  1 Overview
  This procedure must be followed in order of the steps given to avoid potential hardware damage to the detector and to have the
  highest chance. There are a number of detector types and different FRU’s dependent on slot location in each detector. The diagrams
  below along with the replacement parts list in this procedure can help make sure the right part is used in the right location.
NOTE: Replacement Parts below marked as “CHINA ONLY” are only available in China due to regulatory requirements.
  2 Preliminary Requirements
  2.1 Tools and Test Equipment
2.2 Consumables
2.4 Safety
                   DANGER
             CRUSH HAZARD.
             UNEXPECTED GANTRY ROTATION CAN CAUSE SERIOUS INJURY.
             NEVER SERVICE THE GANTRY WITH THE AXIAL DRIVE ENABLED. USE THE GANTRY ROTATION LOCK TO LOCK
             OUT GANTRY ROTATION. SEE SAFETY MENU OF SERVICE DOCUMENT GUI FOR APPROPRIATE PROCEDURES.
                  NOTICE
             Follow ALL required safety and PPE procedures customary for your organization, when working on this product.
  3 Procedure
  3.1 Special Tools overview
      1. Illustration 6 shows the special tools shipped with the new module with the exception of the handle. The handle was only
         shipped with and used on the original VDAS systems. All new modules come with a built in handle.
                                                    Illustration 6 Key
                                                    A                     Handle
                                                    B1                    Multi-tool, version 1
                                                    B2                    Multi-tool, version 2
                                                    C                     Bias Tool
                                                    D                     Controlled Seating
                                                                          Tool
                The Handle (Older VDAS detectors) is attached to the heat sink of the module to aid in removal and installation. The
                heat sink and digital screws can be used to lift the module out if the handle is not available. Newer modules may come
                with built in handles on the heatsink.
                The Controlled Seating Tool is used while installing a module to make sure the alignment pins on the module are
                centered on the detector collimator to avoid any damage to the detector collimator plates during module insertion. There
                are two different tools for this application. The wider tool is used for the HDAS_SATURN_64 modules 1-8 and 49-57 and
                the VCT32 modules.
                The Bias tool is attached via magnet to the detector rail after seating the new module. The Bias tool pushes the module
                against the back detector rail with a known force for proper alignment while the module screws are being torqued. There
                are two slightly different tools for this application. Refer to Illustration 7 to understand which tool to use.
                The Multi-tool is used to aid in clamping the wedge lock after insertion using the notch on one end and for removing light
                seal clips using the pin on the other end. Different versions of the tool exist but all look very similar and have the same
                functionality.
1. If replacing a center module (slots 27-31) perform the following steps. Otherwise go to step 2.
              a. From a C-shell type enableBISfeature . If this has already been done in the past, the message will indicate that this
                 function is already enabled.
              b. If the system did not indicate that the feature was already enabled then a console reboot is necessary to put the change
                 into effect.
      2. At the console start the [FRDM Wizard] from the Common Service Desktop Replacement tab.Illustration 8 shows the main
         screen.
      3. Select the [Replace Module] tab and then [Start Process]. This will set up any necessary preconditions needed in the system
         software to prepare for a detector module replacement. The physical module replacement can now be performed.
      4. Move the table full back out of the gantry and move it full down to allow you to completely move the front cover away from the
         gantry.
      5. Stop the rotor of X-ray tube in case of Liquid Bearing Tube before HVDC off. Refer to Liquid Bearing Tube Rotor stop procedure
         for details.
6. Remove the right side gantry cover and disable Axial Drive and HVDC from the service switch panel.
8. Shut down all gantry power from the service switch panel.
      9. Remove the side, top and front gantry covers. The rear cover needs to be released and moved back slightly to allow easy
         access to the back detector rail.
     10. Reconnect the front cover display and keypad and turn power on to the gantry to allow the table to be moved to full up position
         to use as a work table. Then power down the gantry again.
11. Cover the Tube Collimator port to protect it against dropped tools or screws. (Cloth or any other available item)
1. Remove the Detector Air Plenum as shown in Detector Air Plenum Removal/Installation.
           NOTE: Reminder that using the mouse right button on the above document link and selecting “Open in new Window” will keep
                 this document open at the same time for ease in use. Can leave the Air Plenum instructions open for later use when
                 reinstalling the plenum.
           NOTE: The order of the following steps is critical to success. Do NOT change the order. Read each step and cautions
                 completely prior to performing that step.
      2. Remove cover band end screws (not captive) and loosen 4 middle screws, then slide off the screw cover bands. See
         Illustration 9. Remove the middle screws if needed, the cover bands are slotted in the middle.
           NOTE: If any of the cover band screws are right next to the screw holes for the module being replaced, those screws will need
                 to be removed so they don't interfere with the module seating tool used during module installation.
3. Remove torx screws (not captive) on the light seal plate with the supplied bit, then lift off the light seal plate. See Illustration 10.
           NOTE: If the detector does not have torx screws on the light seal plate, the use a hex wrench to remove the screws. Replace
                 with torx screws supplied with the replacement module during reassembly. Early detectors had hex head screws that
                 will deform with usage.
      4. Put on gloves (supplied with system) before continuing to avoid introducing any contaminates on the detector module or around
         the detector collimator.
5. Remove module screws on either side of carbon window for the module being replaced. See Illustration 11.
      6. Completely loosen the digital cable thumb screws until they pull back freely from the backplane. Do NOT release the wedge
         clamp yet. See Illustration 12.
      7. Pull both cable screws away from the backplane approximately 3/8” (8mm) to release the cable edge card connector from the
         backplane.
      8. Remove the light seal clip on each side of the module. Use the Multi-Tool supplied as shown in Illustration 13. There are two
         different designs for this tool (see Illustration 6)
           NOTE: Early 64 slice Sherlock (VDAS64) detectors and all 32 slice detectors manufactured before JULY 2009 did not have
                 light seal clips so this step can be skipped if the clips are not installed.
                 Insert the MultiTool pin into the Light Seal clip hole, tilt the tool up to pull clip out then pull straight out to finish removing
                 clip.
                 Tool has a magnet to keep metal clips from falling into gantry during removal. The newer clips are plastic, so make sure
                 to catch these clips during removal, as the magnetic tool will have no effect.
           NOTE: Releasing the wedge clamp prior to disconnecting the digital cable from the backplane can damage the digital cable
                 screws or the backplane connector.
     10. Slide the ESD plastic sheet between the AD board and heat sink, along the Z direction, as shown in the left illustration in
         Illustration 15. If module is between two modules, two ESD plastic sheets are required, one in front and one in back of module
         as shown.
           If necessary, gently wiggle the sheet while inserting to place as far into the detector as possible, but do not force the sheet in
           place with excessive pressure.
The ESD plastic sheet should be just slightly below module handle when properly inserted.
                Module alignment notches on the Light seal collar and the pins at the other end of the board must clear the alignment
                slots to allow the module to slide out of the detector.
A digital cable screw can be held with the other hand to aid in guiding the module up and out if needed.
If the module does not seem to move up, check the digital cable. Make sure it is released from the backplane.
                If the module seems to be stuck to the rail such that the flex connections are pulling up when the entire assembly is lifted
                up, STOP. Completely insert the Controlled Seating Tool (seen in Illustration 20) into the detector rails for that module.
                This will keep the module from hitting the detector collimator plates while you gently push up with a finger on the detector
                module front edge to release it from the detector rails. Remove the seating tool and continue to remove the module from
                the detector.
           NOTE: After removing the module avoid touching the flex connection or detector module face. Hold the module by the heat
                 sink or metal bracket on the opposite end of the of the assembly.
     12. After removing the module visually inspect the detector rails to see if any Thermal Mount pads from the detector module were
         left (Some early modules had this problem). The module front end can also be inspected to see if both side pads are still in
         place. See Illustration 18. The pads are seen as thin white squares on the plates that the mounting screws go through.
         Carefully remove any pads left on the rails without touching the detector collimator plates. Any damage to the collimator plates
         will require full detector replacement. Procedure VCT Detector Thermal pad Removal must be used to remove any thermal
         pads.
     13. If the initial problem was an Open Pixel, first check the torque on the module flex screws before installing a new module using
         the following steps. These steps require a Torx T10 size driver bit and the torque driver. Loose flex screws are typically the
         problem for any open pixel issue. Resolution will be known before any calibrations are run.
a. Torque the 3 flex connection screws to the following setting starting with the center screw.
b. Install Module as shown in the next sections and run maratio’s test from DASTools to see if problem has been resolved.
14. If a center set (5 matched modules) is being used repeat this section for all 5 center modules in slots 27 - 31.
           NOTE: Do not touch the detector module face or flex connections. Handle the module by the heat sink, black handle, or metal
                 bracket on the opposite end of the assembly.
           NOTE: If replacement is a center set (5 matched modules) in slots 27 - 31, make sure you install the new center
                 modules in the slot location marked on the new modules. Example, new module marked as slot 27 MUST be
                 installed in detector slot location 27. Repeat the module installation steps for each of the 5 center modules.
2. Install the new module using the following order of steps. (See Illustration 20 for illustrated process with numbered references)
              a. With one hand, insert the Controlled Seating Tool part way (1) so pins do not extend above detector rails to avoid
                 scratching the detector module during insertion. Putting your thumb between the tool and the detector can help control
                 the tool insertion while you insert the module.
              b. Slide the ESD plastic sheet between the AD board and heat sink, along the Z direction, as shown in the left illustration in
                 Illustration 15. If module is between two modules, two ESD plastic sheets are required, one in front and one in back of
                 module as shown.
The ESD plastic sheet should be just slightly below module handle when properly inserted.
c. With the other hand, insert the Module in (2) toward backplane using the black handle.
                 The Detector light seal brackets must be between the module flex connection plates and module light seal plate as
                 shown in Illustration 17 to allow module to slide into detector.
              d. Push the Controlled Seating Tool completely up into detector rails (3a) then lower module down (3b) on top of the
                 seating tool so that the module screw holes engage the seating tool. This will ensure that the module alignment pins do
                 not hit the detector collimator plates during module insertion.
Notes:
                 The module must be seated on the detector rail. DO NOT force it into position. The module will seat on the rail when the
                 module alignment pins are properly aligned.
                 You may have to push the top of the board toward the backplane to engage the top alignment pins if the digital cable is
                 pushing the board away from the backplane.
                 If the Controlled Seating Tool is not used, detector collimator damage may result resulting in outer row image quality
                 issues.
3. Remove the seating tool only after the module is seated on the detector rails.
      4. Attach the bias tool to the detector rail to push the module against the back detector rail with a known force. See Illustration 21.
         The SATURN_64_HD detector requires a slightly different bias tool, which is shown in C2 of Illustration 7. Gloves can be
         removed at this point.
      5. Insert both module screws on either side of the carbon window and torque to the value shown in Table 1. Torque the back
         screw first.
           NOTE: Do NOT push up on the module screws. Pushing up may unseat the module and damage the detector collimator plates
                 when the screws are tightened.
7. Insert the wedge clamp and lock it. (Orientation: Plate of the wedge clamp against the board)
      8. After locking the wedge clamp, carefully install and finger tighten both digital cable thumb screws using the process below to
         help avoid cross threading. The screws will go in easy when properly aligned.
             a. Pull the digital cable screws away from the backplane initially and then in toward backplane to help initial connector
                alignment. Use a flashlight if necessary to see if the connector is aligned to the backplane socket. A “click” can be heard
                when you set down the screws indicating the screws have hit the backplane threaded socket.
             b. Rotate the screws counter clockwise to hear a clicking sound made by the threads of the screw and threads of the
                socket. This will insure that the screws are lined up to the connector prior to threading them in.
             c. Start both screws into the sockets. Thread both screws in together so the cable edge connector is pulled into the
                backplane straight. Stop and back out the screws if any squeak is heard as this indicates cross threading. Try rotating
                the screws counter clockwise until you hear a second “click”. This can help if the screw was previously cross threaded to
                avoid the crossed threads.
             d. May need to carefully pull the digital cable screws to one side to help alignment if needed while performing steps a-c
                above.
      9. Look across the modules from the side to make sure the digital cable screws are seated to the same height as the rest of the
         modules. This will indicate proper connection. SeeIllustration 23 for example side view. Note a top screw may not be fully
         seated in this view. Bottom screws all appear at same height.
10. Insert the light seal clips on either side of the module (for all modules replaced). See Illustration 24.
     11. Suggested but not Mandatory: Use the Deionizing fan to remove any static buildup during the replacement process. Hold the
         fan within 2 feet of the replaced module for 60 seconds.
     12. Visually inspect the light seal plate for any hair or other debris. Wipe clean prior to installation to avoid getting debris inside
         detector.
     13. Install the light seal cover being careful around thermistor wires, using torx head screws. Torque screws to the value shown in
         Table 3.
14. Install the screw cover bands (both bands are identical) and torque the screws to the value shown in Table 4.
           NOTE: The end screws on the screw cover band next to the rotating base frame can not be reached with the torque driver.
                 Just snug them carefully with an offset hex wrench. Do not overtighten.
      3. Connect the front cover cabling but do not install the front cover until after checking module alignments and DAStools tests. The
         display is required to be connected for the test scans.
4. Turn on the gantry power from the service switch panel leaving HVDC and Axial drive disabled.
           Note the current time. It will take the detector approximately 45 minutes to warm up to operating temperature from the time
           power is turned on. The alignment and DAStools tests can be run during the warm-up time but calibrations can not be started
           until the detector is up to temperature.
5. Release the gantry rotational lock and make sure gantry is ready for rotation.
6. Enable axial drive and HVDC from the service switch panel.
      1. From the FRDM Process Tool currently open at the console select [Minicheck] and acknowledge the pop up window if the
         gantry is ready to rotate.
           NOTE: The Wizard will first read the HART data from all detector modules. This will take less than 60 seconds. If this process
                 takes longer, then the communication path to the detector has locked up. Abort the FRDM Wizard, reset the gantry
                 power or perform a scan hardware reset, then restart the Wizard and try again.
The alignment check will start after the scan button is pressed when prompted. (Non-rotating scan)
           If needed later, The alignment check can also be run from a Unix Shell. Open a Unix shell and type the following command:
           zalignmentWizard
      2. The alignment check will run 2 scans and show plots as shown in Illustration 25. Processing will take approximately 2 minutes
         after the scans are run.
NOTE: The plot window must be closed using the [File] menu before DASTools GUI will open.
      3. Check the bottom graph to make sure the module is within specifications defined by Table 5. Use the following guidelines for
         looking at the plots.
              a. The plots autoscale to fit the data. First look at the Y-scale of the bottom plot. If the upper and lower values are at or less
                 than the specification, then all points in the plot are within specification.
              b. Module 1 and 57 are plotted on the very edge of the plots. In the example of Illustration 25, Module 1 can be found at +5
                 just above the zero mark. Module 57 can be found at -8 on the right side edge of the plot.
              c. For any questionable plot point, select [Data Cursor] from the top tool bar and then use the mouse cursor to select the
                 module “+” on the bottom graph. A small window will appear showing the module number and plot value. For example
                 module 30 in Illustration 25 is shown to be at -19.
              d. If more than two side by side modules are replaced at once an out of alignment condition can occur if none of the
                 modules were aligned with the bias tool. This signature is different than any single module. See Illustration 26.
                All 5 modules are out of alignment with the rest of the detector as seen on the top graph, yet modules 26, 27, 31, and 32
                show out of alignment. This is further explained in the alignment wizard user instructions. Note this potential condition
                and see that it is the center 5 modules that all need to be repositioned as shown in the top graph. Modules 26 and 32 are
                effected due to the common edge with modules 27 and 31 and will show better results after the center set is
                repositioned.
4. If the module alignment check does not pass; perform the following:
              a. Reopen the Detector following all previous cautions and steps in Air Plenum Removal and FRDM Removal loosening
                 module screws without actually removing them to allow module realignment.
                 NOTE: If you are working with one of the center 5 modules (27-31), try to reposition the module using the bias tool once.
file:///C:/Users/llswm/OneDrive/Desktop/Service Documentation/SWMR GE DOCS 1/CT/7x LightSpeed VCT/downloadFile(1) - 1/ls-vct/5193574-80…     16/18
4/1/2020                                                            FRDM Replacement Procedure
                          If the module does not align properly follow the special instructions in the Center Module Alignment Procedure to
                          perform special manual alignment.
               b. Always use the bias tool to push the module toward the back rail. After the bias tool is installed, torque the module
                  screws to the value shown in Table 1.
               d. Exit the plot from the previous alignment scan using the File menu (do not minimize the window), Dismiss the DASTools
                  GUI that shows up and select [MiniCheck] again to rerun the alignment wizard test. Rerun the module alignment check
                  to verify proper alignment, perform this step again if alignment is still not passing.
      5. After the alignment plot is closed (not minimized, must exit the window) the DASTools GUI will automatically show up. From the
         DASTools interface run the following rotating tests.
a. Select and Run [mA Ratio Test] (creates/updates the bad channel map)
6. If all the checks pass continue with the next step. If anything fails, troubleshoot per the failed test.
7. Perform any desired quick checks if problem was not a digital issue that was already verified by the mini check tests.
NOTE: Gantry covers MUST be in place and detector up to proper temperature prior to running full calibration.
2. From the FRDM Process Tool currently open at the console select [Prep for Calibrations].
           A test will be run prior to calibrations that will check for center artifacts. This test is specific for center module (27-31) and will
           only be run when a center module is replaced to make sure no center module artifacts have been introduced due to accidental
           movement of a center module. Acknowledge that the system is ready for gantry rotation and then press the [Start Scan] hard
           key when indicated to run the test.
           The Center module test will report a Pass or Fail. If the center check fails, the center module just inserted is not compatible with
           the other center modules and needs to be replaced. A failure will not be a common occurrence since the system has been
           updated with a new calibration vector to account for center module variations. Only significant module issues should cause a
           failure. Potential IQ issues for a failing module include all center related artifacts including center spot and smudge. If the test
           passes, continue with calibrations.
      5. After the above calibrations a [Fastcal] must also be run from [Daily Prep] to complete the updates to the calibrations. (This is
         new with the VCT system)
  4 Finalization
      1. Perform the Quality Assurance Test.
      3. From the FRDM Process Tool currently open at the console select [Update Detector Configuration] when the system is ready
         for customer operation. This will read and update the new detector configuration and perform any background cleanup of
         temporary software files created by the tool during the replacement process.
      4. Fill out the VCT Digital Module Return Form included with the module or online. This information is important for root cause
         analysis of failed parts to improve quality of processes and future parts. This also helps clarify any issue reported that would not
         have been found by normal retests that could result in a No Defect Found.
           Re-package all provided service tools, in the original packages, and place into the FRU shipping container. Failure to return
           these items will result in your Service Contract being billed the significant cost of these tools.
Bias Tool
Multi-tool