Quality Checklist For Site Works: 17 Wet-Area Waterproofing Task

The document provides a quality checklist for wet-area waterproofing tasks on the 1st and 2nd floors. It includes 46 questions to check if proper surface preparation, materials, application procedures and testing were followed for waterproofing tasks like plastering, coating, brick laying and screeding.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
296 views1 page

Quality Checklist For Site Works: 17 Wet-Area Waterproofing Task

The document provides a quality checklist for wet-area waterproofing tasks on the 1st and 2nd floors. It includes 46 questions to check if proper surface preparation, materials, application procedures and testing were followed for waterproofing tasks like plastering, coating, brick laying and screeding.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

#UNKNOWN!

QUALITY CHECKLIST FOR SITE WORKS

17 WET-AREA WATERPROOFING TASK


1ST & 2ND FLOOR

ARCHITECTURAL STRUCTURAL INTERIOR SERVICES & UTILITY

EXTRIOR

Building Unit Designation Name: Project ID:


Name of the Contractor Group: Location:
Construction Drawing Ref. No.: Quantity:

CL : 17-A
YES NO NA
Sl.No. Description
x Is format CL:16-A for Final Plaster works complied with?
1 Whether approved / specified materials used as per specification?
2 Check for surface preparation. Is it o.k.?
3 Check for Plastering before coating. Is it o.k.?
4 Check for coating of chemical. Is it o.k.?
5 Check for Plastering after coating. Is it o.k.?
6 Check for fixing of nozzles and spacing. Is it o.k.?
7 Check for grouting. Is it o.k.?
8 Check for brick layer thickness & slopes.
9 Check for curing. Is it o.k.?
10 Prior To Waterproofing
11 All the Structural & Non structural work complete as per the Latest approved GFC drawing ?
12 Parapet wall construction Complete ?
13 Provision of all the location of Downtakes & Rain water Outlets are identified
14 All the Rain water Out lets are provided & Kept as per the drawing ?
15 Check for Defects ?
16 Is there any Honey combed concrete on slab or in the column or in any structural & Non structural member
17 Is there any visible Cracks on the floor ?
18 Is the repairing is done as per the approved process of Honey comb repairing ?
19 Is the cracks are filled up as per the process
20 Pre – Application Testing ?
21 Surface is made clean & clear ?
22 Is the laitance has removed
23 Brooming if done ?
24 Is surface made clean & free from all dust, Dirt & Nails ?
25 Plug all the outlets
26 Water ponding done for initial 24 hrs ?
27 Is there any marks observed for Leakages, Dampness, Cracks on the ceiling below ?
28 Is there any seepage observed on the wall of floor below ?
29 If yes, repairing is done ?
30 Re-tested for the effectiveness of the repair ?
31 All area below the terrace floor is Dry after re ponding ?
32 Application of Water Proofing chemical ?
33 Is the chemical approved for the terrace water proofing ?
34 Is the surface free from all excess water & foreign material ?
35 Is priming of surface required ?
36 Proportion of mixing with proposed material is done as per the manufacturer specification or as per the approved process ?
37 Date of Application of First coat ?
38 Minimum & maximum Interval for application of second coat ?
39 Curing by ponding ?
40 Conduct Water tightness testing by 72 Hrs. of ponding done ?
41 Is the Ceiling of floor below is dry, No wet patch, seepage etc ?
Placing of pre wet Brick bats on the 25mm thk. Bedding Mortar(C.M=1:4) mixed with Integral waterproofing compound or
42
as per the approved proportion in Slope not flatter than 1:100 ?
43 Mixing and placing of mortar mixed with approved integral water proofing compound
as per the specification of Manufacturer for the joints (Min.Joint thk. 15mm) ?
44 Screed over Brick bat coba with C.M 1:4 or approved mortar proportion mixed with Integral Waterproofing compound
as specified by manufacturer ?
45 Curing of top Screed over Brick bat coba by ponding ?
46 Water tightness testing of Brick bat by water pooling for 72 Hrs and check if there is any leakage
observed in ceiling of floor below ?

CORRECTIVE ACTION PROPOSED- Item wise.


If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)
Comments:

Contractor's Rep.: Client Rep.: Lines & Visions Int. Rep.: