GEM4D Open Pit Reconciliation

The document discusses reconciliation techniques for open pit mines to quantify deviations between planned and actual wall geometries. It describes traditional manual reconciliation methods and introduces an automated reconciliation method developed using GEM4D software. The automated method calculates crest loss, toe gain and catch berm widths statistically from design and survey strings to aid in geotechnical wall design and performance analysis.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
399 views5 pages

GEM4D Open Pit Reconciliation

The document discusses reconciliation techniques for open pit mines to quantify deviations between planned and actual wall geometries. It describes traditional manual reconciliation methods and introduces an automated reconciliation method developed using GEM4D software. The automated method calculates crest loss, toe gain and catch berm widths statistically from design and survey strings to aid in geotechnical wall design and performance analysis.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Open Pit reconciliation

Frans Basson – Global Geotechnical Group


Alice Jack – Newmont Boddington Gold

1. Introduction
In mining, reconciliation refers typically to a comparison between an actual outcome against a
planned design expectation. The usual purpose is to either learn from the comparison to improve
the outcome, or to quantify the deviation and determine if the result is within acceptable limits. A
few examples where reconciliation could assist are:
1) Evaluate an extraction quality.
2) Highlight deficiencies in a process or process execution.
3) An objective review of conditions, outcomes, or impacts from a process change.
4) Compare areas with different processes, rock types, structural influences, time periods,
stress conditions.

This discussion is focussing on reconciliation from a geotechnical perspective to determine the


amount of cress loss, toe flare, and catch berm capacity. At KCGM and Boddington, the achievable
wall angles are mainly dictated by rockfall management, and reconciliation a vital aspect to ensure
sufficient catch capacity is maintained. Figure 1 shows the definition of crest loss and toe gain (or toe
flare), which impacts on the surface area of the catch berm.

Figure 1 Schematic cross-section to define crest loss and toe flare

2. Qualitative reconciliation
Qualitative reconciliation is quick and easy to evaluate in GEM4D (www.basrock.net). Load two
meshes and colour the as-built mesh with “Top toolbar => Yellow colour palette icon => Colour on
distance from mesh”, with the results shown in Figure 2A. Wall sections can also be superimposed
to compare the outcomes qualitatively as shown in Figure 2B.
2A Underbreak in blue and overbreak in red 2B Superimposed sections

Figure 2 Distance comparison between design and actual meshes

Much can be learnt from the visual variability techniques, but quantifying the deviations provides
further benefits.

3. Quantitative reconciliation
The basic concept is to calculate a statistical distribution of the crest loss, toe gain, and achieved
catch berm widths. This apparently simple task requires a number of manual steps and highly time-
consuming in mine design software. A basic outline is discussed under “Traditional method” below,
as the automated method will be easily understood afterwards.

3.1 Traditional method


The traditional method can be described in the four steps discussed below.

Step 1 – Select individual straight domains along a wall


The mesh has to be sub-divided into straight wall domains to enable the orientation of
perpendicular sections.

Step 2 – Create perpendicular sections for each straight domain at a set interval
Sections are created at set intervals for every straight domain. A typical interval selection is 5m, as a
representative sample can be obtained and large areas covered without too many sections.
Step 3 – Mouse pick four points on every section
Mouse pick four points on each section in the exact same order; for example design toe, actual toe,
actual crest and design crest.

Step 4 – Manually calculate and graph the parameters of interest


From the selection point coordinates, all required distances can be calculated, and the results either
graphed or spatially displayed.

3.2 Automated method


The above method was reconsidered, and a simple solution found that automates the reconciliation
process and still provides sufficiently accurate results. The automated solution was coded into
GEM4D, as we have the luxury of full access to the source code with no reliance on third-party
vendors.

The automated process can be done on a selected area, or a whole pit can be done simultaneously
with little additional effort. The principle of the automated method is summarised in Figure 3. The
actual and survey lines are subdivided into points; the design lines points are selected very close
together, and the survey line points at the interval of interest, 5m for this example. The shortest
distance to the design line points is then calculated for every survey point, and the value stored at
the survey point location. The shortest distance will automatically be near perpendicular to the two
lines, and the error can be minimised by selecting very short intervals for the design lines.
Figure 3 Principle of the automated reconciliation method

The automated method takes a few steps, but each step is quick to perform, and the whole process
can be completed in a few minutes.

Step 1 – Obtain the design and survey strings


Obtain the design and survey strings for an area (or even the whole pit) and clean up the survey
strings at the locations of interest.

Step 2 – Subdivide the design and survey lines


Sub-divide the design line into tiny segments, say 5cm. Sub-divide the survey lines into the interval
distance of interest, say 5m. This is done by selecting the “Split lines into fixed length segments” as
shown below.

Figure 4 Strings before and after sub-division

Step 3 – Write the survey points out as a CSV-file and load as Marker-data
Hide the design string and write the survey points out as a CSV-file with “Ribbon => Mesh => Export
files => Mesh info as CSV => Poly, Line and Point vertices”.
Hide or delete the survey string object, and load the CSV-file as Marker-data with “Ribbon =>
Marker => Load files => Text (CSV)”

Step 4 – Calculate the shortest distances


Select “Ribbon => Marker => Marker actions => Distance => Add grid distance columns”, which
calculates the shortest distance between each marker point and the design points and adds three
columns to the Markers grid:
1. Obj1_DistXYZ – 3D distance between the two points.
2. Obj1_DistXY – 2D distance between the two points. This is the plan view distance and of
interest for our discussion.
3. Obj1_DistZ – Z distance or elevation difference. This can be used to assess the bench
elevation compliance to design.

3.2.1 Post Processing of Data


The histogram chart and statistics of each selection is automatically updated with the filtering within
GEM4D, and the spatial colour coded spheres could be generated as shown in Figure 5. The data can
also be exported as a CSV-file to be analysed in greater detail.

Figure 5 Result from the GEM4D interface

Data can be manually filtered within GEM4D for a more detailed assessment. Examples currently
employed at NBG include lithology, design angle, shot number and wall domain.