This document contains a network diagram showing the tasks, dependencies, and critical path of a project. It displays nodes representing each individual task connected by arrows to show the order and relationships between tasks. The critical path is highlighted showing the minimum sequence of tasks needed to complete the project on schedule.

Uploaded by

Thành Lê
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views2 pages

Aon

This document contains a network diagram showing the tasks, dependencies, and critical path of a project. It displays nodes representing each individual task connected by arrows to show the order and relationships between tasks. The critical path is highlighted showing the minimum sequence of tasks needed to complete the project on schedule.

Uploaded by

Thành Lê
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

0 28

N,28
as
34 62
0 0 0 9 9 62 62 69 69 69
start A,9a E,53 W,7a
0 0 ENDs
as s v as s
0 0 0 9 9 62 62 69 69 69
9 24
I,15a
Critical path
s
47 62
9 23
S,14 Non-critical path
as
48 62
0 14 14 21 21 25 25 28

O,14 P,7 Q,4 R,3

34 48 48 55 55 59 59 62

0 0 0 7 7 8 8 9 9 16 16 61 61 62 62 69 69 69

start B,7 C,1 D,1 F,7 G,45 H,1 X,7 END

0 0 0 7 7 8 8 9 9 16 16 61 61 62 62 69 69 69
9 13 13 15 15 17 17 24
62 63
J,4 K,2 L,2 M,7
Y,1
47 51 51 53 53 55 55 62
668
9 23
62 63
T,14
Z,1
48 62
25
9 28
23 68 69

U,14

48 62
9 16

V,7

55 62