TaB-20 Tubing Tally

This document provides a wellbore sketch and details for the Tapis B-20 well. It shows the long string and short string casing details, perforation intervals, and workover history. The well was originally completed in 1980 with the J-20 interval perforated in the short string and the J-25/30 intervals perforated in the long string. It has undergone several workovers to address tubing leaks, potential casing leaks, and valve issues. The most recent work in 2017 identified leaks in the short string at three depths and a casing leak.

Uploaded by

Lrez1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views18 pages

TaB-20 Tubing Tally

This document provides a wellbore sketch and details for the Tapis B-20 well. It shows the long string and short string casing details, perforation intervals, and workover history. The well was originally completed in 1980 with the J-20 interval perforated in the short string and the J-25/30 intervals perforated in the long string. It has undergone several workovers to address tubing leaks, potential casing leaks, and valve issues. The most recent work in 2017 identified leaks in the short string at three depths and a casing leak.

Uploaded by

Lrez1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Tapis B-20

WELLBORE SKETCH

SHORT STRING McEvoy Hanger LONG STRING


3-1/2", 9.2 lb/ft, N-80, HYD A-95 WI WI 3-1/2", 9.2 lb/ft, N-80, HYD A-95

'B' SVLN (DKS i/v) 157.3m 'B' SVLN (DKS i/v)

'F' Nipple (2.81") 917.8m 'F' Nipple (2.81")

May 2016: Tubing joint leak at 1448m

May 2016: Potential csg leak at 1608m

Mar 2015: Tubing leak at 1665m

GLM #1 (1" DV) 2401.8m


GLM #1 (1" DV)

'F' Nipple (2.81")

'A-5' Packer
'R' Nipple (2.75" PB, 2.69" NG) w RZG Plug 2428.0m
(May 2016: Plug leaking)

J-20: 2456.4 - 2463.1m Blast Joints

'A' Polished Nipple (Leak)

'DB' Packer

'R' Nipple (2.75" PB, 2.69" NG)

J-25: 2494.5 - 2503.6m

J-30: 2537.5 - 2551.2m


2555.4 - 2561.2m
2563.4 - 2566.7m

2581.7m
Max Angle = 46.5° 9-5/8", 40.0 lb/ft, K-55 @ 1826.4 mMD
9-5/8", 40.0 lb/ft, N-80 @ 2596.9 mMD
LONG STRING
-1/2", 9.2 lb/ft, N-80, HYD A-95

± 6° 165.8m

± 36° 927.2m

max 0.25 bbl/min


min 300 psi

TaB-20U Depths

± 47° 2411.9m Ft Metres Reference


GLM#1 7874 2400.0 Tally
± 47° 2421.9m Tubing 7880 2401.8 Tally
Joint 7912 2411.6 Tally
± 47° 2423.5m Top of stuck toolstring 7937 2419.1 WL Depth
Tubing 7944 2421.3 Tally

hed Nipple (Leak) 2465.8m

2478.0m

le (2.75" PB, 2.69" NG) ± 46° 2482.3m

40.0 lb/ft, K-55 @ 1826.4 mMD


40.0 lb/ft, N-80 @ 2596.9 mMD
max 0.25 bbl/min
EMEPMI WELL-BY-WELL REVIEW PROFORMA
WELL TaB-20U

A. Current Utility

Sand Interval mMDrkb Perf Interval mMDrkb Perf Interval mTVDss


Date
Sand Completed Top Bottom Top Bottom Top Bottom
1 J-20 May-80 2431 2475.8 2456.4 2463.1

Rate GOR Contacts


Tubing (stb/d) Water Cut (%) (scf/stb) GOC OWC Cum (MBO)

B. Workover History

Date Workover Unit Description


Jul-81 CWR Re-completed as a dual WI with J-20 in the SS and J-25/30 in the LS.
RIH and pulled Ball Valve at 157m RKB. RIH with Sinker Bar to 2426m RKB.
Aug-82 WLU Conduct SBHP survey. RIH set Ball Valve at 157m RKB.
RIH and pulled Ball Valve at 157m RKB. RIH 2.5" GR and tagged R Nipple at
Jul-83 WLU 2427m RKB. Rig up E-line and run GR/CCL/pressure to 1036m RKB. Reset Ball
Valve.
RIH EMR gauge and conduct injectivity Fall-Off test.
Jul-83 WLU
RIH 3" GS pulling tool + probe + prong and retrieved 2.81" DKS at 157m RKB.RIH
Jul-90 WLU 2.7" GR and tagged R nipple at 2434m RKB. Conduct caliper survey. Reset 2.81"
DKS at 157m RKB.
Jun-93 Prod Reported high PCP.
Diagnose high PCP. 2.75" RB-2 tagged R-nipple @ 2488m. PCP comm with SS. Top
Apr-94 WSU packer leak. While SS is injecting (500-3000 psi in 1.5 hrs), PCP increased from (0-
400 psi). While SS is SI (1700-300 psi in 10 mins), PCP responded from 400-290
psi. LS stayed at 0 psi during the test.
RIH 3" GS + M Probe and E prong to 153m RKB. Latched and retrieved DKS. RIH
Jul-97 WLU 3/16 wire scratcher from 137 to 1158m RKB. Changed V packing and reset 2.81"
DKS (Baker sur set lock).

Failed to unscrew the top X- mas crown cap due to internal thread badly coroded.
soak with WD 40 for day crew to continue. GR tagged top of IV @157m.
Mar-15 WLU Recovered DKS IV. GR tagged R No Go Nipple @2427.7. Completed MIT caliper
survey and reset DKS IV. MIT survey indicates 1 leak at 1665m; max penetration
28%; wall loss <10%
Retrieve 2.81"DKS Insert valve at TRSV @ 147.3 m WLRKB. Tubing clearance
check with 2.80"Gauge Ring tag R-Nogo Nipple @ 2426.7 m WLRKB and set
May-16 WLU 2.75"RZG Plug at R-Nogo Nipple. Completed ALFA survey as per program. Reset
DKS IV. Cycled C/Line. C/Line holding good. Good negative test on IV

ALFA survey indicate leak in SS at 1448m, 1665m and csg leak at 1608m. LS leak
identified in A polished nipple at 2465.8m
Jun-17 CDFT - WV not done - blinded, CV and SSV fail WIMS. LMV and ScSSV pass
Hit Team
WIMS

Jul-17 Hit Team / Wellhead Performed cavity leak test to 3,000psi - holding good
Specialist

Aug-17 Re-tested SSV & LMV post greasing for flowline tie-in - all valves tested pass
Hit Team
WIMS

C. Performance Trend Observations

- Decline trends (comments on base performance, uncertainties and step changes)

- Prolonged shut-in behaviour (Evidence of recharge?)

- Interactions with nearby wells

- Other comments
Note: Offset wells in B-10U & 9U high w/cut in J-20

D. Wellbore Utility Plan

Plan/Description Justification Priority (H/M/L) & Timing


Maintain for B-18 J-20 reservoir. If B-18
watered out in J-20 res - WI not
Current WI -SI for Reservoir management required.
Opportunity 1

Opportunity 2
Infill potential
E. Follow-up Actions:

Action Responsibility
1 Check for SS/LC communication SHSM
2
3
Comment

Cum (MBO)

-25/30 in the LS.


Sinker Bar to 2426m RKB.
RKB.
GR and tagged R Nipple at
re to 1036m RKB. Reset Ball
.
d 2.81" DKS at 157m RKB.RIH
uct caliper survey. Reset 2.81"

488m. PCP comm with SS. Top


.5 hrs), PCP increased from (0-
CP responded from 400-290

atched and retrieved DKS. RIH


ged V packing and reset 2.81"

internal thread badly coroded.


ed top of IV @157m.
2427.7. Completed MIT caliper
ak at 1665m; max penetration
m WLRKB. Tubing clearance
2426.7 m WLRKB and set
survey as per program. Reset
negative test on IV

and csg leak at 1608m. LS leak

MS. LMV and ScSSV pass

od

-in - all valves tested pass

Priority (H/M/L) & Timing


Timing
Oct 2004
EMEPMI WELL-BY-WELL REVIEW PROFORMA
WELL TaB-20L

A. Current Utility

Sand Interval mMDrkb Perf Interval mMDrkb Perf Interval mTVDss


Date
Sand Completed Top Bottom Top Bottom Top Bottom
1 J-25 May-80 2486 2529.1 2494.5 2503.6

2 J-30 Sep-81 2536.3 2569 2537.5 2551.2


Sep-81 2555.4 2561.2
3 Sep-81 2563.4 2566.7

Rate GOR Contacts


Tubing (stb/d) Water Cut (%) (scf/stb) GOC OWC Cum (MBO)

B. Workover History

Date Workover Unit Description


Jul-81 CWR Re-completed as a dual WI with J-20 in the SS and J-25/30 in the LS.
Jul-83 WLU Performed injection Fall-Off test
Apr-84 WLU Performed PLT survey
Jul-88 WLU Retrieved Ball Valve at 167m RKB. RIH with 2.42" GR at tagged TD at 2565m
RKB. Performed PLT survey. Reset Ball Valve at 167m RKB.
Baker Sur-set lock c/out. Retrieved DKS Ball Valve. Reciprocate 2.81" wire
Jul-97 WLU scratcher at 162m RKB. Servive and clean DKS ball valve. Replace M-Lock with
Sur Set Lock and tested OK.Unable to RIH 2.81" DKS - hung up at tbg hanger.
Tappered down several times and able to pass thru. Set at 162m RKB.

G/ring tagged top of DKS IV @ 165.8 mWLRKB. Attempt to remove the G/ring
from lubricator but unable to bleed down press to zero. Inject sealant on LMV and
Mar-15 WLU CV. LMV holding good but CV slightly blowing. Manage to remove the G/ring.
Completed MIT survey. Obtain good data. Completed set back DKS IV at B SVLN
and tested good. Max penetration at 26; wall loss <10%

Retrieve 2.81"DKS Insert valve at TRSV @ 166.1 m WLRKB. RIH 2.80"Gauge


Ring h/up at 2nd F-Nipple @ 2420.2 m WLRKB. RIH 2.72"Gauge Ring and tag R-
No go nipple @ 2483.3 m WLRKB. Complete 3 passes of ALFA. Reset DKS IV at
May-16 WLU TRSV @ 166.1m

ALFA survey indicate leak in SS at 1448m, 1665m and csg leak at 1608m. LS leak
identified in A polished nipple at 2465.8m
Jun-17 CDFT - WV not done - blinded, CV and SSV fail WIMS. LMV and ScSSV pass
Hit Team
WIMS

Jul-17 Hit Team / Wellhead Performed cavity leak test to 3,000psi - holding good
Specialist

Aug-17 Re-tested SSV & LMV post greasing for flowline tie-in - all valves tested pass
Hit Team
WIMS

C. Performance Trend Observations

- Decline trends (comments on base performance, uncertainties and step changes)

- Prolonged shut-in behaviour (Evidence of recharge?)

- Interactions with nearby wells

- Other comments
Note: Offset wells in B-18, B-16, B-10l, B-11U< B-9L high w/cut in J-25/30
WI required if add perf in J-25 of B-9L

D. Wellbore Utility Plan

Plan/Description Justification Priority (H/M/L) & Timing

Current WI -SI for Reservoir management WI not required in J-25/30. Low priority to add perf in J-25
Opportunity 1

Opportunity 2
Infill potential

E. Follow-up Actions:

Action Responsibility
1
2
3
Comment

Cum (MBO)

-25/30 in the LS.

GR at tagged TD at 2565m
67m RKB.
Reciprocate 2.81" wire
l valve. Replace M-Lock with
KS - hung up at tbg hanger.
. Set at 162m RKB.

tempt to remove the G/ring


ero. Inject sealant on LMV and
nage to remove the G/ring.
ed set back DKS IV at B SVLN
10%

m WLRKB. RIH 2.80"Gauge


H 2.72"Gauge Ring and tag R-
ses of ALFA. Reset DKS IV at

and csg leak at 1608m. LS leak


MS. LMV and ScSSV pass

od

-in - all valves tested pass

Priority (H/M/L) & Timing

ow priority to add perf in J-25

Timing