0"
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
x1
8
"
10
16
19B107-001
8 1
0-
38
#
021
50
1FL10C 3
U5 3-
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
TR16C10 000 * (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
-1
1GK10S 7 1
"
08
10
NE
ST
I 19B107 CONSTRUCTION UNTIL CERTIFIED AND DATED
EX
75
21
ST
DRAWING TYPE