MIP PKG-17 RAS TANURA AREA PIPELINE
CONCRETE FOUNDATIONS COATING ACTIVITY RFI LOG
Foundation Details
Suraface
No of Preparation & Suraface Preparation & Final Coat Final Coat
SL Description Type Number foundatio moisture test moisture test Inspection(RFI Inspection
No
ns inspection(RFI inspection(DATE) NO) (DATE)
NO )
NA SL-131 1 2886 12/13/2022 2929 14-Dec-22
NA SL-132 1 2886 12/13/2022 2929 14-Dec-22
TNJ-1,30"MLV-2 PRECAST
1 FOUNDATION @ KM 124.9
NA SL-133 1 2886 12/13/2022 2929 14-Dec-22
NA SL-134 1 2886 12/13/2022 2929 14-Dec-22
FOOTING VS -131 F1 1 2928 14-Dec-22
2 platform 104 s-131 2 Surface preparation & moiture test done by another QC 2928 14-Dec-22
platform 104 s-133 1 2928 14-Dec-22
TNJ-1,30"MLV-2 @KM
124.9 platform 104 s-134 1 2928 14-Dec-22
platform 105 s-135 1 2928 14-Dec-22
3
platform 105 s-132 2 2928 14-Dec-22
platform 105 s-136 1 2928 14-Dec-22
Total 11
MIP PKG-17 RAS TANURA AREA PIPELINE
CONCRETE FOUNDATIONS COATING ACTIVITY RFI LOG
Foundation Details
Suraface
No of Preparation & Suraface Preparation & Final Coat Final Coat
SL Description Type Number foundatio moisture test moisture test Inspection(RFI Inspection
No
ns inspection(RFI inspection(DATE) NO) (DATE)
NO )
PLATE 201 F1 7 2950 12/18/2022 3024 24-Dec-22
PLATE 201 F2 5 2950 12/18/2022 3024 24-Dec-22
TNJ-1,30"MLV-2 PRECAST
1 FOUNDATION @ KM 0 PLATE 203 F8 1 2950 12/18/2022 3024 24-Dec-22
NA S-209 1 2950 12/18/2022 3024 24-Dec-22
NA S-207 1 2950 12/18/2022 3024 24-Dec-22
Total 15
MIP PKG-17 RAS TANURA AREA PIPELINE
CONCRETE FOUNDATIONS COATING ACTIVITY RFI LOG
Foundation Details
Suraface
No of Preparation & Suraface Preparation & Final Coat Final Coat
SL Description Type Number foundatio moisture test moisture test Inspection(RFI Inspection
No
ns inspection(RFI inspection(DATE) NO) (DATE)
NO )
TNJ-1,30"MLV-1 PRECAST
FOUNDATION @ KM
1 67+900 LIFTING HOOK & NA VS-121 1 3058 12/27/2022 3137 3-Jan-23
FOUNDATION
Total 1
MIP PKG-17 RAS TANURA AREA PIPELINE
CONCRETE FOUNDATIONS COATING ACTIVITY RFI LOG
Foundation Details
Suraface
No of Preparation & Suraface Preparation & Final Coat Final Coat
SL Description Type Number foundatio moisture test moisture test Inspection(RFI Inspection
No
ns inspection(RFI inspection(DATE) NO) (DATE)
NO )
1 S-283 to S-314 32 3120 1/1/2023
TNRTNG-1,12 INCH
1 SCARPER RECEIVER
1 S-318 to S-360 43 3120 1/1/2023
Total 75
MIP PKG-17 RAS TANURA AREA PIPELINE
CONCRETE FOUNDATIONS COATING ACTIVITY RFI LOG
Foundation Details
Suraface
No of Preparation & Suraface Preparation & Final Coat Final Coat
SL Description Type Number foundatio moisture test moisture test Inspection(RFI Inspection
No
ns inspection(RFI inspection(DATE) NO) (DATE)
NO )
NA S-241 1 3263 1/19/2023 3295 24-Jan-23
NA S-242 1 3263 1/19/2023 3295 24-Jan-23
TNRTNG-1,12"MLV-3
1 PRECAST FOUNDATION @
KM 178
NA S-243 1 3263 1/19/2023 3295 24-Jan-23
NA S-244 1 3263 1/19/2023 3295 24-Jan-23
NA SL-151 1 3264 1/28/2023
NA SL-152 1 3264 1/28/2023
TNJ-1,30"MLV-3 @KM 178
2
NA SL-153 1 3264 1/28/2023
NA SL-154 1 3264 1/28/2023
Total 8
REMARKS " RFI CLOED ERALY AND INPECTION DONE 28-01-2023