000000Security level: RINA/CL/SENSITIVE#
OUTSTANDING
TOTAL CLOSED MC CERTIFICATE
PUNCHLIST
NO. SYSTEM CODE SYSTEM NAME SYSTEM CATEGORY SYSTEM WALKDOWN DATE A B C (A) (B) (C) ( A) ( B) ( C) ISSUED DATE STATUS
1 100 PV PLANT
2 101 PV FARM
3 102 MAIN STATION
4 200 NSEC TAKE OFF
5 300 SWITCHING SUBSTATION
6 400 69Kv TRANSMISSION LINE
7 500 NGCP CURRIMAO
8 600 OVERALL
Page 1 of
000000Security level: RINA/CL/SENSITIVE#
Page 2 of
SITE INSPECTION PUNCH LIST
68MWAC Currimao Solar Power Project
LOCATION TOTAL PUNCHLIST CLOSED PUNCHLIST
OVERALL PERCENTAGE
Major Punchlist
Total
Closed
Balance
Minor Punchlist
Total
Closed
Balance
oject
CLOSED PUNCHLIST, %
0
0
0
0
0
0
0
0 0
4
unchlist
unchlist
Version :
SITE INSPECTION PUNCH LIST Date Creation :
68MWAC Currimao Solar Power Project
Last Revision Date :
Total Punch List Items :
Punch list Description / Priority
Punch No. Reference drawings System Number Location Category Responsible Party Estimated Completion NAME (ISSUED BY) DATE (ISSUED) NAME (CLEARED BY) DATE (CLEARED BY) NAME (VERIFIED BY) DATE (VERIFIED BY) Status
Non Compliance (High/Med/Low)
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
TOTAL PUNCHLISTS:
APPROVED PUNCHLISTS: PENCIL CLOSED
APPROVED PENCIL CLOSED
PUNCHLISTS, % PUNCHLIST
TOTAL MAJOR PUNCHLISTS:
APPROVED MAJOR PUNCHLISTS:
BALANCE MAJOR PUNCHLISTS:
CLOSED MAJOR PUNCHLISTS (%):
TOTAL MINOR PUNCHLISTS: 0
APPROVED MINOR PUNCHLISTS: 0
BALANCE MINOR PUNCHLISTS: 0
CLOSED MINOR PUNCHLISTS (%): #DIV/0!
1.0
Remarks