RD 20039 001 - 00
RD 20039 001 - 00
PT NPD
TOWARD TOWARD
NO DESCRIPTION (IN) CMDTY CODE QTY
DOWN
SHOP MATERIALS
S7 PIPE NOTES
F4 48"NPD
SEE ISO SWH6-A2-48-1000-100-C1 1 PIPE; W.T. = 11.13 MM; BE x BE; 48 PABYAP-SA 33.6 M 1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.
R00R2-G57-P-2748 S8 THIS SUPPORT TO BE WELDED BEFORE LINING EFW; ASME B36.10; API 5L Gr. B PSL 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
RD-40114 G2-A2-48-2 2 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
S9
X 9073040 FITTINGS 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
Y 9741227 G57-SPS-208 (B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
S10 14 G2-A2-48-2 B16.9; ASTM A234 WPB PIPE SIZE SCHEDULE SPECIFICATION
THIS SUPPORT TO BE WELDED BEFORE LINING 6 PIPE SUPPORT: 48 SUP 2 FLANGED. HYDROSTATIC TEST PRESSURE
3 PH1-S4-48-11.13-1100-C1 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
S11 S14 7 PIPE SUPPORT: 48 SUP 2 1LE0P03 .
13 SAES-L-105 CLASS ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
2606
THIS SUPPORT TO BE WELDED BEFORE LINING 9 PIPE SUPPORT: G57-SPS-208 48 SUP 2
PH1-S4-48-11.13-800-C1 2021 10 PIPE SUPPORT: LM3-P3-48-0-C1 48 SUP 2
THIS SUPPORT TO BE WELDED BEFORE LINING
S16 11 PIPE SUPPORT: SCH1-A3-48-700-100-C1 48 SUP 1
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
S17 TH2-VP-48-30-STD-1600-90-C1 12 PIPE SUPPORT: 48 SUP 1
X 9073040
SWH1-A3-30-600-223-C1
3576
Y 9720191 THIS SUPPORT TO BE WELDED BEFORE LINING PH1-S4-48-11.13-800-C1
THIS SUPPORT TO BE WELDED BEFORE LINING EL +120041 13 PIPE SUPPORT: SWH6-A2-48-700-100-C1 48 SUP 1
SPOOLS TO BE FABRICATED BY VENDOR
14 PIPE SUPPORT: G2-A2-48-3 48 SUP 1
S9
1
NO. WEIGHT NO. WEIGHT
MARK NO. SIZE MARK NO. SIZE
15 PIPE SUPPORT: BR-P1-48-C1 48 SUP 1 PIECES LBS PIECES LBS
REFERENCE DRAWINGS
LDT CD-083200.015
SYSTEM AS IDENTIFIED ON ISOMETRIC, VALVE PAINTING SHALL BE REMOVED AT SITE AND 48"-P-2748-1LE0P03 ISO
SELECTED PAINTING SYSTEM FOR LINE ON ISOMETRIC SHALL BE APPLIED ON VALVE
PROCESS
INT. CHEMICAL PIPING DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % MT/LP INSULATION TRACING PAINTING STRESS LINE ID
FBE CLEANING MATERIAL TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. WET CRUDE HANDLING FACILITIES
LINED CLASS (DEG. F) (PSIG) (DEG. F) (MM.)
STRESS ANALYSES (PSIG) SAFANIYAH SAUDI ARABIA
BY CHECKED PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
YES 1LE0P03 200 250 108 180 427.5 Water 10 10 100 NOTE APCS-1D SYS-253 U02R2-G57-P-2748
24 NO. OF SHT: 011 G57 L RD-20039 001 00