The document provides a cost estimate for the construction of a proposed 3-storey residence in Manila, Philippines. It includes itemized estimates for labor and materials for various project components such as earthworks, formworks, rebarworks, concreting works, structural steel, finishes, doors and windows, plumbing, electrical works, and more. The total project cost is not provided due to calculation errors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views7 pages

Ssssssssssssssssss

The document provides a cost estimate for the construction of a proposed 3-storey residence in Manila, Philippines. It includes itemized estimates for labor and materials for various project components such as earthworks, formworks, rebarworks, concreting works, structural steel, finishes, doors and windows, plumbing, electrical works, and more. The total project cost is not provided due to calculation errors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Project PROPOSED 3 - STOREY RESIDENCE

Location MANILA CITY, PHILIPPINES


Owner MS. KAREN DELOS SANTOS
Subject PROJECT CONSTRUCTION COST ( Labor and Materials )
QTY UNIT LABOR LABOR MATERIAL MATERIAL COST OF LABOR
Item SCOPE OF WORKS UNIT COST COST UNIT COST COST & MATERIAL
A General Requirements
Mobilization/Demobilization
Permits (Const. Permit),
Disposal of construction debris / material hauling
SUBTOTAL A - -
B Earthworks
Excavation Works
Column footings
Footing tie beams
Wall footings
Slab on grade + backfill
Septic vault
SUBTOTAL B - -
C Formworks
form plywood 12mm thk (ordinary)
coco lumber 50mm x 50mm x 3m
coco lumber 50mm x 75mm x 3m
coco lumber 50mm x 100mm x 3m
common wire nail 25mm
common wire nail 50mm
common wire nail 75mm
common wire nail 100mm
Column
Suspended slab
Beams
SUBTOTAL C - - -
D Rebarworks

10mm dia. deformed bars


12mm dia. deformed bars
16mm dia. deformed bars
Column Footings
Footing tie beams
Wall Footings
Slab on Grade
Column
Beams + Roof Beams + Stair
Suspended Slab
SUBTOTAL D - - -
E Concreting Works
3/4" crushed gravel
G1 gravel
S1 sand
portland cement
thoro seal/sealoproof/sahara waterproofing
Footing Tie Beams
Column Footings
Wall Footings
Slab on grade
Columns
Beams + Roof Beams
Suspended Slabs
SUBTOTAL E - - -
F Structural Steel (glass canopy)
Structural Steel columns
Structural Steel beams
Welding rods
Epoxy paint primer
SUBTOTAL F - - -
G Steel Framings (trusses)
50 X 50mm X 3.2mm thk angle bar
C-purlins 100mm x 50mm x 1.2mm thk
20mm dia. X 6000mm plain bar
Welding rods
Epoxy paint primer
WATERPROOFING, & MOISTURE PROTECTION
elastomeric paint
thoro seal/sealoproof/sahara waterproofing
6mm thk aluminum insulation
Roofing sheets + accessories + decking
long span pre painted roof guage 24
end wall flashingsguage 24
plain g.i. sheets pre painted guage 24
silicon sealant - clear
stainless gutter guage 24
rivets
SUBTOTAL G - - -
H Finishes
FLOOR FINISHES
Granite tiles-plain 400mm x 400mm 55 pcs
Ceramic Tile 600mm x 600mm 125 pcs
Paving Stones
Pebbles black (assorted size)
Cement Mortars
Washed/white sand
Stone Panel Flooring (Thermal)
Bedroom 01
Bedroom 02
Living area
Kitchen
Dining Area
Service Area
Stairs
Family Area
T&B 01
T&B 02
T&B 03
Storage
Hallway
Parking
SUBTOTAL H - - -
I Wall Finishes
Portland Cement
Masonry Mortar
Cement Board
washed/white sand
CHB 100mm thk
CHB 150mm thk
10mm dia. deformed bars
Interior walls + Exterior walls
-Plain cement + block Laying
SUBTOTAL I - - -
J Ceiling Finishes
Ground Floor / Second Floor
Suspended Gypsum Plasterboard
Portland Cement Plaster Soffits
skim coat applied finish/gypsum boards/pvc
SUBTOTAL j #REF! #REF! #REF!
K Doors & jambs
wood panel door for bedrooms
PVC louvered flush door for T&B
metal framed and full glass for service area
Panel Doors for main door /bedroom mdf
SUBTOTAL K - - -
L Windows
fiberglass framed window
top-hung window for toilet and bath
POWDER COATED frame with tempered glass
SUBTOTAL L -
M Finishing Hardwares
Locksets
Door Hinges
SUBTOTAL OF M - - -
N Carpentry Works
Storage open shelves
Closets
Counters
SUBTOTAL M - - -
O Metal Works
Stairs (railings…)
SUBTOTAL O - - -
P Miscellaneous Hardwares
Drawer guides
Pvc edging for shelves/screws/bolts
Cabinet handles
SUBTOTAL P - - -
Q Painting Works
Interior walls + Exterior walls (concrete)
Semi-Gloss Latex
c.Ceiling -flat latex finish/acretex
d.Painting of carpentry works (closets. Cabinets, shelves…)
SUBTOTAL Q - - -
R Plumbing Works
Plumbing Fixtures
Watercloset
Septic Tank
Kitchen Sink
Lavatory
Other plumbing system/accessories
SUBTOTAL R - - -
S ROUGHING -IN(cold water system)-pipes
ROUGHING -IN(sewer system)-pipes
ROUGHING -IN(vent system)-pipes
ROUGHING -IN(storm drain system)-pipes
Installation of Plumbing Fixtures
SUBTOTAL S - - -
T Electrical Works
Main Feeder Line
Panelboards/feederlines
Roughing-in works power system +Lighting
Wiring works
Lighting fixtures+switches
Convenience outlets
SUBTOTAL T - - -
PROJECT COST (Labor & Materials) #REF!
GATE /FENCE
Grand Total Project Cost #REF!
Prepared by:
Karen T. Delos Santos

Architect

Submitted To:
Marilyn G. Bactad
Project Manager

Manager