100% found this document useful (1 vote)
1K views1 page

Piling Rig Inspection Checklist

The document is a Bored Pile Safety Checklist used for inspecting various components of the equipment, including the winch, mast, emergency stop, controller, and other parts. It outlines inspection methods and requires daily or monthly checks, with spaces for recording findings and signatures from the operator and supervisor. Each item includes specific conditions that must be met to ensure safety during operation.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Piling Rig Inspection Checklist

The document is a Bored Pile Safety Checklist used for inspecting various components of the equipment, including the winch, mast, emergency stop, controller, and other parts. It outlines inspection methods and requires daily or monthly checks, with spaces for recording findings and signatures from the operator and supervisor. Each item includes specific conditions that must be met to ensure safety during operation.

Uploaded by

abubakrelsaid90
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

□ Pre □ Delivery

Bored Pile Safety Checklist □ Daily □ Monthly


Project Site: Subcontractor: Registration No: Date:

① ①







⑦ ⑥
② ⑨ ③④

⑧ ⑩ ⑧ ⑧

No. Part Item Inspection method Sun MonTue Wen Thu Fri Inspection photo

Over-winding
Winch movement shall stop before driver
① prevention or Kelly bar reaches the top.
device

Mast (leader) Operation shall stop if mast reaches the


② inclinometer limited inclination range Over-winding
Mast clinometer
prevention
Emergency Power removed by pressing the button,
③ stop & safety and movement stopped by pulling the
lever lever.

Controller & Operation of controller, monitor, and brake


④ brake shall work normally. Emergency stop Controller & brake

No damage or deformation on mast and


Mast (leader) &
⑤ Kelly-bar Kelly-bar, and fixed status of connecting
parts (bolts) shall be in good condition.

Buffer spring of the rotating drive and


Guide &
⑥ rotating drive guide shall be fastened tightly and
working normally. Kelly-bar Rotating drive

Back stay No damage or deformation of back stay,


⑦ (cylinder) support and cylinder shall work normally.

No damage or deformation on track or


Track & Steel
⑧ plate steel plate shall be used for ensuring the
foundation condition. Back stay Track
cylinder
Rotation of drum and sheave shall be
Drum, sheave
⑨ & wire rope good, and no damage on wire and
winding machine.

No crack on fixed part or bracket for


Oscillator
⑩ (option) sliding, and both left/right oscillating
cylinder shall operate normally. Drum/wire rope Oscillator

Remarks
Operator Sign Supervisor Sign

You might also like