Rates of Material including lead and conveynace charges for the Year 2021-22
MACHINE Deduct
SSR
S. DESCRIPTION OF THE Lead in INITIAL CRUSHING BLASTING initial lead TOTAL RATE
Item UNIT Conveyance
NO MATERIAL Kms RATE CHARGES @ CHARGES charges of IN Rs.
No.
25% 1 Km
1 33.f 40 mm SS 5 metal Cum 18.00 280.24 505 126.25 70.00 -34.24 947.26
2 33.d 20 mm SS 5 metal Cum 18.00 280.24 870 217.50 70.00 -34.24 1403.51
3 33.e 25 mm SS 5 metal Cum 18.00 280.24 830 207.50 70.00 -34.24 1353.51
4 33.b 10 mm SS 5 metal Cum 18.00 280.24 657 164.25 70.00 -34.24 1137.26
5 33.a 6 mm SS 5 metal Cum 18.00 280.24 505 126.25 70.00 -34.24 947.26
6 34 Gravel Cum 10.00 166.18 98 -- -- -35.56 228.62
7 36.b Sand for Concrete (Rock sand) Cum 18.00 280.24 590 -- -- -34.24 836.01
8 36.b Sand for Concrete (River sand) Cum 66.00 879.11 600 -- -- -35.56 1443.55
9 36.c Sand for filling, blindage Cum 66.00 879.11 600.00 -- -- -35.56 1443.55
10 33.c 12 mm SS 5 metal Cum 18.00 280.24 781 195.25 70.00 -34.24 1292.26
11 22.g RR masonary (Granite) Cum 18.00 280.24 239 -- 70.00 -34.24 555.01
12 23.a CR masonary (Granite) Cum 18.00 280.24 249 -- 70.00 -34.24 565.01
Stone boulder of size 150 mm size
13 18.00 280.24 90 -- 70.00 -34.24 406.01
33.z3 Cum
Stone boulder of size 150-200mm
14 18.00 280.24 146 -- 70.00 -34.24 462.01
22.d.iii size Cum
15 18.00 280.24 148 -- 70.00 -34.24 464.01
22.d.iv Stone boulder of size 300 mm size Cum
Stone dust (HBG stone chips 2.36
16 18.00 280.24 524 131 -- -34.24 901.01
35.b mm and below) Cum
17 36.a Sand for mortar Cum 1139.78 -- -- 1139.78
18 HYSD steel (Fe-500) MT 57000 57000.00
19 Structural steel MT 70000 70000
20 Cement MT 5600 5600
21 P.C drawn wire/H.T wire 4mm) MT 62000 62000
SOR 2021-22 (15%) Page: 189 R.M.R.
22 40 -45 mm metal (Hand broken) Cum 18 280.24 520 70.00 -34.24 836.01
23 Stone boulders of size 150mm Cum 18 280.24 90 ---- 70.00 -34.24 406.01
SOR 2021-22 (15%) Page: 190 R.M.R.