CITI CORP Project Management Group
CHECKLIST FOR HAMMERING DRILL MACHINE
Project Name: CI1 CoPP Equipment No.:
UAFDmlo
Contractor Name: Onifd Actes Inspection Date:
280202
Equipment Spocs.: mll macbine Next Inspection Date:
SL NO DESCRIPTION YES NO REMARKSS
Equipment double insulated. (written in the
1
machine body) e
Equipment free from any defect like broken handle,
2
broken parts etc
- te
3 Electrical cable free from defects. e
industrial plug top available and in working
Te
condition.
5 Drilling Bit without any damage. Pe
Drilling bit holder is availabe and in working
condition
Switch in working condition
Name Signature Date
Checked by Contractor Safety Officer Maruti WaJe
Name Signature Date
Checked by Client Electrician
Reviewed Accepted... Rejected.
Name Signature Date
Checked by Client
Page 1 of 1
CITI CORP Project Management Group
CHECKLIST FOR HAMMERING DRILL MACHINE
Project Name: Equipment No.:
Contractor Name:
eii Corp_ Inspection Date:
nitou Aceg
Equipment Specs.: a l l Olc Next Inspection Date:
la8log|2iA
SL NO DESCRIPTION YES NO REMARKs
Equipment double insulated. (written in the
machine body)
Equipment free from any defect like broken handle,
2
broken parts etc
3 Electrical cable free from defects.
industrial plug top available and in working
condition.
5 Drilling Bit without any damage.
Drilling bit holder is availabe and in working
6
condition
Switch in working condition
Name Signature Date
Checked by Contractor Safety Officer
Name Signature Date
Checked by Client Electrician
Reviewed
Accepted.. Rejected.
Name Signature Date
Checked by Client
Page 1 of 1