0% found this document useful (0 votes)
45 views1 page

PDF 4

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

PDF 4

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8-16MMØ VERT.

BARS W/ 10MMØ HOLDING TIES


SEE CONSTRUCTION NOTES FOR CHB
SP.@ 3-0.05M.,4-0.10M.REST 0.20M.O.C.
REINFORCEMENT ( TYPICAL )

TYP.0.175M.X 0.40M.
8-16MMØ BASEBARS R.C. COLUMN
BOTHWAYS SP.@ 0.175M. O.C TYP.5"THK. CHB.

10MMØ BOTTOM FIN.FLR.LN.

VARIES
FTB
BARS SP.@ 0.30M.

A B C

MIN.0.60M.
FTB FTB
4.00M. 3.00M.

0.25M.
FTB FTB

0.30M.
1.30M. STONE
8-16MMØ BASEBARS
BOTHWAYS SP.@ 0.175M. O.C 3-10MMØ CONTINOUS BARS

FTB
0.45M.
FTB STRAP FTG. BEAM
4

WF-1 PLAN WF-1 SECTION

1.30M. 2.20M.
BOULDERS
F1/C1 CENTER INTERIOR A TYP.WALL FOOTING DETAILS
F1/C1 F1/C1 SECTION
3.50M.

F1/C1 F2/C1 ST 1 SCALE 1 : 50METERS

10MMØ VERTICAL AND HORIZONTAL

WF-1
8-16MMØ VERT.BARS W/ 10MMØ HOLDING TIES
BARS SP.@ 0.60M. O.C.
FTB

FTB

FTB
WF-1 SP.@ 3-0.05M.,4-0.10M.REST 0.20M.O.C. 10MMØ TEMPERATURE BARS SPACED
AT 0.490M. ON CENTER RESPECTIVELY
TYP.0.175M.X 0.40M.
F1/C1

1HRS.FIRE RESISTANCE
F1/C1 F2/C1 8-16MMØ BASEBARS R.C. COLUMN
BOTHWAYS SP.@ 0.175M. O.C
STRAP FTG. BEAM
3

FTB

FTB
FTB FTB
2.00M.

TYP.5"THK. CHB.
ALONG PERIMETER
F1/C1 F1/C1
FTB

FTB

FTB

FIRE WALL FTB

FTB

FTB
STRAP FTG. BEAM FTB
2

0.40M..
FTB FTB

F1/C1 FTB
3.50M.

F1/C1 F2/C1 8-16MMØ BASEBARS


BOTHWAYS SP.@ 0.175M. O.C

FTB
FTB

FTB

FTB

STONE
F1/C1 F1/C1
0.175M.
A TYP.GRND.REINF.BARS
BOULDERS
ST 1 SCALE 1 : 50METERS
FTB STRAP FTG. BEAM
F1/C1 CENTER ALONG PERIMETER F1/C1 SECTION TYP. FTB CONNECTION
1

8-16MMØ VERT.BARS W/ 10MMØ HOLDING TIES


F1/C1 F2/C1 SP.@ 3-0.05M.,4-0.10M.REST 0.20M.O.C.
F1/C1
TYP.0.175M.X 0.40M. TYP.0.175M.X 0.40M.
8-16MMØ BASEBARS R.C. COLUMN R.C. COLUMN
BOTHWAYS SP.@ 0.175M. O.C
0.30m.
4.00M. 3.00M. 10-16MMØ REBARS
FTB

FTB FTB

0.40m.
A FOUNDATION PLAN
ST 1 SCALE 1 :50METERS
FTB 8-16MMØ BASEBARS FIRE WALL
BOTHWAYS SP.@ 0.175M. O.C

F1/C1 CORNER TYP.STRAP FOOTING BEAM 0.30m. x 0.40m. STONE

A TYP.FOOTING PLAN
1 SCALE 1 : 50METERS
BOULDERS X'X' BOULDERS SECTION X'X'
ST
F1/C1 SECTION(interior) F2/C1 SECTION(exterior) TYP.STRAP FTG. BEAM
LOGO: PREPARED FROM THE OFFICE OF: R.A.9266, Art.IV, Sect. 33 PROJECT NAME: APPROVED BY: DRAWN BY: REVISIONS: SHEET CONTENTS: DRAWING NO.

CHECKED BY:
AR
PETER C. LAMSEN TWO STOREY RESIDENTIAL DATE DRAWN:
CIVIL ENGINEER BUILDING *ESPERANZA T. ROSARIO* *AS SHOWN* 4 10
PRC. NO.: 26480 ISSD. ON : 01-03-2023 DATE PRINTED:
SHEET NO.:
PTR. NO.: 6761538 ISSD. AT : SCCP
TIN. 167-951-578 DATE:
LOCATION : BRGY.MANZON,BLK 1 LOT 4 MELMAC SUBDIVISION
SAN CARLOS CITY , PANGASIUNAN 2420
OWNER DATE APPROVED: 4

You might also like