Insp. Ref.
#: _____________
VENKATA PRANEETH DEVELOPERS PVT LTD.
Inspection Checklist - Plumbing & Sanitary Works
Site Name :
Main Contractor (MC) : Contractor Supervisor :
Site Engineer : Site Supervisor :
Villa No. :
Pipes & fittings: Type & sizes = spec/approved sample? Y ( ) N ( )
Inspection criteria Pre & During Installation Post-Installation
Routing of Cold & Hot Water
SE & QC Accepted Works
Positioning of pipe routing
SE & QC Re-Verification
Setting Out & Alignment
Pipe Sleeves Location
Bearers & Platform for
Pressure Test, Smoke
SE & QC Verification
Routing of PVC Pipe
SE & QC Approval to
Joints, Connection,
Functionality Test
Water Tank
proceed works
MC Rectification
MC Rectification
Fittings / Wares
Pipe
Protection
SE Verification
Location Remarks
Test
Pipe jointings
Level pegs
Brackets
Gradient
INTERNAL
EXTERNAL
1 Toilet -1
2 Toilet -2
3 Toilet -3
4 Kitchen
5 Wash area
Checked/Verified by: MC SE MC SE/QC SE/QC MC SE/QC MC SE/QC
Signature
&
Date
Plumbing Quality = Nos. of location accepted by SE & QC after Re-Verification @ Post-Inst. / Total locations x 100% =
Notes:
(1) Change the location in this checklist according to the product layout. For high-rise project, to attach a copy of the layout.
(2) See below for acceptance tolerance. MC to mark 'a' in respective location only if workmanship is acceptable (NA if not applicable), \
Inspection criteria Acceptance tolerance Tools used
Setting out & alignment Marking of plumbing & sanitary routing, soil pipe & sleeve location, & etc = layout. Routing to be horizontally or vertically aligned. visual
Avoid running along joint between structural element & brickwall
Pre & During Installation
Positioning of riser, …. Positioning of riser, water meter, manhole, gully, dropper, stop cock outlet, fitting = layout / Praneeth / Consultant visual +
M. tape
Joints of piping Approved pipe fittings & adhesive used. 100mm dia. underground pipe for kitchen sink waste pipe. No burning of pipes allowed visual
Manholes & gully Constructed = see below diagram / Consultant drawing / as suggested by resident engineer visual
1
Routing of cold water As per Shop Drawing. Vertically & horizontally aligned. Avoid running along joint between structural element & brickwall visual
pipe
Joints, connection & Correct adhesive used. Joints are properly sealed. Cement patching to hold pipes and elbow to brickwall. All outlets protected / visual
protection properly capped. No damages detected visually.
Gradient Gradient for inclined pipes: 80mm–1:40; 100mm-1:60; 150mm–1:100 visual +
M. tape
Brackets Secured with brackets at interval: 80mm - 1.5m; 100mm - 1.8m; 150mm - 2m or as recommended by manufacturer visual +
M. tape
Post Installation
Water tank Location, type & capacity = drawing/spec. Water tight. Clean visual
CPVC Pipe Pressure test Using with Hydrilic pressure Machine, Testing pressure - 6 kg /cm2 hold 6 hours. visual +
procedure pressure
gauge
PVC Pipe Pressure test Using with Hand Blower & Smoke, hold 1 hour. visual
procedure
Pressure test & Test twice for all pipe lines: 1) before tiling, 2) after connecting to water tank with water supply.Pipe line to be pressurize with visual +
Functionality Test water. Flushing to all sanitary fittings and wares.Test as per Consultant req. Attach test report. pressure
gauge
Fittings / Wares Firmly secured & joints properly sealed. Location = drawings (+/-25mm). Mounting height: see below table. Manhole & floor trap visual
covers = approved & securely fixed. Free from leakage, chokage, damages & stains. Flush test report attached
Sanitary Tap Fittings/Wares Height from the bottom of the fittings/wares to FFL (mm)
Wall tile size: 200s x 250h
Wash basin / table top / salad bowl 800 (from the top of wares)
Kitchen sink 830
Paper roll holder 600
Bib tap at bathrooms 600
Shower rose (fixed) 2000
Shower rose (with adjustable rod) 1250 (from the rod bottom)
Shower stop cock, Soap holder 1000
Tap for washing machine 1100
Stop cock for riser / down pipe 2000 (2200 if behind door)
Bath spout 800
Tap at garden 800
(3) SE/QC to mark 'a' if acceptable, 'x' if reject (& circle the respective item) or '-' if not check (not for Post-Installation). MC to rectify if any reject & SE/QC to
re-verify.