CONCRETE BUCKET
INSPECTION DRAFT
This Draft Complies the Requirements of
Lifting Operation and Lifting Equipment Regulation (Loler) 1998
FRM-GSC-60 REV.02 01/10/2019
Date Of Inspection: Job order No.: Draft No.: GSC/INS/
Client Name:
Requested By: Contact No.:
Email Address: Location:
Inspection Type: Initial In-Service Major
Description:
CONCRETE BUCKET DETAILS MAN RIDING PLATFORM DETAILS
Manufacturer :
Model : Length :
Width :
Serial Number :
Height :
Year Manufactured : Plant ID Number :
Capacity :
SAFE WORKING LOAD PROOF LOAD
Date Of Last Examination: Date Of Next Examination:
Date of Last Proof load: Date of Next Proof Load:
A. Within A 6 Month Interval
B. Within A 12 Months Interval
THE EXAMINATION WAS CARRIED OUT
C. In Accordance Of Examination Scheme
D. After Occurrence Of Exceptional Circumstances
Test Procedure Number: GSC-TEP-33
Concrete Bucket Status:
SEE OVERLEAF FOR COMMENTS / RECOMMENDATIONS
INSPECTED BY:
Inspection Engineer
INSPECTION CHECKLIST FOR CONCRETE BUCKET
A: In Good Order B: Requires Attention C: Urgent Action D: Not Applicable E: None
ITEMS TO CHECK A B C D E REMARKS / COMMENTS
Previous Inspection Certificate
Manufacturers Certificate
Name Plate
Toe Boards
Weldments
Funnel
Chute
Flooring / Platform
Guardrails
Hooking System
Pad Eyes / Lifting Points
Access Gates
Head Room
Safety Lock
NOTE: Items with discrepancy found must be rectified. Items at column “C” signify MAJOR DEFECTS and require IMMEDIATE action.
GENERAL CONDITION:
EQUIPMENT UTILIZED FOR TEST: