0 ratings0% found this document useful (0 votes) 1K views2 pagesFence Permit Form
Fencing Permit Form of General Santos City
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, 
claim it here.
Available Formats
Download as PDF or read online on Scribd
TRACKING NO
Republic ofthe Philippines
       
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PROVINCE OF SOUTH COTABATO
CITY OF GENERAL SANTOS Bee
OFFICE OF THE CITY BUILDING OFFICIAL a
FENCING PERMIT Se
APPLICATION NO. FPO. BUILDING PERMIT NO.
[BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE OWNERIAPPLICANT)
OWNERAPPLICANT LAST NAME FIRSTNAME wi. [TN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP USE OR GHARAGTER OF OCCUPANCY
BY AN ENTERPRISE
‘ADDRESS. NO. ‘STREET BARANGAY CHVIMURICIPALITY ZIP CODE] TELEPHONE NO.
TOGATION OF CONSTRUCTION: TOTO. BLKNO. TCT NO. TAXDEC NO,
STREET BARANGAY CITYIMUNICIPALTY
‘SCOPE OF WORK
NEW CONSTRUCTION REPAIR OTHERS (specify)
ERECTION DEMOLITION
ADDITION.
‘BOX? BOX
‘DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WOKRS
CIVIL ENGINEER Si ENGINEER
(Sioned And Sealed Over Printed Name) (Signed And Sealed Over Printed Name)
Date Date
Toss arose
PRETO, rakaiy PRC No- ality
PIRNe Date Issued PTRTo. Date Issued
Tug at Ti Baved at Tir
‘BOX 4 (TO BE ACCOMPLESHED BY THE APPLICANT)
‘BUILDING OWNER WITH MY CONSENT LOT OWNER
(Signature Over Printed Name) (Signature Over Printed Name)
Date Date
Aes favors
Tisense No Date sued Place Issued Tisense No Dae sued Place sued
BOXS
REPUBLIG OF THE PHILPPINES vss
CITYIMUNICIPALITY OF
BEFORE ME, At the City/Municipalty of on porsonally appeared
the folowing
FERICANT TEBE Dato baned Place Issued
LICENSED ARCHITECT OR CIVIL ENGINEER. Dale Beued Place Issued
(Full-Time Inspector and Supervisor of Fencing
‘whose signatures appear herein above, known to me to be the same persons who executed this standard prescribed form
‘and acknowledged 1o me thatthe seme is ther free and voluntary act and deed
WITHESS MY HANID AND SEAL on the dato and placo abave written
Peete "NOTARY PUBLIC (Until December)OX 6 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)
 
MEASUREMENTS: LENGTH IN METERS:
 
‘TYPE OF FENCING: INDIGENOUS MATERIALS
RG. Ronnorved Concrete)
RG. (and CONG, HOLLOW
RC. And Bricks
 
 
 
 
 
 
 
 
 
HEIGHT mL METERS:
RCSTEEL MATTING
RC. BARBED WRE
[5 omens csrects
 
[Je ang inrerunwcycLone
 
‘BOX (TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PROGRESS FLOW
mn our
PROCESSED BY:
DATE TIME DATE Tne
LINE ANID GRADE (GEODETIC)
‘CIILISTRUCTURE
ELECTRICAL,
OTHERS (Spec)
‘ASSESSED FEES
‘AMOUNT DUE ORNUMBER DATE PAID PROCESSED BY
LINE AND GRADE (GEODETIC)
FENCING
ELECTRICAL Han)
OTHERS (Specify)
 
 
 
‘BOX 8 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL)
 
[ACTION TAKEN
PERMIT IS HEREB ISSUEDIGRANTED SUBJECT TO THE FOLLOW
1. That under Article 1723 of the Civil Code ofthe Philippines,
the ground. The engineer or archatect who supervises the con:
to defect inthe constuction or the use of inesor materials,
2 Thal the proposed construtionforetion/addition, ote. Shall bo
its implementing Rules and Regulation.
licensed Geodetic Engineer.
>. That before commencing the excavation tne person maki
©. Thal the oumer ofthe fence shall engage the services:
Inspections and supervision of the construction work
4. That mero shal ba kopt a tho jobsto ata mos a logbook
PERMIT ISSUED BY:
(signatu
Date
 
ING CONDITIONS:
the engineer or architect who drew up the plans and specification is lable for
damages # witin fteen (15) years rom the competion of the structure, i should colapse die to defect in the plans or speeifeaions or defects in
'stuton shall be soldanty liable withthe contractor should the edifice collapse due
in conformity with the provisions of tho "National Bulding Cod" (P-D. 1096) and
4 That prior to commencement oF the proposed projects and construction an actual relocation Survey shall be conducted by responsible
ing or causing the excavation to be made verity in wring the ower of adjoning
bulging not less than ten (10) years before such excavation isto made
Cf responsible licensed Architect or Civil Engenner to undertake the ful time
%k Whore the actual progress of constuction Including test conductad, woather
concen and other pertinent data are tobe recorded, same shall bemade available for serutny and comments by the OBO representative
‘uring the conduct of hisher inspection pursuant to Section 207 ofthe National
CITY BUILDING OFFICIAL,
re Over Painted Mame)