CURRICULUM VITAE
SYED SAQUIB JAMIL GILANI
CONTACT No.-0096560952705
E-mail : saquib.gilani@gmail.com
PROFILE :
A result oriented civil engineer with civil engineering background having an Experience
of morethan 19 years in Oil & Gas industry and construction industry. Able to handle
project independently with proper coordination among different departments civil
Supervisor with han6on experience providing successful projects outcomes based on
operational requirements. Managed company craft personnel,Subcontractors,
engineers and owners to minimum safety schedul, profilablity and client satisfaction.
EDUCATION
Bachelors of Engineering in CIVIL from Ghosia Collge of Engineering
Ramanagram,University of Bangalore,Karnataka,India in the year 2003.
APPROVAL DETAILS
1) Kuwait Society of Engineers .card no 42804 (KSE)
2) AApproval from KNPC
COMPUTER SKILLS
Well versed with following software packages:
• MS Office (Word, Excel)
• AUTO CAD
PROFESSIONAL EXPERIENCE
• Working as a project engineer on Abdali, Jurassic production facility at east
roudhatain Alfa line General Trading Company/ Spetco/KOC.
From 10 jan 2021 to still.
*Company Name : Alfa line General Trading Company.
*Client. : Spetco/KOC.
*Project Name. : Construction & Maintenance Services.
1) co ordination regarding scope of work, drawing, responsibilities and progress work.
2)Work standards and adhere to timelines and meet quality assurance targets.
3)Managed quality assurance and quality control requirements of contractor,
including surveying and laboratory testing for concreting operations.
4) Preparred project proposals , including cost estimates, schedules and projects
specifications.
5)Checking of work and ensuring that works is an per specification
drawing Mobilization at site , Planning and execution of work Supervision of
labour and materials.
6)Co ordination with consultants and Architects.
7) Reviewed
Calculations and analytical data to maintain accuracy of technical reports.
8) Road Sewerage, water supply,
Development work on site independently.
9) Maintaining high quality and standards work.
* Worked as project Engineer on Al Mutlaa Housing City (construction,
Completion and maintenance of road works, Network infrastructure services
and substation for 4999 plots from 10 July 2019 to 28 Dec 2020.
*Company Name : Polat Yol Ya Pi Sana Yi Ve Ticaret Aret.KW.
Client : Persona / PHWC
Project Name : Housing
City project (4999 plots)
1)Coordination regarding scope of work,drawing responsibilities and progress
work.
2)Work standards adhere to timelines and meet quality targets.
3)Preparation of site and properly execution as per site condition and as client
specifications.
4) Managed quality assurance and quality control requirements of
contractor , including surveying and laboratory testing for concreting operations
5)Prepared project
Proposals, including cost estimates, schedule and projects specifications.
6)Co ordination with Consultants and Architects.
7)Checking of work and ensuring that works is as per specification
drawing mobilization at site , Planning and execution of work supervised of
labour and materials.
8)Reviewed calculations and analytical data to maintain accuracy of
technical reports.
9)Substation,Road,Fresh Water Supply, Strom water, Sanitary and Main
hole Chambers development work on site independently.
10)Casting for thrust block (90,45,22.5.11.25 degree).
11)Maintaining high quality and standards work.
*Worked as project
Engineer on Abdali Jurassic production facility at east roudhatain with
Alganim/Schlumberger/KOC.from Feb 2017 to 10 June 2019.
Company Name: AlfaLine General Trading Company
Client : Alganim/Schlumberger
/KOC.
Contact No : 16052985
Project Name : 015-1H-1001 Pipe line Construction.
1)Mobilization at site,planning and execution of work, Supervision of labour and
materials. Calculating and adjusting the schedule of work.
2)Co ordinating with the client for carrying and refractory and fireproofing
applicator qualification and inspections.
3)Supervision of fire water laying , Fire hydrant, excavation, foundation
structure and flow line works from initial stage to final stage which includes
planning, scheduling & execution of steel frame structures andI rcc casting.
4) Provided guidance to first class civil labour delivery team and maintained
suitable records for regular audit.
5)Reviewed calculations and analytical data to maintain accuracy of technical
reports.
6)Fire hydrant,Fire water laying, Valve, Drain pits construction, Structure
rack ere action and Foundation structure development work on site
independently.
7)Reviewed calculations and analytical data to maintain accuracy of
technical reports.
8)Maintaining high quality and standards of work.
INESCO INTERNATIONAL CONSTRUCTION COMP
From 20 April 2015 to January 2017
Worked as Project Engineer on Project (Project No. 14050819)
Installation & Replacement of NEW GAS pipeline & Civil associated Work for KOC.
Responsible for all civil work, related to making water tank, car parking ,site office, pipe
removing, pipe installation , asphalt & gutch road cutting ,electrical power cable ,
demolish fence(KOC m/f) corrosion pit, anchor block, valve pit etc. Preparing or
concert casting for the specification of KOC .Co-ordination with the discipline engineer
client ,consultant & sub-contractors.
Carry out all civil progress report on the ongoing activity, involving daily, weekly,
monthly report, daily, weekly, monthly plan, as mention on the site.
GALFAR ENGINEERING CONSTRUCTION COMP.
From 12 Sept 2012 to 15 April 2015
Worked as Project Engineer on Project (Project No. CB/1318) Civil and associated Work
for Bio-Remediation of soil at MINA ABDULLA refinery related to KNPC.
Responsible for all civil work related to bund wall Reservoirs R1 & R2 and Pit 1,2,3 &
Making Site Office, Flied Office, Storage Building, Water Tanker (GRP) & Asphalt Road
Cutting ,Electrical Power Cable Route Laying, Fire Alarm Cable Route Laying, Pump
House & Utilty Facility Work etc.
Casting concert for the specification of KNPC .Co-ordination with the discipline
engineer’s client consultant & sub- contractors.
Carry out all civil progress report on the ongoing active, involving daily report, daily plan,
as mention on the site.
HOT Engineering & Construction COMP.
From 12 JUNE 2011 to 11 Sept 2012
Worked as site Engineer on Burgan project No. 577 (KOC) & No.579 for civil work
of Gas & Oil Pipe Line in KOC Project.
Responsible
Installation and castigation of manhole at site, preparing bed for laying of pipes.
Preparing or casting drain pit, OCM pit, Valve pit, Pipe support etc for
specification of KOC .Co-ordination with the discipline engineer’s client
consultant & sub-contractors. Carrying out all civil progress report on the
ongoing active, involving daily report, daily plan, mention on the site.
Preparing earth work and sub grade, placing crab stone and laying all type of
asphalt. Preparing and casting, for the specification of KOC .Co-ordination with
the discipline engineer consultant & sub-contractors.
SINO HYDRO COMP.
From Oct 2009 to 31st March 2011
Worked as site Engineer on PHWC (Project 1128) For Storm Water (S.W),
Sensatory Sewage (S.S), Water Supply (W.S), Networking. Casting and
Installation storm water and sensatory sewage manhole at site. Preparing bed
for laying of pipes.
Preparing earth work and sub grade, placing karb stone and laying all type of
asphalt & Utility work (electrical, telephone & other cable works).
Casting for the specification of PHWC.Co-ordination with the discipline
engineer’s client consultant & sub-contractors.
Carry out all civil progress report on the ongoing activity, involving daily report,
daily plan, as mention on the site.
O & G ENGINEERING WLL for General Trading & Contracting Comp.
From Oct 2008 to Sep 2009
Designation: Site Engineer
Responsible for Gas Pipe Line & Civil Construction, Replacement & maintenance work in
Ahmadi
Job Profile
1. Excavate slit trenches for underground services.
2. Excavation laying, backfilling and making pipe bream.
3. Installation of pipe marker, crash barrier & pipe support.
4. Inspection of facilities and conducting meeting with project manager.
5. Preparing dial, weekly report, and Monthly report and submit to office.
6. Take part in accident investigation exercised and identify root caused, If
happen.
7. Supervision and Checking of Infra Structure work, Storm Water, Sanitary Line,
Brackish Water Line, and Fresh Water Line.
8. Execution and Supervision of Sub-Structure, Super-Structure, R.C.C works,
from work.
9. Preparing safety plan for construction projects and develop safe working
procedures.
10. Supervision and Checking of Surveying works like: Proposed level, Design level,
Structural level and control point. Also supervision and Checking pile foundation,
pile cap, Steel Structure Sand witch Panel (Kirby).
JIALALL KISHORILALL Building Engineers & Constructions In NEW DELHI/ INDIA
FROM 1st Feb 2007 to 28th Aug 2008
Designation : Site Engineer
Housing project at Noida Sector 38 U.P/INDIA
Job Profile
Supervision and Checking of Surveying works like: Proposed level, Design level,
Structural level and control point. Also supervision and Checking pile foundation,
pile cap, Steel Structure Sand witch Panel (Kirby).
Achieving construction activities like Excavation, Foundation , PCC ,Water Proofing,
RCC and Shuttering Steel Fixing , Casting Concrete , Masonry for brick works , and
Plastering Tile fixing Etc. up to completion .Independently following with Design
engineers of, Architecture and structural update drawing for minor changes as per
as site requirement needed and Inspection before casting columns, slab, beam
,roof Etc.
Looking after construction activities making requisition and facilitating the
arrangement Procurement of construction material , Execution of civil interior and
exterior ground finish work and site supervision.
Carry out Pier Construction, Abutment Construction, Wing wall, Back wall, Returning
wall Construction, Deck slab, Approach slab, parapet wall & etc.
Preparing safety plan for construction projects and develop safe working
procedures.
ACON ENGINEERS & CONSULTANT Company at PATNA/BIHAR IN INDIA
FROM 2nd April 2003 to 15thJan 2007
Designation: Assistant Engineer
Building Construction & Maintenance work at Bihar/INDIA
Job Profile
1. Making daily report/fortnightly.
2. Supervision of work and complete checking of schedule of finishing as per
specification.
3. Controlling the various civil works activities like Excavation Backfilling, PCC, RCC,
Brick work.
4. Preparing reinforcement schedule and give to supervisor/ Forman to implement
at site
5. Inspection of personal protective equipment used by employee.
6. Supervision and Checking of Infra Structure work, Storm Water, Sanitary Line,
Brackish Water Line, and Fresh Water Line.
7. Execution and Supervision of Sub-Structure, Super-Structure, R.C.C works, from
work.
8. Finalizing requirements and specifications in consultation with collaborators
9. Managing daily on-site construction ensuring a timely and cost effective delivery.
10. Conducting project review meetings to track project progress.
11. Short listing and appointing sub-vendors & sub-contractors for various activities &
evaluating their performances periodically
12. Supervising day to day construction activities
13. Providing technical inputs for methodologies of construction & coordination with
Site Management.
14. Preparing & reviewing Method Statements, Work Specific Quality Control Plans, as
per specifications of contract document.
15. Preparing safety plan for construction projects and develop safe working
procedures.
16. Supervision and Checking of Surveying works like: Proposed level, Design level,
Structural level and control point. Also supervision and Checking pile foundation,
pile cap, Steel Structure Sand witch Panel (Kirby).
17. To carry out Pier Construction, Abutment Construction , Wing wall, Back wall,
Returning wall Construction ,Deck slab, Approach slab, parapet wall & etc.
PERSONAL PROFILE
Father’s Name : S M Shahabuddin Gilani
PASSPORT : M2312426
ISSUE DATE : 4/11/2014
EXPIRY DATE : 3/11/2024
Kuwait Driving license D.O.E :23/01/2025
Civil I D.EXPIRY DATE : 14/01/2024
Nationality : Indian
Sex : Male
Marital Status : Married
Religion : Islam
Language Known : English, Hindi, Urdu & Arbi
Local Address : Al halal -shamaq, Block # 8,building21
Al badawiya Street . Flat #15, near
Tehran baqala & Top & Jerry shop
fahaheel , Souk sabha, Street 27,
P.B.No.2108, Kuwiat
SYED SAQUIB JAMIL GILANI
Saquib.gilani@gmail.com