0% found this document useful (0 votes)
50 views1 page

Gibraltar Project

The document is a bill of materials and cost estimate for roof framing and tinworks. It lists materials like steel rafters, purlins, roofing sheets and related items, quantities needed, standard sizes, unit costs and total amounts. It estimates the total direct cost to be ₱323,515. It also includes estimates for manpower costs at 50% of direct costs, technical supervision at 10% of direct costs, contractor profit at 10% of direct costs, bringing the total cost estimate to ₱549,975.50. Notes provide additional details on project duration, payment terms, delivery times and exclusions.

Uploaded by

Arvin Gamboa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Gibraltar Project

The document is a bill of materials and cost estimate for roof framing and tinworks. It lists materials like steel rafters, purlins, roofing sheets and related items, quantities needed, standard sizes, unit costs and total amounts. It estimates the total direct cost to be ₱323,515. It also includes estimates for manpower costs at 50% of direct costs, technical supervision at 10% of direct costs, contractor profit at 10% of direct costs, bringing the total cost estimate to ₱549,975.50. Notes provide additional details on project duration, payment terms, delivery times and exclusions.

Uploaded by

Arvin Gamboa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ITEM DESCRIPTION QUANTITY AS TO PLAN STANDARD SIZE QUANTITY UNIT COST AMOUNT

NOTES:
PART A. ROOF FRAMING
1. 30 CONSTRUCTION DAYS WILL BE THE DURATION OF THE
2"X4" TUBULAR STEEL (RAFTERS) 139 LNM 2" X 4" X 1.2MM X 6M 32.00 ₱ 1,013.00 ₱ 32,416.00
PROJECT. POSSIBLE TIME EXTENSION DUE TO UNFORESEEN
2"X4" C-PURLINS 321 LNM 2" X 4" X 1.2MM X 6M 71.00 ₱ 703.00 ₱ 49,913.00 EVENTS.
PART B. TINSMITHRY WORKS
2. OVERHEAD, CONTINGENCY AND MISCELLANEOUS FEES WILL BE
INSULATION FOAMS 180 SQM 50M X 1M 5.00 ₱ 2,500.00 ₱ 12,500.00 USED AS A BUDGET FOR UNFORESEEN PROBLEMS THAT WE MAY
PRE-PAINTED (GRAY) RIB-TYPE METAL 1.00 M(EFFECTIVE WIDTH) X 2.44M X
ENCOUNTER ON THE DURATION OF THE PROJECT.
180 SQM 55.00 ₱ 794.00 ₱ 43,670.00
ROOFING SHEETS GA 26 X 2.44M 0.5MM
PRE-PAINTED (GRAY) RIB-TYPE METAL 1.00 M(EFFECTIVE WIDTH) X 1.83M X 3. PAYMENT TERMS, 50% DOWNPAYMENT, PROGRESS BILLINGS.
180 SQM 72.00 ₱ 600.00 ₱ 43,200.00
ROOFING SHEETS GA 26 X 1.83M 0.5MM
PRE-PAINTED (GRAY) GUTTER,
30 LNM 0.701MM THICK X 2.44M LONG 19.00 ₱ 550.00 ₱ 10,450.00
4. DELIVERY OF ROOFING SHEETS WILL TAKE UPTO 7-10 BUSINESS
GA24(0.701MM) X 2.44M
PRE-PAINTED (GRAY) RIDGE ROLL, DAYS. (MADE TO ORDER) .
15 LNM 0.701MM THICK X 2.44M LONG 10.00 ₱ 550.00 ₱ 5,500.00
GA24(0.701MM) X 2.44M
PRE-PAINTED (GRAY) FLASHING,
26 LNM 0.701MM THICK X 2.44M LONG 16.00 ₱ 550.00 ₱ 8,800.00 5. ELECTRICAL LAYOUT AND ESTIMATE WILL FOLLOW DUE TO
GA24(0.701MM) X 2.44M

FASCIA BOARD 58 LNM 5" X 6 METERS 12.00 ₱ 875.00 ₱ 10,500.00


UNAVAILABILITY OF ELECTRICAL ENGINEER.

SOFFIT 58 LNM 9" X METER 332.00 ₱ 98.00 ₱ 32,536.00

TEX SCREW 1500 PCS TEK SCREW 1,950.00 ₱ 3.00 ₱ 5,850.00

FALSEWORKS 1 LOT 1 DAY 39.00 ₱ 875.00 ₱ 34,125.00

PVC PIPES 15 PCS 4" X 3M S-1000 20.00 ₱ 750.00 ₱ 15,000.00

45DEG ELBOW 10 PCS 4" DIAM. 13.00 ₱ 108.00 ₱ 1,404.00

95DEG ELBOW 10 PCS 4" DIAM. 13.00 ₱ 127.00 ₱ 1,651.00

EPOXY PRIMER 12 LITERS 4 LITERS 4.00 ₱ 1,500.00 ₱ 6,000.00

MOBILIZATION/ DEMOBILIZATION 1 LUMPSUM 1 LUMPSUM 1.00 ₱ 10,000.00 ₱ 10,000.00

TOTAL ₱ 323,515.00

(50% OF TOTAL
MANPOWER QUANTITY LABOR COST ₱ 161,757.50
DIRECT COST)

(10% OF TOTAL
TECHNICAL SUPERVISION 1.00 OCM ₱ 32,351.50
DIRECT COST)

(10% OF TOTAL
CONSTRUCTION FOREMAN 1.00 CONTRACTOR'S PROFIT ₱ 32,351.50
DIRECT COST)

SKILLED LABORERS
(TINSMITH, WELDER, ETC.,)
3.00 TOTAL COST ₱ 549,975.50

UNSKILLED LABORERS 3.00

PREPARED BY: CHECKED AND REVIEWED: CONFORMED BY: