GENERAL CONDITIONS:
1. CONSTRUCTION NOTES
2. SPECIFICATIONS
BE CONSIDERED IN CASE OF THE ABOVE MATTER ARISES. 4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING Foundation, Walls 3500PSI 4" 1" Crushed
5. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN NOR AVAILABLE EXCAVATION HAVE BEEN COMPLETED AND PRIOR TO CONCRETING 3.3 COLUMNS, Walls 3000PSI 4" 3/4" Crushed
IN THE CONTRACT DOCUMENTS FOR ANY PART OF THE WORK, TO CONFIRM THE DESIGN FOUNDATION / SOIL CAPACITY. 3.4 BEAMS, SLAB 3000PSI 4" 3/4" Crushed
SUCH DETAILS SHALL BE DISCUSSED WITH THE ARCHITECT OR 5. DO NOT PLACE NOR FILL USING GRAVEL OR BOULDERS OF
ENGINEER FOR PROPER EXECUTION. GRANULAR FILL MATERIALS AS SUB-GRADE BELOW FOOTINGS. 4. ALL REINFORCED STEEL BARS SHALL CONFORM TO ASTM A615
6. ANY EMBEDDED PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT NATURAL SOIL CONDITION IS BEST SUITED AND PLACE LEAN GRADE 40 FOR 12MM DIA. & SMALLER BARS, AND 16MM DIA & ABOVE
BE PLACED IN SLABS, BEAMS OR WALLS UNLESS SPECIFICALLY CONCRETE OR POLYETHELENE PLASTIC SHEET ABOVE IS SHALL BE GRADE 60.
SHOWN OR INDICATED IN THE DRAWINGS, NOTED NOR SHALL ANY RECOMMENDED. 5. ALL FABRICATION, DETAILING AND PLACING OF STEEL BARS SHALL
STRUCTURAL MEMBERS CUT FOR PIPES, DUCTS & OTHERS. UNLESS 6. ROOF DRAINAGE SYSTEM (RAIN WATER, DOWNSPOUT) SHALL BE CONFORM TO PROVISIONS SET FORTH BY THE PHIL. NSCP 2015
IT IS INDICATED IN THE CONSTRUCTION DRAWINGS, CONTRACTOR DIRECTED AWAY FROM THE FOUNDATIONS. EDITION.
SHALL OBTAIN WRITTEN APPROVAL FOR THE AUTHORITY / S.O. / 7. A STANDBY SUM PIT LOWER THAN THE EXCAVATED FOUNDATION 6. CLEAR DISTANCE SPACING BETWEEN PARALLED BARS IN LAYER
ARCHT / ENGR. FOR INSTALLATION OF ANY ADDITIONAL CONDUIT (FOR MASS OR MAT FOUNDATION WORKS) SHALL BE PREPARED BY SHALL NOT BE LESS THAN 1.50 TIMES THE NOMINAL DIAMETER OF
PIPES OR DUCTS OR RELATED SLEEVES. THE CONTRACTOR TO MITIGATE EXPECTED RAIN, PUMP OUT THE THE BAR, OR 1.33 TIMES MAXIMUM SIZE OF AGGREAGTES, NOR
7. CONTRACTOR SHALL LOCATE AND PROTECT UNDERGROUND OR WATER IMMEDIATELY TO AVOID FOUNDATION BAD CONDITION. LESS THAN 38MM (1.50 INCHES).
CONCEALED CONDUITS, PLUMBING OR OTHER UTILITIES WHERE 8. EXCAVATED AREAS SHALL BE PROPERLY BACKFILLED IN A PROPER 7. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS
NEW WORKS SHALL BE PERFORMED. METHODOLOGY USING DRY EARTH FILL MATERIALS. IN THE EVENT FOLLOWS
8. TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE OF WATER PRESENCE IN THE EXCAVATED AREA, NO BACK FILLING 7.1 FOOTING (EXPOSED TO EARTH) ... . 3" (75MM)
INTEGRITY OF THE STRUCTURE DURING CONSTRUCTION. NEITHER IS ALLOWED, UNTIL WATER IS PUMP AND DRY WELL. BACKFILL FOR 7.2 EXPOSED TO EARTH BUT BUILT WITH FORMS . . 2" (50MM)
THE OWNER / CLIENT NOR ARCHITECT / ENGINEER WILL ENFORCE WALLS SHALL BE PERVIOUS MATERIALS ACCEPTABLE TO THE 7.3 SLAB ON GRADE . . . . . 1.50" (40MM)
SAFETY MEASURES OR REGULATIONS. OR DOLE REQUIREMENTS. IT GEOTECHNICAL ENGINEER. DO NOT PLACE BACKFILL BEHIND WALLS 7.4 COLUMN TIES, SPIRALS, STIRRUPS . . . . . 1.50" (40MM)
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE BEFORE WALLS OR STRUCTURES HAVE ATTAINED THE DESIGN 7.5 SUSPENDED SLABS . . . . . 3/4" (20MM)
ADEQUATE PPE AND ADEQUATE SHORING AND BRACING OF ANY STRENGTH. SHORING AND PROTECT WALLS FROM LATERAL LOADS 7.6 SLAB EXPOSED TO SALTY ENVIRON . . . . . 1.25" (32MM)
STRUCTURE FOR ALL THE LOADS THAT MAYBE IMPOSED DURING UNTIL SUPPORTING MEMBERS ARE IN PLACE AND HAVE ATTAEIND
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO SPECIFIED STRENGTH. 8. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL
DESIGN, CONSTRUCT AND MAINTAIN ASLL SAFETY DEVICES AND LAPPED AT LEAST 40 TIMES THE DIAMETER OR 600MM WHICHEVER
SHALL BE SOLELY RESPONSIBLE FOR CONFORMING ALL SAFETY & IS GREATER. STAGGERED BOTTOM AT LEAST 1.50M FROM SPLICES
HEALTH STANDARDS, LOCAL REGULATIONS, DOLE AND LAWS. IN OTHER BOTTOM REINFORCEMENT. STAGGERED SPLICES FOR
9. OBTAIN PRIOR WRITTEN APPROVAL FOR THE ENGINEER / TOP REINFORCEMENT IS SIMILAR.
ARCHITECT IN CASE CHANGES AND/OR DISCREPANCIES ARE FOUND 9. ALL ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE
IN THE CONSTRUCTION DRAWINGS. PROPERLY POSITIONED AND SECURED IN PLACE PRIOR TO PLACING
CONCRETE.
10. ALL FRESH CONCRETE SHALL BE KEPT MOIST FOR A MINIMM OF 7
DAYS IMMEDIATELY AFTER POURING BY THE USE OF CURING
II. DESIGN Criteria: COMPOUNDS OR OTHER APPROVED MEANS.
11. STRIPPING OF FORMS AND SHORINGS:
1. THE DESIGN CRITERIA IS AS STATED IN THE DESIGN CALCULATION 11.1 FOUNDATION . . . . . 24 HOURS
BY THE ENGINEER. (A) SOIL BEARING CAPACITY (B) CONCRETE 11.2 SUSPENDED SLAB . . . . . 8 DAYS
STRENGTH (C) STEEL MATERIALS - WIDE FLANGE, STEEL BARS (MILD 11.3 BEAMS . . . . . 14 DAYS
& HIGH TENSILE STEEL) (C) CEMENT (D) WATER (E) CEMENT & 11.4 UPON REMOVAL, IT IS REQUIRED TO SHORE BACK WITH FEW
WATER RATIO. SUPPORTS, TO ENGINEER'S APPROVAL.
2. STRUCTURAL DESIGN AND ANALYSIS SHALL BE REFERRED TO THE
STRUCTURAL CALCULATIONS PREPARED BY THE ENGINEER.
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
150MM THICK. LOAD BEARING BLOCKS SHALL HAVE A MINIMUM COATED WITH THE APPROPRIATE PAINT. STEEL AND BOLTS SHALL
COMPRESSIVE STRENGTH OF 750 PSI, WHILE NON-LOAD BEARING BE MINIMUM ASTM A-36 DOMESTIC, LATEST REVISED CODE.
CHB SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 400 PSI. 5. NON-SHRINK GROUT: PREMIXED, NON-METALLIC, CEMENT BASED
2. PROVIDE 1-T16 OR 1-T12 MM DIA. VERTICAL BARS AT CORNERS, GROUT, SHALL MEET THE REQUIREMENT OF ASTM C 827, ASTM C
INTERSECTIONS, END OF WALLS, EACH SIDE OF OPENINGS. 109 AND CRD-C621. WITH MINIMUM COMPRESSIVE STRENGTH OF
3. CONTRACTOR TO PROVIDE DOWEL OR ANCHOR BARS TO COLUMNS 7000PSI AT 28 DAYS.
AND BEAMS (AT SOFFIT) FOR PROPER REINFORCEMENT SYSTEM OF 6. ALL LIGHT WEIGHT STEEL TO BE USED SHALL BE GALVANIZED IN
THE WALLS. USE T10 OR T9MM DIA x 300MM LONG (WITH AT LEAST ACCORDANCE TO MINIMUM HOT DIPPED ZINC GALVANIZED
200MM EMBEDDED INSIDE CONCRETE STRUCTURES). COATINGS.
4. LINTEL BEAMS SHALL BEAR AT LEAST 200MM ON EACH SIDE OF THE 7. PROVIDE MISCELLANEOUS PLATES, ANGLES, BRACKETS, CLEATS,
MASONRY WALL OPENING. THESE APPLIES FOR DOOR & WINDOW ETC AS SHOWN AND STIPULATED IN THE DRAWINGS.
OPENINGS. 8. ALL CUTTINGS AND BLOCKING OF STEEL SHALL BE SHOWN ON
5. WALL REINFORCEMENT SHALL BE AS FOLLOWS: SHOP DRAWINGS AND PERFORMED ACCORDINGLY IN THE SHOP.
Wall Thickness Vertical Bars Horizontal Bars 9. PROVIDE TEMPORARY BRACING AS REQUIRED, FOR SAFETY
5.1 8" 12mm @ 400mm 10mm @ 600mm PURPOSES AND SOUND STRUCTURE UNTIL ALL FINAL
5.2 6" 10mm @ 400mm 10mm @ 600mm CONNECTIONS ARE MADE.
5.3 4" 10mm @ 400mm 10mm @ 600mm
6. CHB BLOCK WALL REINFORCING BARS SHALL BE LAPPED OF 30 BAR
DIAMETERS WHERE SPLICED, HORIZONTAL OR VERTICAL DOWELS
FROM FOOTING, COLUMNS OR WALLS OR SLABS SHALL BE
EXTENDED INTO THE BLOCK WALL, A MINIMUM OF 30 BAR
DIAMETERS OR A MINIMUM OF 300-400MM WHICHEVER IS LONGER
AND DOWELS TO MATCH VERTICAL REINFORCEMENTS OF WALLS.
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
A B C D E E.1 F F.1 G
26.70
4.35 5.05 5.15 1.50 5.32
GB.1
4.1 (0.20X0.40m)
4.18
4.20
(0.20X0.40m)
(0.20X0.40m)
GB.1a
GB.1a
3.77
2.40
S1
GB.2 GB.2 GB.3
(0.20X0.40m) (0.20X0.40m) (0.20X0.40m)
4 GB.3
(0.20X0.40m)
FFL+0.30
NOTES:
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
1. BM. Assumed +0.00 Level at Road Side Kerb.
GB.1
GB.6
GB.6
GB.6
GB.6
2. All FFL Finish Floor Levels to refer from
4.41
S1 S1 S1 S1 Architectural Plans.
0.10
S.3T12 S.3T12 S.3T12 S.3T12
3.1 (0.30x0.20) (0.30x0.20) (0.30x0.20) (0.30x0.20)
0.10
1.30
(0.20X0.40m)
3.43
3.43
(0.20X0.40m)
(0.20X0.40m)
StC.
GB.6
GB.6
S1
GB.6
0.15x0.30
S1 S1
CIS-chb S1
S1
(0.20X0.40m)
S1
GB.7
S.3T12
(0.30x0.20)
(0.20X0.40m)
4.20
15.81
S.3T12
(0.30x0.20)
2.2 S.3T12 S.3T12 S.3T12 S1
GB.6
0.78
(0.20X0.40m)
1.30
GB.6a
GB.4a
(0.20X0.40m)
S1 S1 FFL+0.30
GB.6
(0.20X0.40m)
3.87
(0.20X0.40m)
GB.6
(0.20X0.40m)
GB.3 GB.3
GB.6
(0.20X0.40m)
S1 S.3T12 S.3T12
GB.7a
S1 S1 (0.20X0.40m) (0.20X0.40m)
(0.30x0.20) (0.30x0.20) S1 FFL+0.30
S1
GB.4b GB.3a GB.3a GB.3a
GB.1 S.3T12 S.3T12 (0.20X0.40m) (0.20X0.40m) (0.20X0.40m) (0.20X0.40m)
1.1 (0.20X0.40m) (0.30x0.20) (0.30x0.20)
0.14
Top Bar
T10/0.125m
S.1: All slab to be125mm thk.
5.90
Apron Dowel
Slab on Grade (unless
(0.20X0.40m)
(0.20X0.40m)
S1
(0.20X0.40m)
S.3T12
(0.30x0.20)
(0.20X0.40m)
S.3T12
(0.30x0.20)
S.3T12
(0.30x0.20)
(0.20X0.40m)
otherwise stated)
GB.7
GB.6
(0.20X0.40m)
GB.6
GB.6
GB.6
on 50mm thk Lean Concrete FFL+0.30
S1
GB.6
4.10
4.1 4.18
4.20
F5 F5
2.40
(0.80x0.80x0.25m) (0.80x0.80x0.25m)
F1 F1 F1 F1 F4
(1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.00x1.00x0.30m)
4.41
F1 F2 F4
(1.15x1.15x0.30m) (1.25x1.25x0.30m) (1.00x1.00x0.30m)
0.10
3.1 F1 F1
0.10
1.30
(1.15x1.15x0.30m) (1.15x1.15x0.30m)
F2 F2
3 (1.25x1.25x0.30m) (1.25x1.25x0.30m)
3.43
F4
(1.00x1.00m
F2 F2 x0.30m)
(1.25x1.25x0.30m) (1.25x1.25x0.30m)
4.20
15.81
2.2
2.1 F1 F1 F1
2.08
(1.25x1.25m
2 x0.30m)
F1 F1 F1 F1
1.80
(1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m)
1.1
F1 F1 F1 F1 F1
(1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m) (1.15x1.15x0.30m)
1
F4.a F4 F4.a F4
(1.00x1.00m (1.00x1.00m (1.00x1.00m (1.00x1.00m
4.75 SPA BUILDING x0.30m) x0.30m) x0.30m) x0.30m)
A B C D E E.1 F F.1 G
4.35
26.70
5.05 5.15 1.50 5.33 5.32
RB.1
(0.20X0.40m) 2T12TB/3T12BB
4.1 RB Level & Roofing System to 2T12TB
4.18
4.20
(0.20X0.40m)
(0.20X0.40m)
verify with Architectural Plans.
3T12BB Span Lenght L/2 = Extra T12 Bottom Bar
RB.1
RB.1
3T12BB
2T12TB
2.40
3T12TB Span Lenght L/4 = Extra T12 Top Bar
3T12BB
2T12TB
2T12BB
2T12BB
2T12TB
T10 @ 0.15m x Suspended Slab (unless
3T12TB Plans.
2T12BB 3T12BB 2T12BB 2T12BB 4T12BB 2T12BB 2T12BB 4T12BB 2T12BB 3T12BB 1.55m L Top Bars. otherwise stated)
4. All CHB walls that are not attached with Roof Beams
2T12BB
2T12BB
2T12TB
10mmØ Temp. Bars / 0.20m OC
2T12BB
2T12TB
shall have Roof Tie Beams at minimum size of
2T12BB
2T12TB
BW Bottom Bars. 0.15x0.30m w/ 2T12 TB & 2T12BB, T10@0.15m Tie
2T12TB Slab level shall be checked as Bars.
2T12TB
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
3T12BB per Architectural Plans. 5. All RC Columns & Roof Beams shall have T10 Dowel
3T12BB Slab concrete cover shall be at
RB.1
RB.1
RB.2
RB.2
RB.2
Bars x 0.30m long at 0.45m spacing for columns and
3T12BB
2T12TB
least 25mm. From any concrete
4.41
3T12BB
2T12TB
3T12BB
2T12TB
3T12BB
2T12TB
RTB.1 RTB.1 bars.
structural connection.
3T12BB
6. Roof Tie Beams above CHB Walls shall have
2T12TB
5.71
0.25
T8 Lateral Ties @
3T12BB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
0.10
0.125
7. Lintel Beams LB shall be reinforced concrete beam
3T12TB RB.1 3T12TB
RB.1 RB.1 3T12TB RB.1 LINTEL BEAM DETAIL
0.125mW x 0.25mD with 2T12 bottom bars and 1T12
2T12BB (0.20X0.40m) (0.20X0.40m) (0.20X0.40m) 2T12BB top bars, with T8 lateral ties spaced at 0.125m cc.
2T12BB (0.20X0.40m)
3.1 2T12TB
2T12BB
3T12TB
2T12BB 2T12BB 3T12BB 2T12BB
3T12TB 2T12TB 2T12TB 3T12TB
0.10
2T12BB
3T12TB
1.30
2T12BB
3T12TB
3T12BB 2T12BB
2T12TB 3T12TB
(0.15X0.30m) 2T12BB
(0.20X0.40m)
2T12BB (0.20X0.40m)
RB.1
(0.20X0.40m)
RB.1
2T12TB
2T12BB
3T12TB
2T12TB
3T12BB
2T12TB
2T12TB 3T12TB 3T12TB
3T12BB
2T12TB
3T12TB 3T12TB
(0.20X0.40m)
RB.1
3T12BB 3T12BB
RB.1
3T12BB 2T12BB 2T12BB 2T12BB 2T12BB
3T12TB
RB.1
3T12TB
3T12TB 2T12BB
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
3T12BB
2T12TB
3T12BB
2T12TB
3T12BB
2T12TB
3T12BB
2T12TB
2T12BB (0.20X0.40m)
2T12BB
3T12TB
RB.1
RB.1
RB.1
RB.1
4.20
15.81
2T12BB
3T12TB
2T12BB (0.20X0.40m) 2T12BB 2T12BB (0.20X0.40m) 2T12BB
3T12BB
2.1 2T12TB 2T12TB
2.08
2T12BB
3T12TB
2T12BB
2T12BB
3T12TB
3T12TB
4T12BB 4T12BB
3T12BB
2T12TB
1.30
(0.20X0.40m)
3T12TB 3T12TB
(0.15X0.30m) (0.15X0.30m) (0.15X0.30m) 2T12BB (0.20X0.40m) (0.20X0.40m)
3T12BB
2T12TB
2T12BB
(0.20X0.40m)
2T12BB (0.20X0.40m)
2
(0.20X0.40m)
2T12BB 3T12BB
3T12TB 2T12TB
3T12BB
2T12TB
RB.1
RB.1
RB.1
RB.1
(0.20X0.40m)
3T12TB 3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
RB.1
(0.20X0.40m) 2T12BB 2T12BB
2T12BB 2T12BB
3T12TB 2T12TB
2T12BB
3T12TB
1.80
RB.1 RB.1 RB.1 RB.1
3T12TB
3T12TB 2T12TB 3T12TB 2T12TB 3T12TB 3T12TB 2T12TB 3T12TB
2T12BB 3T12BB 2T12BB 4T12BB 2T12BB 2T12BB 4T12BB 2T12BB (0.20X0.40m) (0.20X0.40m) (0.20X0.40m) (0.20X0.40m)
1.1 3T12TB 3T12TB
2T12BB
3T12TB 3T12TB 3T12TB
3T12TB
RB.1 RB.1 RB.1 3T12TB 3T12TB
2T12BB
2T12BB
3T12TB 3T12TB
3T12TB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
5.90
2T12BB
3T12TB
(0.15X0.30m)
3T12BB
2T12TB
(0.20X0.40m)
(0.20X0.40m)
2T12BB (0.20X0.40m)
(0.15X0.30m)
RTB.1
(0.20X0.40m)
3T12BB
2T12TB
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
(0.20X0.40m)
3T12BB
2T12TB
RTB.1
3T12BB
2T12TB
RB.1
RB.1
3T12BB
3T12BB
2T12TB
2T12TB
RB.1
RB.1
3T12BB
3T12BB
RB.1
2T12TB
2T12TB
RB.1
4.10
RB.1
RB.1
3T12BB
3T12BB
2T12TB
2T12TB
2T12BB
2T12TB
2T12BB
3T12TB
3T12TB
2T12BB
3T12TB
1 2T12TB
2T12BB
2T12TB
3T12BB
3T12TB
2T12BB
3T12TB 2T12TB 3T12TB 3T12TB 2T12TB 3T12TB 3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
3T12TB
2T12BB
2T12BB 4T12BB 2T12BB 2T12BB 4T12BB 2T12BB
A B C D E E.1 F F.1 G
26.70
4.35 5.05 5.15 1.50 5.32
4.1 2.00 2.
anchored by T10 rebars, bended properly.
T10 anchor bars shall be cast in bed to RC
roof beams, spaced accordingly.
4.18
4.20
3. All contacts of truss bottom chords, rafters
shall be leveled by self leveling grout at the
2.40
location of the T10 anchor bars.
R R R NOTES:
4
1. All purlins shall have metal cleats, sag rods
and other accessories needed for the roof
RS1: All slab to system.
be120mm thk. 2. Roof truss elements are made of galvanized
Suspended Slab light weight steel, connected by approved
(unless otherwise metal screw (self tapered tex screw).
R stated)
10mmØ Temp. Bars /
0.20m OC BW Bottom
3. Prior to erection of the roofing system,
contractor to provide approved methodology.
4. All Purlins shall be C Channel type light
8.24
misplaced purlins according to roofing profile.
HT.1
R 0.
R
3.1 35
3.37
0.10
R
1.30
1.35
3 T2
R
R
HT.2
4.20
15.81
2.2 T1
8.28
T3 T3
2.1 T3 T3 R
2 T2
10.20
HT.1
1.1 R
R
5.90
R HT.2
R
R R
R
1 R
2.25
4.75
SPA BUILDING 2.64 2.66 2.66
B.1
1.
NOTES:
R = Rafter, C Channel
2. HT = Hip Truss
SPA ROOFING SYSTEM, TRUSSES
3. T = Full Truss Scale 1:100M
S-4
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
0.30
0.30
T10 Lateral Ties T10 Lateral Ties T10 Lateral Ties
0.35
(10T10@0.05m Top & (10T10@0.05m Top & (10T10@0.05m Top &
Bottom of Column, Rest Bottom of Column, Rest Bottom of Column, Rest
at T10@0.10mcc at T10@0.10mcc at T10@0.10mcc
0.75
0.75
0.75
0.30
0.30
push & break the push & break the push & break the
construction joint. 10T10 @ 0.05m cc construction joint. 10T10 @ 0.05m cc construction joint. 10T10 @ 0.05m cc
Road Kerb Level. To verify with Road Kerb Level. To verify with Road Kerb Level. To verify with Architect.
Architect. T10 @ 0.10m cc Architect. T10 @ 0.10m cc T10 @ 0.10m cc
Natural Ground Level Natural Ground Level Natural Ground Level
1.00
1.00
8T10 @ 0.05m cc 8T10 @ 0.05m cc 8T10 @ 0.05m cc
0.30
0.20
0.30
0.20
0.25
0.15
6T12 Bothways 50mm Lean Concrete. 50mm Lean Concrete. 8T12 Bothways 50mm Lean Concrete. 10T12 Bothways
1.25
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
0.30
0.30
T10 Lateral Ties T10 Lateral Ties
(10T10@0.05m Top & (10T10@0.05m Top &
Bottom of Column, Rest Bottom of Column, Rest
at T10@0.10mcc at T10@0.10mcc
0.75
0.75
0.30
push & break the push & break the
construction joint. 10T10 @ 0.05m cc construction joint. 10T10 @ 0.05m cc
Road Kerb Level. To verify with Road Kerb Level. To verify with
Architect. T10 @ 0.10m cc Architect. T10 @ 0.10m cc
Natural Ground Level Natural Ground Level
1.00
8T10 @ 0.05m cc 8T10 @ 0.05m cc
1.25mW x 1.25mW x
1.25mL x 1.25mL x
0.30mD 0.30mD
T10 Tie T10 Tie
Footing Footing
0.30
0.20
0.30
0.20
50mm Lean Concrete. 7T12 Bothways 50mm Lean Concrete. 7T12 Bothways
1.00 1.00
1.00 1.00
1.00
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
1 1.1 2.2
0.78
4.10 3.87
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @
2T12 Top Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars T10 Lateral Ties @ 0.15mcc 3T12 Top Bars
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 4T12 Bottom Bars 4T12 Bottom Bars
3T12 Bottom Bars
1.85 2.38
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties Ties
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @
2T12 Top Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars T10 Lateral Ties @ 0.15mcc 3T12 Top Bars
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 4T12 Bottom Bars 4T12 Bottom Bars
3T12 Bottom Bars
1.85 2.38
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
3.1 4 4.1
3.43 4.41
0.78 1.03
3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties
Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
3.1 4 4.1
3.43 4.41
0.78 1.03
3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties
Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
A B D E
2.68
4.35 4.18
8T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 8T10 Lateral Ties
8T10 Lateral Ties @ 0.05mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
3T10 Lateral Ties 3T10 Lateral Ties @ 0.05mcc Rest T10 Lateral 8T10 Lateral Ties
@ 0.10mcc @ 0.10mcc Ties @ 0.125mcc @ 0.05mcc
10T10 Lateral Ties @ 0.05mcc Rest @ T10 Lateral Ties 2T12 Top Bars Rest @ T10 Lateral Ties 10T10 Lateral Ties @ 0.05mcc 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars
4T12 Bottom Bars 1.19
T10 Lateral
Ties
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral 4T12 Bottom Bars T10 Lateral
Ties Ties Ties Ties Ties Ties Ties
4.45
2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars
3T12 Bottom Bars 4T12 Bottom Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties
@ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc
10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties
@ 0.05mcc @ 0.05mcc @ 0.05mcc @ 0.05mcc @ 0.05mcc @ 0.05mcc @ 0.05mcc
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
1.21 1.18
1.23 2T12 Top Bars 2T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral 4T12 Bottom Bars T10 Lateral T10 Lateral 4T12 Bottom Bars T10 Lateral
Ties Ties Ties Ties Ties Ties Ties
C D E.1
5.15 4.18
3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties
@ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc
10T10 Lateral Ties @ 0.05mcc 10T10 Lateral Ties @ 0.05mcc 10T10 Lateral Ties @ 0.05mcc 10T10 Lateral Ties @ 0.05mcc
3T12 Top Bars Rest @ 0.125m T10 Lateral Ties 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars Rest @ 0.125m T10 Lateral Ties 2T12 Top Bars
2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars
4T12 Bottom Bars 4T12 Bottom Bars
2.48 1.99
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
D E E.1 F.1
4.18 3.77
8T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 8T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 3T10 Lateral Ties
8T10 Lateral Ties @ 0.05mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.10mcc
@ 0.05mcc 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties
Rest T10 Lateral 8T10 Lateral Ties @ 0.05mcc @ 0.05mcc @ 0.05mcc
Ties @ 0.125mcc @ 0.05mcc
3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars
T10 Lateral
Ties
3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral 2T12 Bottom Bars T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
8T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 8T10 Lateral Ties 3T10 Lateral Ties Rest. T10 Lateral 3T10 Lateral Ties 3T10 Lateral Ties
8T10 Lateral Ties @ 0.05mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.10mcc Ties @ 0.125mcc @ 0.10mcc @ 0.10mcc
@ 0.05mcc 10T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties
Rest T10 Lateral 8T10 Lateral Ties @ 0.05mcc @ 0.05mcc @ 0.05mcc
Ties @ 0.125mcc @ 0.05mcc
3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 4T12 Top Bars 4T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars
8T12 Bottom Bars 8T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom B
2.99
1.84
3T12 Top Bars 3T12 Top Bars 4T12 Top Bars 4T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
G
4.20
3.1 E.1
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
1.95
1.40 0.70
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars T10x0.70m L Shape @ 0.30mcc TB
T10x1.40m @ 0.30mcc TB 2T12 Top Bars
T10 Reinforcement @ 0.30m Bothways T10 Reinforcement @ 0.30m Bothways
T10 Lateral Ties @ 0.15mcc
T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties
0.20
GROUND BEAM GB.3 50mm Lean Concrete. 50mm Lean Concrete.
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
0.125
0.125
ALONG GRID 3 / (0.20m x 0.40m)
Compacted original ground to 95%. Compacted original ground to 95%.
Using Rammer machine, plate compactor not acceptable. Using Rammer machine, plate compactor not acceptable.
MATCH LINE 'C-C'
0.30
TYPICAL SLAB WALL FOOTING BEAM (S.3T12) TYPICAL SLAB REINFORCEMENT AT ENDS
G (0.20m X 0.30m) (T10 x 0.70m w/ L shape End @ 0.30mcc)
4.20
1.95
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
A B B.1
4.75
5.05
1.11 1.11 1.11
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
C D E E.1
5.15 4.18
1.50 2.68
1.21 1.21
3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties
@ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc
10T10 Lateral 10T10 Lateral
10T10 Lateral Ties @ 0.05mcc 10T10 Lateral Ties @ 0.05mcc
Ties @ 0.05mcc Ties @ 0.05mcc
T10 Lateral Ties @ 0.05mcc 3T12 Top Bars Rest @ 0.125m T10 Lateral Ties 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars Rest @ 0.125m T10 Lateral Ties 3T12 Top Bars
2T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
5T12 Bottom Bars
1.19
2.43
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars
10T10 Lateral T10 Lateral Ties 10T10 Lateral
Ties @ 0.05mcc @ 0.10mcc Ties @ 0.05mcc
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
3T12 Top Bars
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
E.1 F F.2 G
2.65 2.66 2.66
3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties
@ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc @ 0.10mcc
10T10 Lateral Rest @ 0.125m T10 Lateral Ties 10T10 Lateral 10T10 Lateral Rest @ 0.125m T10 Lateral Ties 10T10 Lateral 10T10 Lateral Rest @ 0.125m T10 Lateral Ties 10T10 Lateral
Ties @ 0.05mcc Ties @ 0.05mcc Ties @ 0.05mcc Ties @ 0.05mcc Ties @ 0.05mcc Ties @ 0.05mcc
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
1.23 1.23 1.18
3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties Ties Ties Ties
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
1 1.1 2.1
4.10 3.09
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc
2T12 Top Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars T10 Lateral Ties @ 0.15mcc
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 4T12 Bottom Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
4.10 3.09
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc
2T12 Top Bars
2T12 Top Bars 2T12 Top Bars 4T12 Top Bars 4T12 Top Bars 2T12 Top Bars 3T12 Top Bars T10 Lateral Ties @ 0.15mcc
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 6T12 Bottom Bars
3T12 Bottom Bars
1.85 1.42
2T12 Top Bars 2T12 Top Bars 4T12 Top Bars 4T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
3.1 4
4.21 4.41
0.98
1.03
3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties
@ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
10 Lateral Ties @ 0.15mcc 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 4T12 Bottom Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars 2T12 Bottom Bars 4T12 Bottom Bars 2T12 Bottom Bars
GROUND BEAM GB.6 GROUND BEAM GB.6
ALONG GRID C / (0.20m x 0.40m) ALONG GRID C / (0.20m x 0.40m)
MATCH LINE 'F-F'
3.1 4
4.21 4.41
1.17 1.03
3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties
@ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
10 Lateral Ties @ 0.15mcc 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars 2T12 Top Bars 3T12 Top Bars
2T12 Top Bars 2T12 Top Bars 2T12 Top Bars 2T12 Top Bars
4T12 Bottom Bars 4T12 Bottom Bars
2.19 2.06
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 2T12 Top Bars 2T12 Top Bars 3T12 Top Bars
T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral T10 Lateral
Ties Ties Ties Ties Ties Ties
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
1 1.1
4.10 1.79
1.03 1.40
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties 5T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.10mcc
2T12 Top Bars 2T12 Top Bars 6T12 Top Bars 6T12 Top Bars
1.85
2T12 Top Bars 2T12 Top Bars 6T12 Top Bars 6T12 Top Bars
1 1.1
4.10 1.80
0.98
10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties 10T10 Lateral Ties T10 Lateral Ties @ 0.10mcc 10T10 Lateral Ties
@ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc @ 0.05mcc @ 0.05mcc
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars
2T12 Top Bars 2T12 Top Bars 3T12 Top Bars 3T12 Top Bars
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
2 3
4.21
1.50
Rest. T10 Lateral Ties @ 0.125mcc Rest. T10 Lateral Ties @ 0.125mcc
2 3
4.20
0.95
10T10 Lateral Ties 10T10 Lateral Ties 3T10 Lateral Ties 3T10 Lateral Ties 10T10 Lateral Ties
@ 0.05mcc @ 0.05mcc @ 0.10mcc Rest. T10 Lateral Ties @ 0.125mcc @ 0.10mcc @ 0.05mcc
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
A B C D
1.08 1.08
1.08
1.08
0.30
1.49
mm
.
S m cc t
lins LW 600m 1s
C Pur spaced at e start of ile.
0
x10
0mm sure
th prof
x5 0x10 ld make ro of tile
al
x50
tu
1.5x15ctor shou the ac al first.
2.18
ra at ch
Conct should m for approv
x15
purlins Test
2
ers
ord C Ch
p Ch
mb
anne
0.60 S To l
2x15 LWS Top
l LW 50mm
Me
anne 1 x50x
150m Chord
2
0.07
C Channel LWS Bottom Chord 2x15x50x150mm C Channel Light Weight Steel, 2mm thk x 15x50x150mm C Channel LWS Bottom Chord 2x15x50x150mm
1.08 0.98
1.08
1.49
m
.
S m cc t
0m
lins LW 600m 1s
C Pur spaced at e start of ile.
x10
m th prof
100m e sure roof tile
x50x ould mak al
x50
15 tu
1.5x ctor sh
ch the ac al first.
ct ra at ov
Con should m for appr
5
2x1
purlins Test
1.82+-
ers
ord C Ch
p Ch
mb
anne
0.60 S To l
2x15 LWS Top
l LW 50mm
Me
anne 1 x50x
150m Chord
0.60 C Ch x15x50x m
2
0.07
C Channel LWS Bottom Chord 2x15x50x150mm C Channel Light Weight Steel, 2mm thk x 15x50x150mm C Channel LWS Bottom Chord 2x15x50x150mm
Self Leveling Grout
at Least 50mm thick
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
Colar C Channel
2x15x50x150
.
S m cc t
lins LW 600m 1s
mm
Me
m th prof
100m e sure roof tile
x50x ould mak
mb
15 tu al
0
1.5x ctor sh the ac al first.
x10
ra at ch
ers
Conct should m for approv
Test
x50
purlins
2
2.18
2.18
x15
x15
x50
2
ers
x10
ord C Ch
p Ch
mb
anne
0
0.60 S To l
2x15 LWS Top
0.60
mm
l LW 50mm
Me
anne 1 x50x
150m Chord
2
0.07 0.07
C Channel LWS Bottom Chord 2x12x50x150mm C Channel Light Weight Steel, 2mm thk x 15x50x150mm C Channel LWS Bottom Chord 2x15x50x150mm
C Channel Light Weight Steel, 2mm thk x 15x50x150mm
All connections of truss members shall using approved tex
screw 25mmL.
.
S m cc t
lins LW 600m 1s
C Pur spaced at e start of ile.
0mm sure
th prof
x5 0x10 ld make roof tile
al
1.5x15ctor shou e actu first.
100mm
th
ra atch al
Conct should m for approv
purlins Test
2x15x50x
m
C Ch
0m
ord
p Ch anne
S To l
10
0.60 l LW 50mm 2x15 LWS Top
0x
anne 1 x50x
150m Chord
C Ch x15x50x
x5
0.60
0.60 2 m
15
Members
2x
0.07 0.07
rs
be
em
M
C Channel LWS Bottom Chord 2x15x50x150mm C Channel Light Weight Steel, 2mm thk x 15x50x150mm
10.20
SDP DESIGNER : DEVELOPER : CERTIFIED BY : OWNER / CLIENT : PROJECT TITLE: TITLE / DESCRIPTION : SHEET NO :
.
S m cc
lins LW at 600m t of 1st
C Pur spaced ar .
m the st profile
100m e sure roof tile
100mm
15 x50x ould mak tual
1.5x ctor sh the ac al first. C Ch
ra atch anne
Conct should m for approv l
purlins Tes t 2x15 LWS Top
x50x
150m Chord
2x15x50x
m
ord
p Ch
m
0.60 S To
m
l LW 50mm
00
anne 1
C Ch x15x50x
Members
x1
0.60 2
50
5x
0.07
x1
2
rs
be
em
M
C Channel LWS Bottom Chord 2x15x50x150mm
7.30
S .
m cc t
1.07
lins LW 600m 1s
C Pur spaced at e start of ile.
m th prof
100m e sure roof tile
15 x50x ould mak tu al
mm
1.5x ctor sh
ch the ac al first. C Ch
anne
ra at
Conct should m for approv l LW
2x50x100
purlins Test 2x50 ST
x150 op Chord
mm
ord
p Ch
m
0.60 S To
0m
l LW 50mm
Members
anne
10
1
0.60 C Ch x15x50x
0x
2
x5
15
0.07
2x
rs
be
em
M
C Channel LWS Bottom Chord 2x15x50x150mm
7.30
1.00
1.00
T2 CONNECTIONS
1.25
T1a CONNECTIONS
0m
x10
1.25
x50
2.18
s2
mm
er
00
mb
Chord
x1
S Top
Me
50
nnel LW 50mm
C Cha
2x
2x50x1
ers
mb
Me
C Channel LWS Bottom Chord 2x15x50x150mm C Channel Light Weight Steel, 2mm thk x 50x150mm
10.26