ELEVATING WORK PLATFORM
PRE-START CHECKLIST
Plant type: Boom Lift Plant / Serial No.:
Project: North South Corridor No.: N111 Week Ending - Sunday:
Note: (√) Item OK; (X) Item Requires Attention; (NA) Item Not Applicable Hours at Start of week: Hours at End of week:
ITEMS TO BE CHECKED - DAILY MON TUE WED THU FRI SAT SUN
Engine oil level
Hydraulics
Check Fuel level
Check tyres & wheels
Check brakes
Pivots Basket
Check park brake
Connecting Rods
Check pivots – bolt tightness
Hydraulics Check connecting rods
s Pivot knuckle
Exhaust bolt tightness Check exhaust
s Check levers /controls
Engine guarding Check slew pin security and condition/slew bolt
Levers / controls Check engine guarding
s Tyres
Wheels HYDRAULICS MON TUE WED THU FRI SAT SUN
Brakes Check rams
Slew pin security
and condition Park brake Check hoses
Check excessive wear, leaks and creep
Defects are to be report to and cleared by the Supervisor / Foreman.
IMPORTANT NOTE: If defect is a safety hazard or requires Immediate repair, shut down machine, attach WARNING DEVICES MON TUE WED THU FRI SAT SUN
an Out of Service tag, advice Supervisor and do not use until supervisor sign / dates cleared by & date. Check horn
Comments: Check amber flashing beacon
Check motion alarms
Check raise & lower alarms
MACHINE LAST SERVICED at hours on (date)
Operator to fill in Below & mark applicable boxes for each day used BASKET MON TUE WED THU FRI SAT SUN
Checked by: Print name Signature Check operator restraint
MON Check instruments & labelling
TUE Check levers / controls
WED Check pedals
THU Check deadman switch operating instruction
FRI Check SWL /Crane Chart
SAT Check safety Harness & Lanyard
SUN Check warning signs in cabin
Distribution – Return completed forms to the Plant Manager at end of every week
Page 1 of 1